Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 1 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Quantum Light Management Hub (QP2)
The Quantum Light Management Hub (QP2) connects
Lutron QS devices, Lutron power panels, Lutron
EcoSystem drivers and DMX512 devices to your
Quantum lighting control system.
Features
• Designed to control, manage, and monitor any Lutron
Energi Savr Node units, Lutron power panels, GRAFIK
Eye QS units, Sivoia QS shade / drapery systems,
EcoSystem drivers and DMX512 devices.
• Supports both astronomic and time-of-day events to
automatically control the lights and shades in
the system.
• Simple reconfiguration of a space without rewiring for
EcoSystem devices.
• Individually control, monitor, and adjust any light or
shade in a space.
• QS links and EcoSystem loops are
topology-free.
• For EcoSystem devices, the light management hub
accepts one normally closed (NC) emergency input.
• EcoSystem bus may be wired NECR Class 1 or
IECPELV / NECR Class 2.
QP2 Hub Capabilities
• Each Quantum Light Management Hub (QP2) supports
up to 8 EcoSystem loops, (4Quantum bus supplies).
• Each loop can have a combination of 64 EcoSystem
devices with a maximum of 16 daylight sensors,
32 occupancy sensors, and 64infrared (IR) devices,
attached across the devices.
• Supports up to 2 Quantum processors with
2 links each that can be individually configured to
communicate with:
– Quantum bus supply (limited to one link per QP2 hub)
– Lutron power panels
– Lutron QS devices
DMX-512 devices for lighting zones
(use QSE-CI-DMX for DMX integration zones)
DMX-In DMX-Out QS Panel DBI
DMX-In
DMX-Out
QS
Panel
DBI
Allowed combinations of links a single processor:
1
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 2 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Specifications
Regulatory Approvals
cULusR Listed (Reference: ULR File E42071)
CSA Certified
California Energy Commission Listed
Seismic Certified (Test Method AC156. Reference
OSHPD Preapproval OSP-0215-10)
NOM certified models available
Power
• Input voltage: 120 V~, normal/emergency feed
50/60 Hz 15 A
• Output: EcoSystem - 18 V- 250 mA per loop
Processor - 24 V- 1 A per link
Physical Design
• Enclosure: NEMA Type 1, IP-20 protection
16 U.S. gauge steel
• Weight: 45 Ib (20.4 kg) (with packaging)
Seismic Certification Limits: S
DS
= 2.5 g, z/h = 1.0,
I
P
= 1.5. Contact Lutron for details.
Mounting
• Surface-mount only
Environment
• For indoor use only
• 32 ºF to 104 ºF (0 ºC to 40 ºC)
• Relative humidity less than 90% non-condensing
2
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 3 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
How to Build a Model Number
Example
QP2 - 2P8CSE - 120
Hub
Type
Number of
Processors
Number
of Loops
Accessory
Device
Voltage
Hub Type
QP2 = Quantum Light Management Hub
Number of Processors
0P = 0 Quantum processors
1P = 1 Quantum processor
2P = 2 Quantum processors
Number of Loops
0C = 0 EcoSystem loops
2C = 2 EcoSystem loops
4C = 4 EcoSystem loops
6C = 6 EcoSystem loops
8C = 8 EcoSystem loops
Accessory Device
SE = 5-port Unmanaged Ethernet Switch
Voltage
120 = 120 V~
Available Model Numbers
Contact Lutron for options not listed below.
QP2-0P0CSE-120 (for rough-in use)
QP2-1P0CSE-120
QP2-1P2CSE-120
QP2-1P4CSE-120
QP2-1P6CSE-120
QP2-1P8CSE-120
QP2-2P0CSE-120
QP2-2P2CSE-120
QP2-2P4CSE-120
QP2-2P6CSE-120
QP2-2P8CSE-120
Additional Model Numbers
QS-1P - This is the Lutron model number for an
additional processor that can be added to the hub.
A panel can have a maximum of two processors but
the panel can be ordered with 0, 1 or 2. This model
allows a processor to be added in the field.
Q-2C - This is the Lutron model number for an
additional EcoSystem bus supply. Each bus supply
connects two EcoSystem loops to the processor. A
panel can have a maximum of eight loops but can be
ordered with 0, 2, 4, 6 or 8 loops. This model allows
additional bus supplies to be added in the field.
