City of Malibu
23825 Stuart Ranch Road · Malibu, California · 90265-4861
Phone (310) 456-2489 · Fax (310) 456-3356 · www.malibucity.org
______________________________________________________________________________
REBUILD OPTION ACKNOWLEDGEMENT
Administrative Plan Review (APR) and Coastal Development Permit (CDP) Entitlements
By electing to apply for an Administrative Plan Review or a Coastal Development Permit in lieu of a
Planning Verification (same day approval), please be aware, the project will require additional
review time, fees, technical reports and documents, which may include but not be limited to:
Department Review Fees (subject to scope of work)
Site Survey
Shall be prepared, wet-stamped and wet-signed by a registered civil engineer or licensed surveyor (NAVD88
must be used for vertical datum).
Color Coded Slope Analysis
Original to be wet-stamped and signed by a licensed surveyor or registered civil engineer based on the site
survey, based on 5’ contours, indicating slope categories and the square footage of the following categories:
Less than 4:1, 4:1 to 3:1, 3:1 to 2½:1, 2½:1 to 1:1, and 1:1 and greater. The plan shall include the footprint of
all proposed structures (including walls, pools, etc.)
Archaeology Report
A Phase I Inventory Report prepared by a qualified archaeologist. All Phase I Inventories that involve
a
ny excavation or monitoring shall be conducted in consultation with a qualified Chumash Cultura
l
Re
sources Monitor.
Hydrology Report
See: https://www.malibucity.org/DocumentCenter/View/287/Hydrology-Hydraulic-Report-
Requirements?bidId
Geotechnical Report
See: https://www.malibucity.org/DocumentCenter/View/215/Geotechnical-Guidelines?bidId
Discretionary Request for Height or Setback Reduction
Discretionary Request Fee
C
ertified Public Notice Property Owner and Occupant Addresses, Radius Map
Story Pole Plan, Certification, and Photos
Upon receiving Department approvals, a Story Pole Plan must be submitted showing the location and
heights of all proposed new structures.
*Final fees will be determined upon pre-submittal review of the project.
I hereby certify that I am presently the legal owner of the above-described property. Further, I have
read the above information and have chosen a rebuild option other than a Planning Verification and
acknowledge the filing of this application may require additional processing time, fees, technical
reports and documents as discussed above.
PROPERTY OWNER SIGNATURE PROPERTY OWNER NAME (PRINT) DATE
Sign
Here!