Job Name:
Job Number:
Page
SPECIFICATION SUBMITTAL
369-623b 1 05.06.12
Submittal Package
Lighting Control System
System Solutions
LCP/XPS System On-Site System Start-up
Model numbers LSC-OS-SU-LCP and LSC-OS-SU-XPS
What Standard GRAFIKTM LCP/XPS Start-up includes:
One visit to the job site during normal business hours. This is one visit between the hours of 7 AM and
5 PM on a Monday through Friday that is not a Lutron Holiday.
This visit may require multiple days depending on the size of the system.
Phased construction projects (requiring multiple visits) should verify this was included with the system
provider.
Visits can be made outside these hours for an additional charge.
Lutron requires a notice of fifteen (15) business days to schedule a start-up date. Shorter notices may incur
expedite fees.
All terminations will be done by the installing agency. A person from the installing agency needs to be
present for the startup. This person should be familiar with the installation of the system.
A Lutron factory certified technician performs all system start-up items.
Logistics:
To schedule onsite service e-mail us at www.lutron.com/scheduling or call at 1.800.523.9466.
Please contact Lutron 3 weeks prior to the requested visit date.
System start up includes:
Verification that the XPS/LCP is installed according to Lutron specifications.
Panels should be energized in by-pass fully lamped and tested prior to our arrival.
Load circuits are checked for shorts and overloads and bypass jumpers are removed.
Programming the dimming/switching panels to include:
- Panel addressing
- Proper load types as installed in field or as per approved submittal drawings. As installed conditions
take precedence. This system may have modular components and if loads differ from design additional/
different equipment may be required.
- Circuit to zone assignment as per approved submittal drawings. If no zoning information exists prior
to start-up, programming will be done according to written instructions from end user or end users
representative, contractor, or will be based upon the Lutron provided sequence of operations in that order
of priority.
- Set light levels and fade times on controls as per approved submittal drawings. If no information is
provided, test scenes will be set to 100%, 75%, 50% and 25% and default fade times will be set to
3 seconds.
- Program emergency function per the installation guide for the system. This may not be applicable for
every system.
Toll Free 24/7 Tech Support Line 1.800.523.9466
Field Service Scheduling 1.800.523.9466 ext 4439
or www.lutron.com/scheduling
Job Name:
Job Number:
Page
SPECIFICATION SUBMITTAL
369-623b 2 05.06.12
Submittal Package
Lighting Control System
System Solutions
Programming the wall controls/interfaces to include:
Control addressing
Verify proper wiring and operation of control link
Set up controls to function as per approved submittal drawings. If no control functionality is included, controls
will be programmed according to written instructions from end user or end users representative, contractor,
or will be based upon the following rules:
- Motion sensors:
o In spaces with a wall control, motion sensors will be set up as a vacancy sensor (only automatically
turning off the lights) with 15-minute +/- 1-minute timeout.
o In spaces without a wall control, motion sensors will be set up as occupancy sensors (automatically
turning the lights on and off) with a 15-minute +/- 1-minute timeout.
- Daylight sensors:
o Calibrated in such a manner to provide 40 fc +/- 5 fc 3 ft (91 cm) off the floor at a specific point in the
room, typically the center of a desk or directly under a fixture. Note the consistency of light distribution
throughout the space is highly dependent upon fixture design and placement.
- Wall controls:
o One button Toggle lights on and off.
o Two button Top button will turn lights on and bottom button will turn lights off.
o More than two buttons.
- For Dimmed zones: Top buttons will set the lights to different levels. Bottom button will turn the
lights off.
- Timeclock settings:
o Lights on the Lutron® system on the building’s exterior will turn on at sunset and turn off at sunrise.
Test all buttons to assure proper operation
Occupancy sensor
- Verification of proper installation and operation. If a sensor is not installed in accordance with Lutron
procedures, Lutron will not continue startup activities on that sensor until the installation issues are
corrected.
- Unless otherwise noted, a rough calibration will be performed at system start-up. Final calibration is the
responsibility of the end user since it is very dependent on furniture placement, HVAC operation, and space
usage. Lutron will not fine-tune occupancy sensors to detect minor movements in the space or to not
detect motion that contributes to false-trips.
Photocell
- Verification of proper installation and operation. If a sensor is not installed in accordance with Lutron
procedures, Lutron will not continue startup activities on that sensor until the installation issues are
corrected.
- Unless otherwise noted a rough calibration will be performed at system start-up. Final calibration is the
responsibility of the end user since it is very dependent on furniture placement, window treatments, outside
weather conditions and space usage. Lutron will not fine-tune photocell sensors to achieve specified foot-
candle readings.
Time clock set up
- Lutron will set up the system location, daylight savings, and time of day preparation for event programming.
- Lutron will set up time clock events as per the approved submittal drawings or written instructions from end
user or end users representative, contractor in that order of priority.
- In lieu of instructions, the time clock will not be programmed.
