1 of 1 05/2020
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
Virtual Inspecon Checklist
Replace Water Heater
Contractor
Permit Number
Address
Technicians Name
Technicians Phone
Required Images and Sequence - Please video or photograph the following items in the order listed:
q
Permit
q
Front elevaon of home/business
q
T&P valve
q
Relief drain line
q
Pan and pan drain line (where required)
q
Hot and cold water connecons
q
Protecon (post or stop where required)
q
Clearances as required (tape measure)
q
Stand (where required)
q
Insulaon of hot water outlet
q
Vacuum relief valve (required for boom feed units)
q
Vent (if gas red)
Signature__________________________________________________________ Date _______________________________
click to sign
signature
click to edit