Major Customer Connection Enquiry
July 2016
3
Please note that this form is only applicable to Major Customers (as defined in Ergon Energy’s Pricing Proposal, which is available on Er-
gon Energy’s Network Pricing webpage https://www.ergon.com.au/network/network-management/network-pricing
) seeking a load or altera-
tion to a existing connection or contract.
For an
Export Embedded Generation connection enquiry, please use the relevant Export Embedded Generation Enquiry Form located on
our Embedded Generation webpage (https://www.ergon.com.au/network/connections/major-business-connections/embedded-generation
)
which details the relevant application process for other types of embedded generation connections.
For a
Non Export Embedded Generation connection enquiry, such as for Embedded Generator via an Inverter Energy System > 30 kVA (Non
-export), please use the Non-Export Embedded Generation Enquiry Form located on our Embedded Generation webpage (
https://
www.ergon.com.au/network/connections/major-business-connections/embedded-generation) which details the relevant application process
for other types of non-export embedded generation connections.
SECTION D
Please tick the service you require
(see Major Customer Connection Guideline for more information on these services)
Services - Load (> 1,500 kVA), External Design
Please tick
Provision of general advice, specifications etc.
(Not applicable to Generation enquiries 5MW and above.)
A Planning Report (prepared for the purposes of submitting an Application to Connect)
Fee Applicable
Project Scope (prepared for the purposes of submitting an Application to Connect)
Fee Applicable
External design review and technical support—pre-application
Fee Applicable
Customer owned asset advice
Fee Applicable
Connection Details
New Connection – Load > 1,500 kVA (If you require a new connection either to a new premises, property
or equipment above 1.5 MVA)
Alteration to an Existing Connection or Contract - If you require an upgrade of the existing supply or
require modification to an existing contract
Other - If your enquiry does not relate to any of the above options, but is still a Major Customer (ICC or
CAC) connection, please ensure you describe your enquiry in the form of an attachment to this enquiry.
SECTION C SECTION E
Options for Construction & Ownership of Connection Assets
Please choose from the following options. Quotes for services will be provided when available and will only be indicative in
nature at this stage. Further information can be found in the Major Customer Connection Manual
on the Ergon Energy website.
Option 1: Ergon Energy Build, Own and Operate Connection Assets (EE BOO)
Option 2: Major Customer Design, Construct and Transfer Asset Ownership to Ergon Energy (DCT)
Option 3: Major Customer Build, Own & Operate (BOO)
Option 4: Unsure at this stage
Please note that all works in connection with the shared distribution system will be designed, constructed and
owned by Ergon Energy