1 of 1 05/2020
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
Virtual Inspecon Checklist
Plumbing Re-Pipe
Contractor
Permit Number
Address
Technicians Name
Technicians Phone
Required Images and Sequence - Please video or photograph the following items in the order listed:
q
Permit
q
Front elevaon of home/business
q
Thermal Expansion Device
q
Piping Material
q
Connecons to Tub/Shower valves
q
Hot and cold water connecons
q
Vacuum Breakers on Hose Bibbs
q
Main Shut O Valve
q
UV Piping Protecon (Where required)
q
Pipe Support/Strapping
q
Water-Hammer Arrester (Where required)
Signature__________________________________________________________ Date _______________________________
click to sign
signature
click to edit