2020-01-PSUB Page 4 of 5
SUBDIVISION – PRELIMINARY APPROVAL
SUBMITTAL CHECKLIST CONTINUED
☐ 14. Mailing List, Map, and Labels
− Include all property owners within 1,000 feet of the site (2,000 feet for properties within the
Erosion Hazard Near Sensitive Water Bodies overlay)
− Utilize the Excel template provided and upload a PDF version, with the map, under “Mailing List,
Map, and Labels” in MyBuildingPermit.com
− After submittal, the City will request the Excel version of the template via email
☐ 15. SEPA Checklist
☐ 16. Critical Area Affidavit
☐ 17. Critical Area Study (if applicable)
☐ 18. Geotechnical Report
☐ 19. Arborist Report
☐ 20. Criteria Compliance Narrative
− Can be a matrix and/or narrative format
− Details how the application meets all applicable local and state regulations
☐ 21. Survey – Boundary and Topographic
☐ 22. Traffic Concurrency Certificate
☐ 23. Traffic Impact Analysis Report
− For proposals generating 10 or more new vehicle trips during AM or PM peak hour
− May also be required for projects not generating 10 AM or PM peak hour vehicle trips (see the
Public Works Standards for requirements)
☐ 24. Storm Drainage Analysis (Technical Information Report)
☐ 25. PW Standards Deviation (if proposed)
☐ 26. Plan Set
M
ust be prepared by a licensed land surveyor or engineer and include:
− The name and seal of surveyor or engineer
− Space for the file number of subdivision to be added after the application is accepted
− The location description based on legal description
− Compass, scale, and date
− A delineated boundary of project site and ordinary high water mark (if applicable)
P
lan Set continued on next page
Submittal Checklist Continued on next page