Verify Each of the Following Required Conditions
All work completed in accordance with applicable NFPA standards, city ordinances and / or standards
No change of use. Previous use (if known)_______________________________________________
Proposed use___________________________________________
Work will not change hydraulic calculations
No moving / relocating mains or cross mains
Limited to Light / Ordinary Hazard
Inspection Requirements
Plans and cut sheets (for new equipment) on site and stamped by WA State certified designer (at the
appropriate level based on type of project)
Cover Inspection of the piping prior to installation of the ceiling or ceiling tile
Final inspection of the completed system.
Re-inspection fees may apply if:
- Work was not in accordance with permit application
- Work not ready for inspection
As built drawings
I hereby certify that I am the owner (or owner’s authorized agent) of this property or an appropriately licensed contractor
(or the firm’s authorized agent) and the installation of the work described will be performed in accordance with all
applicable laws & codes, including state contractor registration laws. I understand that failure to comply may result in
revocation of any permit from this application.
Signature____________________________________________________Date__________________________
IMPORTANT APPLICANT INFORMATION
Application or construction documents will be reviewed within a reasonable time period based on the current workload. Construction
documents which do not conform to the requirements of 16.05, 16.10 and 16.20 SMC will be rejected in writing, stating the reason(s).
Applications for which no permit is issued within 18 months following the date of application shall expire by limitation. Applications may also
be canceled for inactivity, if an applicant fails to respond to the department’s written request for revisions, corrections, actions or additional information
within 90 days of the date of request. The Building Official may extend the life of an application if any of the conditions listed under SMC 16.20.225 (3)
exist.
The Permit Center may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit
issued and not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn
or canceled before any plan review is done. No refund shall be made for application or plan review fees where a plan review has been performed and
the application is rejected in accordance with 16.20.220 SMC. The Permit Center shall not authorize refunding of any fee paid except on written
application filed by the original permittee not later than 180 days after the date of application.
All provision of laws and ordinances governing this type of work shall be complied with. The granting of a permit does not presume to give
authority to violate the provisions of any local, state or federal law regulation construction of the performance of construction.
Every permit shall expire 2 years from date of issuance. SMC 16.20.235