3
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 4 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Dimensions
Shown as in (mm)
15.75 (400)
15.75 (400)
12.75 (324)
2.5
(63.5)
26.5
(673)
31.5
(800)
31.5
(800)
5.81 (148)
0.15
(4)
Front ViewLeft Side View Right Side View
Top View
Bottom View
4
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 5 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Mounting and Conduit Entry
• Surface-mount indoors.
• Hub generates heat. Mount only where temperature will be 32 ˚F to 104 ˚F (0 ˚C to 40 ˚C).
• This equipment is air-cooled. Do not block vents or warranty will be void. A minimum of 12 in (305 mm) of
unobstructed space is required in front of and below the hub for ventilation.
• Water damages equipment. Mount in a location where the hub and processors will not get wet.
• Mount within 7˚ of true vertical.
• EcoSystem loop wiring can be Class 1 or IEC PELV / NECR Class 2; always keep Class 1 and Class 2 wiring
separate, and follow all applicable local and national electric codes.
• Reinforce wall structure for weight and local codes.
Hub Maximum BTUs/Hour Weight (without packaging)
All models 220 45 Ib (20.4 kg)
• Mount hubs so line (mains) voltage wiring is at least 6 ft (1.8 m) from sound or electric equipment and wiring.
Front View Side View
Ceiling
Wall
EcoSystem loops
NECR Class 1 or
IEC PELV / NECR
Class 2 only
IEC PELV / NECR Class 2
wiring only for control links
and Ethernet connection
Dedicated feed
Line voltage only
Alternate IEC
PELV / NECR
Class 2 entry
Alternate IEC
PELV / NECR
Class 2 entry
Alternate
EcoSystem
loop wiring
entry
Alternate IEC
PELV / NECR
Class 2 entry
Alternate
EcoSystem
loop wiring
entry
Alternate
EcoSystem
loop wiring
entry
5
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 6 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Hub Overview
Line voltage input,
normal/emergency feed
Receptacle (for Lutron use only)
Hub power switch
IEC PELV / NECR Class 2 power
supply board
Quantum bus supplies
(4 modules, 2 EcoSystem loops per module
maximum)
Factory configured
Quantum bus supply link
Configurable links
(power panel, Lutron QS, DMX512,
or Quantum bus supply)
5-port unmanaged Ethernet switch
Processor LEDs
Quantum processors
(2 maximum)
IEC PELV / NECR Class 2 wire trough
EcoSystem loop wire trough
6
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 7 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Line Voltage Wiring
Ground/Earth
(green)
Neutral
(white)
Line / Hot
(black)
Notes
• Line voltage must enter hub from top right of hub
• Run a dedicated 120 V~ normal/emergency feed
• Lutron recommends that no more than four Light
Management Hubs are powered by a single derated
20 A circuit
• Run wiring so line (mains) Class 1 voltage is separate
from IEC PELV / NECR Class 2 wiring
GND
N
120 V~ N/E
7
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 8 08.16.19
Centralized Control Equipment
Quantum
120 V~ Light Management Hub
Quantum Inter-Processor Wiring
Notes
The inter-processor wiring is considered IEC PELV/NECR
Class 2; do not run in the same conduit as line (mains)
voltage wiring.
• Processors cannot be daisy-chained. Each must be
connected to an Ethernet switch.
- Inter-processor wiring uses a standard Ethernet
connection. All wiring must comply with IEEE 802.3
standards and must support Any-Source Multicast
communication
• Wiring distance for any single “wire segment”* is
330 ft (100 m) max; use unmanaged Ethernet switches
for longer distances.
• Processors cannot be more than 6 “wire segments” from
the server.
• A dedicated network or VLAN is recommended for the
lighting control system.
• For more information about connecting a Quantum
system to a corporate or building wide network, please
refer to the Quantum IT Guide (P/N 040423) at
www.lutron.com/ITGuide
* A wire segment is a length of cable connecting two devices
communicating over Ethernet.
Example of Inter-Processor Wiring:
Riser Diagram
Quantum
Light
Management
Hub
Quantum
Light
Management
Hub
Quantum
Light
Management
Hub
Quantum
Light
Management
Hub
Quantum
Light
Management
Hub
Quantum
server
Unmanaged Ethernet switch
(not provided by Lutron)
Note: Refer to the IT Guide for
managed switch configuration
requirements.
