APPLICATION FOR STANDARD PLAN APPROVAL
RESIDENTIAL CONSTRUCTION < 1.0 Acre Disturbed
For the purposes of this Standard Plan, residential construction means residential and auxiliary structures such as detached garages,
sheds, pole barns, and other structures that create additional imperviousness.
Applicability Criteria
1. The total land disturbance will not exceed 1.0 Acre on any individual lot within the proposed project.
2. The proposed construction is for residential development that does not create common lands, common open space, or a
public street.
Standard Conditions for All Residential Construction
1. Construction site stormwater management best management practices will be used. Standard Detail and Specification DE-
ESC-3.7.1 ESC For Minor Development will be followed during construction (see attachment).
2. Approval of this Standard Plan does not relieve the applicant from complying with any and all federal, state, county or
municipal laws and regulations.
Stabilization Conditions
1. Following initial soil disturbance or redisturbance, temporary or permanent stabilization with seed and mulch shall be
completed within 14 calendar days to the surface of all disturbed areas not actively under construction.
2. Specific stabilization recommendations may be found in the Delaware Erosion and Sediment Control Handbook, 3.4.3
Standard and Specifications for Vegetative Stabilization.
Site Information
Site Location (911 Address or road name with distance to nearest intersection):
Tax Parcel ID:
Parcel Total Acres (nearest 0.1ac): Disturbed Acres (nearest 0.1ac):
Applicant Information
Owner:
Mailing Address:
Owner Phone:
Owner Email:_______________________________________
Builder:
Mailing Address:
Builder Phone:
Builder Email:_______________________________________
Fees
The review fee is $165 for any standard plan approvals disturbing less than 1.0 acre. Make checks payable to City of Newark.
PWWR SWM Std Plan App - Residential LT 1 AC [May 2020].pdf
1 of 2
Last Revised: May 2020
Applicant Certification
I, the undersigned, certify that the information supplied on this Application for Standard Plan Approval is accurate, the proposed
land disturbing activity meets the criteria established, and all conditions of this Standard Plan Approval will be met by the applicant,
builder, contractor, and owner during construction and post construction.
Applicant Signature: Date:
Applicant Printed Name: Title:
***THIS STANDARD PLAN APPLICATION FORM MUST BE MAINTAINED ON THE SITE AT ALL TIMES DURING CONSTRUCTION***
Approval Information (for office use only)
Approval # Fee Paid: $
Approved by: Approval Date:
Title: Expiration Date:
PWWR SWM Std Plan App - Residential LT 1 AC [May 2020].pdf
2 of 2
Last Revised: May 2020
click to sign
signature
click to edit
Source: Symbol: Detail No.
Standard Detail & Specifications
ESC for Minor Development
DE-ESC-3.7.1
Sheet 1 of 2
Adapted from IN DNR,
"Erosion Control for the
Home Builder"
LEGENDLEGEND
LEGENDLEGEND
LEGEND
Flow Inlet protection - Type 1
Silt Fence SF
Sensitive Area Protection SAP
Stabilized Construction Inlet Protection - Type 2
Entrance SCE
Proposed Structure
Stockpile
IP-1
IP-2
SCE
SAP
SAP
SFSF
SF
SF
SF SF
SF
IP-1
IP-2
t
s
s
t
t
t
Downspout
Extender
(Typ.)
Property Line (Typ.)
Effective February 2019
Source: Symbol: Detail No.
Standard Detail & Specifications
ESC for Minor Development
Construction Notes:
1. Evaluate the Site.
a. Identify Vegetation To Be Saved
b. Protect Trees and Sensitive Areas
2. Install Perimeter Erosion And Sediment Controls.
a. Protect down-slope areas with vegetative filter strips.
b. Protect down-slope areas with silt fence.
c. Restrict all lot access to stabilized construction entrance to prevent vehicles from tracking
mud onto roadways.
d.
Install inlet protection on nearby storm drain inlets.
3. Prepare the Site for Construction.
4. Salvage and Stockpile the Topsoil/Subsoil
5. Build the Structure(s) and Install the Utilities.
6. Install Downspout Extenders
7. Maintain the Control Practices.
a. Maintain all erosion and sediment control practices until construction is completed and
the lot is stabilized.
b. Inspect the control practices a minimum of twice a week and after each storm event,
making any needed repairs immediately.
8. Revegetate the Building Site.
a.
Redistribute the stockpiled subsoil and topsoil.
b. Seed or sod bare areas.
c. Mulch newly seeded areas.
9. Remove Remaining Temporary Control Measures.
DE-ESC-3.7.1
Sheet 2 of 2
Adapted from IN DNR,
"Erosion Control for the
Home Builder"
Effective February 2019