801 228
th
Ave NE
Sammamish, WA 98019
425-295-0500 | www.sammamish.us
2020-01-CUP Page 1 of 5
CONDITIONAL USE PERMIT
APPLICATION
ABOUT CONDITIONAL USE PERMITS
Code Reference
Conditional Use Permit
SMC 21A.110.040
Resources
King County iMap
Sammamish Property Tool
Questions?
Submit Project Guidance
Visit the Permit Center
City of Sammamish
801 228th Ave SE
Sammamish, WA 98075
www.sammamish.us
A Conditional Use Permit allows for a certain use on a property that would
not typically be allowed for that zoning district.
Conditional Use Permit also include rules that must be followed to ensure
compatibility within neighboring areas.
APPLICATION REVIEW PROCESS
A Conditional Use Permit is a Type 2 decision made by the Director.
FEES
Applicants are responsible for providing an initial deposit (as well as
additional deposits as needed) to cover all application review costs.
FEES APPLICABLE TO THIS PROJECT
Counter Service Intake, Type 2
Preliminary Review Deposit
Legal Notice Publication & Mailing Deposit
Environmental Consultant Services (if applicable)
Environmental Checklist Review (if applicable)
See current fee schedule
2020-01-CUP Page 2 of 5
CONDITIONAL USE PERMIT APPLICATION
OWNER INFORMATION
Owner is organized as an LLC*
Name:
Company:
(if applicable)
Address:
Phone:
E-Mail:
APPLICANT/REPRESENTATIVE INFORMATION
Applicant is organized as an LLC*
Name:
Address:
Phone:
E-Mail:
*O2020-513 requires owners/applicants organized as a single-member or multiple-member LLC to provide the
names and addresses of all members, including all individuals who hold transferable interests in the applicant
or its members. Please provide this information using the supplemental form on www.MyBuildingPermit.com.
PROPERTY INFORMATION
Property Address:
Parcel Number(s):
Total Lot Area(s):
Total Critical Areas on Property:
(Square Feet)
(Square Feet)
Please complete the below for any critical areas on property:
Type
Total Area
Type
Total Area
(Square Feet)
(Square Feet)
Frequently flooded area
Lake
Landslide area
Critical aquifer recharge area
Seismic hazard area
Wetland
Erosion hazard area
Stream
Erosion hazard near sensitive
water bodies overlay
Fish & wildlife habitat
conservation area
Do you control the property where the work is being proposed (lease, easement, or fee-ownership)?
Yes
No
Property Information continued on next page
2020-01-CUP Page 3 of 5
CONDITIONAL USE PERMIT APPLICATION
PROPERTY INFORMATION CONTINUED
Is the proposed project located on a parcel that abuts the King County Trail Corridor?
Yes
No
Does the proposal require the use of or crossing the King County East Lake Sammamish Regional Trail for
access to the project site?
Yes
No
SUBMITTAL CHECKLIST
A PDF of each document is required at time of submittal. Please label files as numbered and listed below:
(For example: 02 Project Narrative)
01. Signed Application Form
02. Project Narrative
Briefly describe the site and the project
Include description of land use that requires the Conditional Use Permit
03. Preapplication Conference Letter
04. Acceptance of Financial Responsibility - Affidavit of Applicant Status
05. Historic Resources Affidavit
06. Water Availability Certificate
07. Sewer Availability Certificate
08. Preliminary Septic Approval (if required)
09. Eastside Fire & Rescue Plan Review Sheet
10. Neighborhood Meeting Proof of Completion
11. Title Report (<30 days old)
Must be less than 30 days old
Must be for the parcel(s) related to this application
12. Legal Description
Must be for parcel(s) related to this application
Must be a title verified description by a Washington State licensed surveyor
13. Mailing List, Map, and Labels
Include all property owners within 1,000 feet of the site (2,000 feet for properties within the
Erosion Hazard Near Sensitive Water Bodies overlay)
Utilize the Excel template provided and upload a PDF version, with the map, under “Mailing
List, Map, and Labelsin MyBuildingPermit.com
After submittal, the City will request the Excel version of the template via email
Submittal Checklist continued on next page
2020-01-CUP Page 4 of 5
CONDITIONAL USE PERMIT APPLICATION
SUBMITTAL CHECKLIST CONTINUED
14. SEPA Checklist (if applicable)
15. Critical Area Affidavit
16. Critical Area Study (if applicable)
17. Geotechnical Report (if applicable)
18. Criteria Compliance Narrative
Detail how the application meets each of the criteria listed in SMC 21A.110.040.
The use is designed in a manner compatible with the character and appearance of existing or
proposed development in the vicinity of the subject property.
The location, size and height of buildings, structures, walls and fences and screening vegetation
for the conditional use shall not hinder neighborhood circulation or discourage the permitted
development or use of neighboring properties.
The use is designed to be compatible with physical characteristics of the subject property.
Requested modifications to standards are limited to those mitigating impacts in a manner equal
to or greater than the standards of Title 21A SMC.
The conditional use is not in conflict with the health and safety of the community.
The conditional use is such that pedestrian and vehicular traffic associated with the use will not
be hazardous or conflict with existing and anticipated traffic in the neighborhood.
The conditional use will be supported by adequate public facilities or services and will not
adversely affect public services to the surrounding area or conditions can be established to
mitigate adverse impacts on such facilities.
For applications related to a commercial property, in addition to the above, please provide:
A description of the proposed use, including the number of employees and hours of operation
The number of on-site and off-site parking spaces
The number of vehicular trips to be generated by the proposal
The total square feet of the building area
The total square feet of the impervious surface area
19. Survey – Boundary and Topographic
20. Traffic Concurrency Certificate
21. Traffic Impact Analysis Report
For proposals generating 10 or more new vehicle trips during AM or PM peak hour
May also be required for projects not generating 10 AM or PM peak hour vehicle trips (see the
Public Works Standards for requirements)
22. Storm Drainage Analysis (Technical Information Report)
23. PW Standards Deviation (if proposed)
24. Plan Set
2020-01-CUP Page 5 of 5
CONDITIONAL USE PERMIT APPLICATION
1
4
3
2
CERTIFICATIONS & SIGNATURES
I have read this application in its entirety and certify that all information submitted, including any
supplemental information, is true and complete to the best of my knowledge. I acknowledge that willful
misrepresentation of information will terminate this permit application. I understand that my submittal will be
reviewed for completeness and, if found to be complete, will be processed pursuant to Chapter 20.05 SMC.
Owner Signature:
Date:
Applicant/Representative Signature (if applicable):
Date:
ONLINE SUBMITTAL INSTRUCTIONS
Create an account on MyBuildingPermit.com.
Select “Apply For Permit” and then select “Sammamish” as the jurisdiction.
Select the following:
Application Type
Land Use
Project Type
Any Project Type
Activity Type
Use Approval
Scope of Work
Conditional Use
C
omplete & save this form before uploading it in the “File Upload” section along with the required
submittal documents.
click to sign
signature
click to edit
click to sign
signature
click to edit