Floor
Floor
Floor
To additional
Quantum
Light
Management
Hubs
Ethernet
switch
8
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 9 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Dedicated Quantum Bus Supply Link
Dedicated Quantum bus supply link; prewired by Lutron
to Quantum Bus Supply located in hub
Note: If Quantum bus supply link is not required, this can be
used as a configurable link. PDU power is not available
from the Quantum hub on this link. An external power
supply is required to power devices on this link.
1
2
3
4
5
6
7
8
EcoSystem
device
IR receiver
IR remote
Quantum
bus supply
(mounted inside
the panel)
Occupant sensor
(32 maximum per
EcoSystem loop)
EcoSystem
device
EcoSystem
device
EcoSystem
device
Daylight sensor
(16 maximum per
EcoSystem loop)
Pico
Wired
Control
To additional Ecosystem
devices (up to 64 total)
Notes
• EcoSystem loops may be wired in accordance with
NECR Class 1 or IEC PELV / NECR Class 2 practices
• Sensors and Quantum bus supply contact closures must
be wired IEC PELV / NECR Class 2
EcoSystem Bus Diagram
QP2-2P8CSE-120 shown
9
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 10 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Quantum Bus Supply OPT Switches and LEDs
E1
E1
E2
E2
E1
E1
E2
E2
H/L H/L N N
1234 5678
ON
678
1234
ON
E1
E1
E2
E2
H/L H/L N N
ERR
EMG
ERR
EMG
BUS
BUS
STAT
V PWR
E1
E1
E2
E2
ERR
EMG
ERR
EMG
BUS
BUS
STAT
V PWR
OPT Switches
OPT switches are used to configure
the Bus Supply. The tables below
describe the options. To place an
OPT switch in the OFF position, slide
the switch to the left; away from the
switch’s number. Default is ON (next
to the switch’s number).
OFF ON
position position
OPT Switch Functions
1 Addressing
Set address for
bus supply’s loops
(2 loops per bus supply)
2
3
4 Green Loop (right side)
Manual override levels
5
6 Blue Loop (left side)
Manual Override levels
7
8 Manual Override
Bus Supply Numbers:
1 2 3 4
1234 5678
ON
1234 5678
ON
12
345678
ON
1234 5678
ON
Bus Supply 3
Addresses 5, 6
1234 5678
ON
12
345678
ON
1234 5678
ON
1234 5678
ON
Bus Supply 2
Addresses 3, 4
12
345678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Bus Supply 1
Addresses 1, 2
1234 5678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Lights stay at
current level
1234 5678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Lights go to
“high” level
Lights go to
“low” level
1234 5678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Lights go
to Off
1234 5678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Lights stay at
current level
1234 5678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Lights go to
“high” level
Lights go to
“low” level
1234 5678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Lights go
to Off
Status LEDs
LEDs on the Quantum Bus
Supply indicate network status.
The specific LEDs, color and
flashing method is detailed
below.
LED Normal Operation Problem Indicator Probable Cause
V~ PWR On Off No Mains power
STAT Steady flash Off No Mains power or unit fault
On Unit fault
BUS Intermittent flash
or Off
On Unit fault
ERR/EMG Off On Emergency contact closure is
active
Steady flash Miswire detected on
corresponding bus
Loop Numbers:
1, 2 3, 4 5, 6 7, 8
1234 5678
ON
1234 5678
ON
1234 5678
ON
12
345678
ON
Bus Supply 4
Addresses 7, 8
1234 5678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Manual override
levels will be used
1234 5678
ON
1234 5678
ON
1234 5678
ON
1234 5678
ON
Lights will go to the level
specified by the system
(Blue) (Green)
10
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 11 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Quantum Bus Supply Wiring
E2
E1
1
2
3
4
5
6
7
8
E2
E1
Processor link
(prewired by Lutron;
not visible in this
view)
Wire Gauge Max. Bus Length
12 AWG (4.0 mm
2
) 2200 ft (670 m)
14 AWG (2.5 mm
2
) 1400 ft (427 m)
16 AWG (1.5 mm
2
) 900 ft (274 m)
18 AWG (1.0 mm
2
) 570 ft (175 m)
Notes
• E1 and E2 wires are not polarity sensitive.
