This application is in regard to the following Infrastructure
Wastewater (Section A) Stormwater (Section B)
Potable Water Supply (Section C)
Wastewater connection – Connection completed by registered Plumber/Drainlayer
Material & Diameter:
Estimated date of Completion:
Stormwater connection – Connection completed by registered Plumber/Drainlayer
Material & Diameter:
Connection type: (kerb & channel or to stormwater main
Estimated date of Completion:
Urban water supply connection – Completed by Council Staff only
Reason for application Commercial
New Dwelling Industrial
Existing Dwelling Other (please state):
I require the Council to supply the boundary manifold (toby) and manifold box (this is an additional cost)
Material & Diameter of connection:
Date Connection Required: (GDC staff to attend site -
min 5 working day’s notice
)
Specific information for applicants
• GDC staff are responsible for completing the tapping and connection to the water main only. Any extra
work or fittings required will be charged accordingly.
• Any additional fittings and labour required by Council staff to complete the job, other than the actual
water main connection, will be invoiced to the applicant upon completion of the work.
• Urban Supply: All fittings used from the water main to the manifold shall be installed to the Council’s
approved standard. Any existing redundant service lines must be disconnected at this time.
• A minimum of five working day’s notice is required before proposed work is to begin on site.
• Extraordinary water users shall be required to install an approved water meter. Extraordinary is defined
by the Water Supply Bylaw 2010
• This application may result in the property being liable for financial contributions for water and/or
wastewater.
Office Use Only Receipt number:
Water application fee paid: Y N Amount paid:
Officer Initials: Date:
Application for Piped Services Connection
2