1 of 1 05/2020
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
Virtual Inspecon Checklist
A/C Changeouts
Contractor
Permit Number
Address
Technicians Name
Technicians Phone __________________________________________________________________
Required Images and Sequence - Please video or photograph the following items in the order listed:
q
Permit
q
Front elevaon of home/business
q
Vericaon of wire size/collar
q
AHRI Cercate
q
Ultra Violet protecon coang data sheet
Condensing Unit Inspecon, the Inspector will view the following:
q
Anchors
q
Ultra Violet protecon coang/physical protecon
q
Vandal proof refrigerant port caps
q
Unit label- minimum/maximum Ampacity and unit model number
q
Clearance around unit
q
Disconnect
Air Handling Unit Inspecon, the Inspector will view the following:
q
Unit support/access
q
Auxiliary drain pan
q
Condensate drain/access/materials/terminaon
q
Duct connecon /ex/duct board
q
Unit label- minimum/maximum Ampacity and unit model
q
Disconnect
Electrical breaker panel, allow the Inspector to view the following:
q
Breaker size & labeling
Signature__________________________________________________________ Date _______________________________
click to sign
signature
click to edit