• Line / Hot, neutral, and ground wires are also
connected to each lighting fixture; some may have
an emergency feed.
• Wire-free topology.
• If 15 V- +/- 1 V- is not present between E1 and
E2, check the Quantum bus supply wiring. A short
between E1 and E2 will cause the bus supply to stop
providing voltage on the bus and will cause the ERR
indicator to flash. Removing the short between E1
and E2 will allow the bus supply to operate properly.
DL7
DL8
EM C
Line voltage in
(prewired by Lutron)
E2
E2
EcoSystem devices
E1
E1
To wire the Quantum bus supply for IECPELV / NECR
Class 2, the Quantum bus supply wires must be
separated from the mains wiring. Otherwise, the
IEC PELV wiring must be classified as NECR Class 1.
Use of Lutron EcoSystem bus cable is recommended.
See Lutron spec sheet for the available options:
http://www.lutron.com/TechnicalDocumentLibrary/
ecosystem_cable.pdf
Emergency input
(normally closed)
To additional
EcoSystem devices
11
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 12 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Configurable Link Wiring: Power Panel Link
5 4 3 2 1
DRAIN
_
MUX
V+
COM
Link
terminator
(LT-1)
Control
wiring
(1) 12 AWG
(4.0 mm
2
)
1: Common
Data link
(1) shielded, twisted pair
22 AWG (0.5 mm
2
)
3: MUX
4: _
D: Drain wire in shield (keep
away from ground and all
electronics)
Power panel
1 COM
2 N/C
3 MUX
4 MUX
D DRAIN
5 Sense line
Power panel
1 COM
2 N/C
3 MUX
4 MUX
D DRAIN
5 Sense line
Power panel
1 COM
2 N/C
3 MUX
4 MUX
D DRAIN
5 Sense line
4 3 3 4
Link
terminator
(LT-1)
Emergency/essential
sense line
(1) 18 AWG (1.0 mm²)
5: Sense line
Sense line is used
when there is a panel
being supplied by an
emergency/essential feed
Data A OK
Data B OK
Power OK
12345D
C
D
A B
Common
24VFW
MUX
MUX
Drain
Sense
Comm
Drain
MUX
MUX
C
1
234
D
5
D
Link Link
S
ELECT
C
IRCUIT
Data link: twisted,
shielded pair
22 AWG (0.5 mm
2
)
3: MUX
4: _
Drain
(2) 12 AWG
(4.0 mm
2
)
Configurable
links
Quantum Bus
Supply link
Notes
Power panel link must be daisy-chained (no T-taps).
Maximum of 32 circuit selectors per link (note that some
GP series panels can contain more than one circuit
selector per panel).
It is not necessary to have the Quantum connection at the
end of the link. The panel can be in the middle of the
link also.
The sense wire (terminal 5) is used whenever there is a
panel being supplied by an emergency/essential feed; see
power panel instructions for details. The sense wire will
not be terminated at the Quantum hub.
Each low-voltage IEC PELV / NECR Class 2 terminal can
accept only two 22-18 AWG (0.5-1.0 mm
2
) wires. Two
12 AWG (4.0 mm
2
) conductors will not fit. Connect as
shown using appropriate wire connectors.
IEC PELV / NECR Class 2
Terminal Wiring
Total length of the power panel link may be no more
than 2000 ft (600 m). Lutron model: MX-RPTR can
be used to extend the link beyond 2000 ft (600 m).
Contact Lutron for more information.
GRX-CBL-46L IEC PELV / NECR Class 2 wiring cable
is available from Lutron and contains two
12 AWG (4.0 mm
2
) conductors for control power,
one twisted, shielded pair of 22 AWG (0.5mm
2
) for
data link, and one 18 AWG (1.0 mm
2
) conductor for
emergency (essential) sense line. See Lutron cable
specifications for all plenum and non-plenum options
available.
http://www.lutron.com/TechnicalDocumentLibrary/
cables_nonplenum.pdf
http://www.lutron.com/TechnicalDocumentLibrary/
cables_plenum.pdf
Sense: 18 AWG (1.0 mm²)
12
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 13 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Configurable Link Wiring: QS Link
(5) Drain (Shield)
(4) _
(3) MUX
(2) 24 V-
(1) COM
QS Link Wiring:
22AWG to 12AWG
(0.5mm( to 4.0mm()
Notes
• System communication uses IEC PELV / NECR
Class2 low-voltage wiring.
