9. Applicant and/or its successors shall promptly remove said approach from county right-of-way or shall relocate or
adjust said approach, at its sole cost and expense when requested to do so by the County. When the applying
company and/or its successors uses an existing road or section line easement, the applying company shall be
responsible to pay for all costs of moving, relocating, or reconstructing the said approach, should Billings County
deem it necessary or advisable, in its sole discretion, to repair or reconstruct existing roads or to build new roads
on section lines or off section lines as allowed by North Dakota State law. Should the applicant and/or its
successors fail to take necessary steps to relocate, or reconstruct its approach, the county may take steps to have
the same accomplished, and the applying company agrees to reimburse the county for all expenses incurred by
Billings County in moving, relocating or reconstruction of the approach so the existing roads may be repaired or
reconstructed, or new roads may be built on the section line or off the section line as allowed by North Dakota
law.
10. If at any time Billings County wants to excavate in this area and if it should require the said approach to be
moved, it will be at the expense of the applying company and/or its successors.
11. Applicant and/or its successors shall repair or replace highway structures and appurtenances, and any existing
facilities located on, over or under highway right-of-way, which may be damaged as a result of the installation
and maintenance of said approach on highway right-of-way.
12. A GPS’d drawing of proposed location must be placed on file with Billing County Auditor and must show at a
minimum:
The location of the proposed facility from a section or quarter line, section, township and range where
the said approach will be placed.
Existing Road(s)
Proposed Access Road with the location of the approach clearly marked.
13. During construction or when encroaching upon a public roadway the applicant is required to provide proper
signage such as “Roadwork Ahead or Equipment Working.”
14. All permits are valid for one year upon approval by the County Commissioners
Before Commencement of construction, the applicant must meet with the road foreman from the district in
which construction shall take place.
Applicant (Representative, Company) ___________________________________________________________________
Applicant Address (Address, City, State, Zip) _____________________________________________________________
Phone Number(s) of Applicant _______________________________________ Fax _____________________________
Email ____________________________________________________________________________________________
AUTHORIZED SIGNATURE_______________________________________ TITLE__________________________
PERMIT FEE: $25.00 for Ag & Residential $100.00 for Commercial & Industrial
(Make check(s) payable to Billings County)
*Credit card transactions are accepted by calling the zoning office at 701-623-4810*
click to sign
signature
click to edit