City of Malibu
23825 Stuart Ranch Road · Malibu, California · 90265-4861
Phone (310) 456-2489 · Fax (310) 456-3356 · www.malibucity.org
______________________________________________________________________________
REBUILD OPTION ACKNOWLEDGEMENT
Administrative Plan Review (APR) and Coastal Development Permit (CDP) Entitlements
By electing to apply for an Administrative Plan Review or a Coastal Development Permit in lieu of a
Planning Verification (same day approval), please be aware, the project will require additional
review time, fees, technical reports and documents, which may include but not be limited to:
• Department Review Fees (subject to scope of work)
• Site Survey
Shall be prepared, wet-stamped and wet-signed by a registered civil engineer or licensed surveyor (NAVD88
must be used for vertical datum).
• Color Coded Slope Analysis
Original to be wet-stamped and signed by a licensed surveyor or registered civil engineer based on the site
survey, based on 5’ contours, indicating slope categories and the square footage of the following categories:
Less than 4:1, 4:1 to 3:1, 3:1 to 2½:1, 2½:1 to 1:1, and 1:1 and greater. The plan shall include the footprint of
all proposed structures (including walls, pools, etc.)
• Archaeology Report
A Phase I Inventory Report prepared by a qualified archaeologist. All Phase I Inventories that involve
a
ny excavation or monitoring shall be conducted in consultation with a qualified Chumash Cultura
l
Re
sources Monitor.
• Hydrology Report
See: https://www.malibucity.org/DocumentCenter/View/287/Hydrology-Hydraulic-Report-
Requirements?bidId
• Geotechnical Report
See: https://www.malibucity.org/DocumentCenter/View/215/Geotechnical-Guidelines?bidId
Discretionary Request for Height or Setback Reduction
• Discretionary Request Fee
• C
ertified Public Notice Property Owner and Occupant Addresses, Radius Map
• Story Pole Plan, Certification, and Photos
Upon receiving Department approvals, a Story Pole Plan must be submitted showing the location and
heights of all proposed new structures.
*Final fees will be determined upon pre-submittal review of the project.
I hereby certify that I am presently the legal owner of the above-described property. Further, I have
read the above information and have chosen a rebuild option other than a Planning Verification and
acknowledge the filing of this application may require additional processing time, fees, technical
reports and documents as discussed above.
PROPERTY OWNER SIGNATURE PROPERTY OWNER NAME (PRINT) DATE