Standard Conditions
1. Impervious surfaces will be graded to sheet flow to pervious areas to the maximum extent practicable.
2. All non-impervious disturbed area will be vegetated to original or better condition.
3. Construction site stormwater management best management practices will be used.
4. Approval of this Standard Plan does not relieve the applicant from complying with any and all federal, state, county or
municipal laws and regulations.
Stabilization Conditions
1. Following initial soil disturbance or redisturbance, temporary or permanent stabilization with seed and mulch shall be
completed within 14 calendar days to the surface of all disturbed areas not actively under construction.
2. Specific stabilization recommendations may be found in the Delaware Erosion and Sediment Control Handbook, 3.4.3
Standard and Specifications for Vegetative Stabilization.
Applicant Certification
I, the undersigned, certify that the information supplied on this Application for Standard Plan Approval is accurate, the
proposed land disturbing activity meets the criteria established, and all conditions of this Standard Plan Approval will be met by
the applicant, builder, contractor, and owner during construction and post construction.
Applicant Signature: Date:
Applicant Printed Name: Title:
***THIS STANDARD PLAN APPLICATION FORM MUST BE MAINTAINED ON THE SITE AT ALL TIMES DURING CONSTRUCTION***
PWWR SWM Std Plan App - Bridge & Culvert [May 2020].pdf