q. ☐ ‘Any sanitary sewer laterals proposed to be reused shall be visually inspected (televised) by the
Developer and approved for re-use by the Public Works and Water Resources Department.’ Contact
Shawn Gealy, Water and Wastewater Inspector, at (302) 229-1396 a minimum of 48 hours in advance
of the CCTV work and provide a digital copy to the Public Works and Water Resources Department.
r. ☐ ‘A DNREC “Construction of Wastewater Collection and Conveyance Systems” permit will be required
and shall be furnished to the City prior to CIP approval.’ Required for projects that generate more
than 2000 gallons per day average sewer flow.
s. ☐ ‘A signed and sealed copy of the DNREC approved sanitary sewer as-built plans shall be furnished to
the City within 30 days of DNREC approval.’
t. ☐ ‘The required fire protection flow rate for the building is __________.’ The required sprinkler flow
rate for each building is to be determined by the engineer and/or sprinkler system designer.
u. ☐ ‘The Developer shall paint all existing and proposed fire hydrants associated with this project to
reflect the flow capacity and apply 2-inch reflective tape in accordance with the State Fire Code.’
v. ☐ ‘Sprinklers are required in all units and all fire protection systems shall be submitted to the City of
Newark Fire Marshal’s office for review and permitting prior to issuance of building permit.’
w. ☐ ‘A Blue Card holder will be on site at all times during construction to ensure all sediment and
stormwater regulations are adhered to.’
x. ☐ ‘A concrete washout area shall be installed and approved by the Public Works and Water Resources
department.’
7. ☐ Professional Engineer/Land Surveyor certification block: (signed, dated, and sealed):
‘I [Name] certify that I am a registered Professional [Engineer/Land Surveyor] in the State of Delaware with a
background in civil engineering. To the best of my knowledge and belief, I certify that the information on this
plan is true and correct to the accuracy required by accepted surveying standards and practices, the proposed
construction as shown on this plan complies with applicable laws and regulations, and this plan includes all
information required by the latest revision of the ‘City of Newark Construction Improvement Plans Checklist.'
8. ☐ Owner’s/Applicant’s certification: (signed and dated):
‘I [Name] certify that I am the owner of the property which is subject of this plan and that the land use action
proposed by this plan is made at my direction.’
9. ☐ Location for Signature of public works director, city secretary, and city manager.
10. ☐ If a Standard Plan is applicable, add all conditions, including runoff reduction practices, to the Lines and Grades
Plan and provide a complete Standard Plan Approval application. Otherwise a detailed plan is required. If a
Best Management Practice (BMP), Conveyance Mitigation Area or Runoff Reduction Practice, collectively
referred to as a BMP, include all design and construction details and provide the following note on the plan:
‘A P.E./P.L.S. must certify that the Best Management Practice is installed and functioning as designed and
identify any discrepancies from the regulations and/or approved plans and any design changes from the
original design prior to issuance of a Certificate of Occupancy.’
11. ☐ Existing and proposed contours at one (1) foot intervals, with labeling of at least every fifth contour. Two (2)
foot intervals may be acceptable for areas of 15% or steeper slopes. Areas with slopes between 15 and 25
percent and greater than 25% shall be identified.
12. ☐ Identification and boundaries of soils classifications as indicated by the New Castle County Soils Survey.