• Follow all local and national electrical codes when
installing IEC PELV / NECR Class 2 wiring with line
voltage/mains wiring.
Each terminal accepts up to two 18 AWG (1.0 mm()
wires or one 12 AWG to 22 AWG (4.0 mm( to 0.5 mm()
wire.
• Total length of QS link must not exceed 2000 ft
(600 m). Contact Lutron Customer Support for
applications needing to extend QS link wiring.
A Quantum QS link can have up to 512 switch legs
(outputs) and 99 QS devices.
The Quantum
Light Management Hub provides
33power draw units (PDUs) on the QS Link. For
more information, see “Power Draw Units on the QS
Link” (Lutron P/N 369405).
http://www.lutron.com/
TechnicalDocumentLibrary/369405%20pdu%20
spec%20submittal.pdf
• QS Link Wiring can be T-tapped or daisy-chained.
• Wire sizes:
Two 12 AWG (4.0 mm
2
) conductors for control
power.
One twisted, shielded pair of 22 AWG (0.5 mm
2
)
for data link.
– Cable is available from Lutron: GRX-CBL-46L.
Available Power Draw
Units (PDUs) per link
Maximum Link
Length
Wire Gauge
Available from Lutron
in one cable
33
500 ft
(152.4 m)
Power (terminals 1 and 2) 1 pair 18 AWG (1.0 mm
2
)
Data (terminals 3 and 4)1 pair 22 AWG (0.5 mm
2
)
twisted and shielded
GRX-CBL-346S
GRX-PCBL-346S
33
2000 ft
(609.6 m)
Power (terminals 1 and 2) 1 pair 12 AWG (4.0 mm
2
)
Data (terminals 3 and 4) 1 pair 22 AWG (0.5 mm
2
)
twisted and shielded
GRX-CBL-46L
GRX-PCBL-46L
13
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 14 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
QP3-1PL-100-240
Type 1
Enclosure
Input:
1 A 120-240 V~ 50/60 Hz
Output:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entree:
1 A 120-240 V~ 50/60 Hz
Sortie:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entrada:
1 A 120-240 V~ 50/60 Hz
Salida:
2 A 24 V --- (IEC PELV/NECR Class 2)
QP3-1PL-100-240
Type 1
Enclosure
Input:
1 A 120-240 V~ 50/60 Hz
Output:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entree:
1 A 120-240 V~ 50/60 Hz
Sortie:
2 A 24 V --- (IEC PELV/NECR Class 2)
Entrada:
1 A 120-240 V~ 50/60 Hz
Salida:
2 A 24 V --- (IEC PELV/NECR Class 2)
+
Only terminals 1, 3, and 4 connected
between devices that supply PDUs
Terminal 2 NEVER
connected between devices
that supply PDUs
Devices that
supply PDUs
Devices that
consume PDUs
COM
+24 V
MUX
MUX
COM
MUX
MUX
Quantum
Light
Management
Hub (QP3)
Quantum
Light
Management
Hub (QP3)
QS Device
Interface
QS Device
Interface
QSM
QSMQSM
Wired QS
Keypad
Wired QS
Keypad
Wired QS
Keypad
Wired QS
Keypad
Step-PS
QS Link
power
supply
QS link;
no terminal 2
QS link; all 4 terminals
QS link; all 4 terminals
QS link;
all 4
terminals
Terminal 2 (+24 V)
NEVER connected*
**
All 4 terminals connected to QS link
devices that consume PDUs
QS Link Wiring Rules
* Terminal 2 (+24 V) should NEVER be connected between devices that supply PDUs.
** For QS Link power supply wiring connection details, refer to the installation instructions for the
specific power supply model being used.
