Revised 01/10/2018
Interpretation:
A non-partisan educational or candidate forum, sponsored by any not-for-profit or non-profit group,
such as the League of Women Voters, a local PTSA, the Chamber of Commerce, etc. is not a
“political” event for the purposes of this policy.
Advocacy regarding any position on an issue before a legislative, legislatively created body or
judicial body, whether or not the issue is on a public ballot is not permitted.
Information advising of a public meeting, hearing or other event before a legislative, legislatively
created body or judicial body that is neutral on the merits of the issue being covered is permitted.
Standards for language, symbols or logos used on the banner
General Standard: The city will establish standards for message content
Detailed Standard:
The message has no political, religious or for-profit message. Not-for-profits and non-profits,
including religious organizations, may use a banner for fundraising purposes. This provision shall
not prohibit display on the banner of the name and corporate symbol of a sponsor of an event.
The message is not offensive or inappropriate.
Letter size, shall be not less than 12 inches in height. This includes event, organization, dates and
places. Logo and sponsor names may be any height.
Banners are not to be illuminated, have any attention-getting lights or to contain any wording or
symbols similar to those found on official traffic control signs or devices. (RCW 46.61.075 and
47.36.180).
Banner Permit Fee
The fees are based on the following:
The banner fee is based on the cost of mobilization - the time to install and time to remove
including needed traffic control resources. NOTE: Return calls or emergency removal due to
banner failure would be additional costs based on time, equipment and materials. Emergency
removal costs are NOT included in the banner permit fee—they are the responsibility of the
sponsoring organization.
The cost of additional liability insurance is not included in the fee. The City will provide the
necessary insurance without fee.
The cost of processing the permit application is not included in the fee. The City is providing this
service without fee.
The banner fee is per banner per site, each banner pole is a separate fee.
Applicant Initials ______