Toll Free 24/7 Tech Support Line 1.800.523.9466
Field Service Scheduling 1.800.523.9466 ext 4439
or www.lutron.com/scheduling
Job Name:
Job Number:
Page
SPECIFICATION SUBMITTAL
369-623b 3 05.06.12
Submittal Package
Lighting Control System
System Solutions
Items not included in standard on-site startup:
Lutron service technicians will not perform work on non-Lutron® equipment. Lutron will work with other
manufacturers on integration of equipment by others.
Programming or any other changes that are requested to be performed counter to the approved submittal
drawings must be approved in writing via the proper channels.
Field wiring changes or corrections that delay the startup process such that additional time is required for
Lutron to complete the startup will result in additional charges.
Replacement of controls damaged due to miss-wires or incorrect installation or any other related issue not
covered under the Lutron warranty is the responsibility of the installer.
Reprogramming of any functions after initial programming and sign-off.
End user training on overall system operation. Typical training agenda listed below:
This system is not typically sold with a separate visit for the training of the end user. Check with purchasing
agent if this is required.
It is the responsibility of the person scheduling the startup to ensure the appropriate end users are present for
system training. Lutron typically does not have these contacts.
Additional charges will apply if a separate visit is required for training the end user.
Video media is not provided by Lutron for training sessions. This may be provided by “others” for turnover to
the end user or job site documentation.
System demonstration and sign-off by the end user.
Additional items that are not included with standard startup, but may be purchased—check your
quote to verify an item has been included with your quote. The quantity of the items listed below on
the BOM will determine how many days are included with this item.
LSC-AF-VISIT - Aim and focus visit with design team or end user. This visit is typically coordinated by the
construction team, that includes designers, Lutron, and end user to set up light levels and adjust fixtures.
LSC-SYSOPT - System optimization visit with end user. This visit is coordinated by the EC or end user to
optimize the system performance to specific project details.
LSC-WALK - Start-up agent or design team walk-through visit. The construction team and the agent requiring
the walk-through coordinate this visit. This visit is for any type of additional walk-through that is required for
job completion.
LSC-SILV/GOLD/PLAT-IW - These are Technology Support Plan numbers for the system per the
specification. Warranty information is supplied within the submittal documentation.
LSC-TRAINING - This visit is for additional time on the job for training the end user. The EC or the end user
typically coordinates this visit.
LSC-AH-SU - After hours start-up. If normal business hours are not acceptable for start-up, after hours start-
up can be purchased.
LSC-LEED-DOC - Solution Assurance Documentation that describes the pre-functional tests, functional tests,
and test results.
Additional items listed below may be charged for additional costs incurred.
LSC-SITE-RDY-CHG - Site ready charge. Jobsite not ready.
LSC-SRVC-OVERRUN - Charge for additional time/manpower required due to contractor turn-over issues.
LSC-CHANGE-ORDER - Charge for a change in sequence of operation after the commissioning has begun
LSC-INT-SUPPORT - Charge to provide onsite support to the System Integrator or IT Professional related to
difficulties integrating to the Lutron lighting control system.
Toll Free 24/7 Tech Support Line 1.800.523.9466
Field Service Scheduling 1.800.523.9466 ext 4439
or www.lutron.com/scheduling
Job Name:
Job Number:
Page
SPECIFICATION SUBMITTAL
369-623b 4 05.06.12
Submittal Package
Lighting Control System
System Solutions
XPS/LCP system description
XPS is a Lutron® Switching System that is designed to provide exceptional value and reliability to our
customers. It utilizes Lutron® patented arcless Softswitch® circuit that dramatically increases the lifetime of
the system over conventional switching relay systems. Even when fully loaded, the arc elimination extends
a relay’s average rated life to more than 1,000,000 on/off cycles. Digital wall controls may be purchased
for simple control in the space. The product also features an integrated time clock for automated system
control.
LCP is a Lutron® Dimming/Switching System that is designed to provide exceptional value and reliability to
our customers. It allows the end used to use dimming and switching in the same panel for all of the space
requirements. Digital wall controls may be purchased for simple control in the space. The product also
features an integrated time clock for automated system control.
Both systems are similar in appearance, programming, and maintenance, however the XPS is solely a
switching system and LCP can have dimming and switching capability in the same panel.
XPS/LCP Training Visit—Typical Agenda (duration—approximately 1 hour):
Review of XPS/LCP system with end-user (control location and function).
Discuss system model numbers
Discuss Lutron lexicon—what is a zone, scene, fade rate, delay rate, etc.
Review all system components
Panel(s) and XPS/LCP Controller
- Bypassing outputs
- Spare dimmer cards/modules, switching modules
- Load schedule
- Programming of timeclock
Wall controls
- Addressing
- Reprogramming
Troubleshooting system. Panels, processor, controls, interfaces
System integration (if applicable)
Warranty information
Review Service and Support Guide | Lighting Control System
Tech support
Preventive maintenance
Toll Free 24/7 Tech Support Line 1.800.523.9466
Field Service Scheduling 1.800.523.9466 ext 4439
or www.lutron.com/scheduling