Interprocessor
wiring
Unmanaged Ethernet
switch (not provided by
Lutron)
Configurable Link Wiring: QS Link (continued)
14
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 15 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Configurable Link Wiring: DMX512
DMX512 Output Wiring Example
5 4 3 2 1
DRAIN
MUX
MUX
V+
COM
Link
terminator
(LT-1)
DMX512
Controllable
Device
COMMON
DATA +
DATA -
DMX512
Controllable
Device
COMMON
DATA +
DATA -
DMX512
Controllable
Device
COMMON
DATA +
DATA -
4 3 3 4
Link
terminator
(LT-1)
(3) Configurable Links
15
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 16 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Link
terminator
(LT-1)
Link
terminator
(LT-1)
DMX512 Lighting Control Console
(not provided by Lutron)
Lutron DMX512 Input
Jack model:
NT-DMXJ-IN
DMX512 Cable
(see table on next page)
DMX Patch Cable
(not provided by Lutron)
DMX512 Input Wiring Example
5 4 3 2 1
DRAIN
MUX
MUX
V+
COM
4 3
43
(3) Configurable Links
16
Job Name:
Job Number:
Model Numbers:
Page
SPECIFICATION SUBMITTAL
369375h 17 08.16.19
Centralized Control Equipment
120 V~ Light Management Hub
Quantum
Notes
• Installation and all devices must comply with the
ANSI E1.11-2008, USITT DMX512-A standard.
• Below are a few Important points from the standard:
All DMX512 devices in a DMX512 universe must be
wired in a daisy-chain configuration.
Total length of the link wiring for one DMX512
universe must not exceed 1300 ft (400 m). DMX
repeaters or splitters can be used to extend the
link. All repeaters must comply with the standard.
The repeater manufacturer’s guidelines must be
followed.
All cable used must comply with the standard.
Lutron models GRX-CBL-DMX-250 and GRX-
CLB-DMX-500 comply with the standard and are
recommended.
DMX512 link terminators must be installed at both
ends of the DMX512 link. Lutron model LT-1A link
terminators are included with the panel and are
recommended. Note that some DMX512 devices
have built-in link terminators.
A maximum of (31) DMX512 devices can be
directly connected to the DMX512 controller. If
(32) or more devices are required, DMX512
repeaters or splitters must be used to extend the
number of devices. A repeater or splitter is needed
so that no more than (32) devices are directly
connected on the same wire segment. Note that
link terminators are required at the beginning and
end of every wire segment.
• The Quantum processor can be programmed to
either control DMX512 devices (DMX512 output) or
to receive DMX512 signals from a DMX512 controller
(DMX512 input) such as a theatrical stage board.
All wiring must be low-voltage IEC PELV/NECR Class
2 wiring. Each terminals of the Lutron processor can
accept only stranded wire, and either (1 or 2)
22–18 AWG (0.5 mm² – 1.0 mm²) conductors or
(1) 16–12 AWG (1.5 mm² – 2.5 mm²).
• The Quantum processor can be at the end or in the
middle of the DMX512 link. The link terminators must
always be installed at the ends of the link.
• Only one link of the processor can be configured as
a DMX512 link. The other link of the processor must
be configured as a QS link.
• DMX512 devices must be addressed prior to
commissioning of the system. A schedule of
the DMX devices and their addresses must be
supplied to the Lutron project manager prior to
commissioning. Lutron is not responsible for the
addressing of the DMX512 devices.
• Refer to the Lutron DMX512 Application Note #592
(P/N 048592) at www.lutron.com for information on
the different DMX512 applications that Lutron can
provide.
Configurable Link Wiring: DMX512 (continued)
DMX Cable Wiring Table
This table shows examples of some Manufacturers of DMX512
cable and how they should be terminated.
DMX512 Cable Type Wire
From
Circuit
Selector
To DMX512 Jack
Belden 9729/89729
(2) drain/shield C C (1) (white/black)
black + – (2) (red)
white + (3) (yellow)
black No Connect – (4) (blue)
red No Connect + (5) (black)
Duraflex 22/4WS
or Lutron
GRX-CBL-DMX-250/500
(2) drain/shield C C (1) (white/black)
white + – (2) (red)
black + (3) (yellow)
green No Connect – (4) (blue)
red No Connect + (5) (black)
)Lutron, Lutron, EcoSystem, Energi Savr Node, GRAFIK Eye, Hi-Lume, Leaf
Design, Pico, Sivoia, and Quantum are trademarks or registered trademarks of
Lutron Electronics Co., Inc. in the US and/or other countries.
NEC is a registered trademark of National Fire Protection Association, Quincy,
Massachusetts.
UL is a trademark of UL LLC.
17