2019-01-RUE Page 3 of 5
REASONABLE USE EXCEPTION APPLICATION
PROPERTY INFORMATION CONTINUED
Is the proposed project located on a parcel that abuts the King County Trail Corridor?
☐
☐
Does the proposal require the use of or crossing the King County East Lake Sammamish Regional Trail for
access to the project site?
☐
☐
SUBMITTAL CHECKLIST
A PDF of each document is required at time of submittal. Please label files as numbered and listed below:
(For example: 02 Project Narrative)
☐
01. Signed Application Form
☐
02. Project Narrative
☐
03. Preapplication Conference Letter
☐
04. Acceptance of Financial Responsibility - Affidavit of Applicant Status
☐
05. Historic Resources Affidavit
☐
06. Water Availability Certificate
☐
07. Sewer Availability Certificate
☐
08. Preliminary Septic Approval (if required)
☐
09. Eastside Fire & Rescue Plan Review Sheet
☐
10. Title Report (<30 days old)
− Must be less than 30 days old
− Must be for the parcel(s) related to this application
☐
11. Declaration of Covenant & Easement
☐
12. Legal Description
− Must be for parcel(s) related to this application
− Must be a title verified description by a Washington State licensed surveyor
☐
13. Mailing List, Map, and Labels
− Include all property owners within 1,000 feet of the site (2,000 feet for properties within the
Erosion Hazard Near Sensitive Water Bodies overlay)
− Utilize the Excel template provided and upload a PDF version, with the map, under “Mailing List,
Map, and Labels” in MyBuildingPermit.com
− After submittal, the City will request the Excel version of the template via email
Submittal Checklist continued on next page