BUILDING SERVICES
309 W. SUL ROSS
ALPINE, TX 79830
432-837-3281
FOR STAFF USE ONLY
DATE: __________________
PERMIT#:_______________
TOTAL FEE$_____________
SIGN PERMIT APPLICATION
JOB ADDRESS:
LOT/BLOCK/SUBDIVISION:
NAME:
PHONE:
NAME OF BUSINESS:
PHONE NUMBER:
EMAIL:
SIGN CONTRACTOR (COMPANY NAME):
CURRENT MAILING ADDRESS:
CITY / STATE / ZIP:
TYPE OF SIGN : FREE STANDING / WALL MOUNTED / BANNER
GRAND OPENING
ILLUMINATED? YES NO REFACE? YES NO ELEVATION:
DESCRIPTION OF SIGN:
WALL DIMENSIONS:
SIGN DIMENSIONS:
VALUATION OF SIGN:
IN ACCORDANCE TO STATE LAW AND CITY ORDINANCE ILLUMINATED SIGNS MUST BE CONSTRUCTED, INSTALLED AND WIRED
BY A STATE LICENSED ELECTRICAL CONTRACTOR OR STATE LICENSED MASTER ELECTRICIAN. SIGNS MAY ALSO BE
CONSTRUCTED BY A FABRICATOR APPROVED BY A NATIONALLY RECOGNIZED TESTING AGENCY AND LABELED ACCORDINGLY
**
REQUIRED ATTACHMENTS:
1.
A
separate permit and 2 sets of drawings are required for each sign. For wall signs a separate permit
Application and plans may be submitted for each elevation. A minimum of 8 ½ x 11 drawings must be
Submitted. All drawings must be legible.
2.
P
ole or ground signs require a site plan drawn to scale showing location of the sign. Pole sign structural
Drawings must be sealed by a State of Texas Registered Professional Engineer. Monument and Ground
Sign applications must include footing detail.
3.
S
how dimensions and distances to property lines (please asterisk on property with line to sign location)
4. Detailed, dimensioned plans of sign showing graphics. Dimensioned full-length building elevation
Showing sign(s) on building. Show height and width of tenant space and or building.
If any other signs are on property, give the number and the types.
5. Plan Review fee, 45 % of permit fee is required when permit application is submitted. Balance due upon
Approval
.
I HEREBY CERTIFY THAT THE FORGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND THAT THE SAID
WORK WILL BE DONE IN CONFORMANCE WITH THE INFORMATION HEREIN SET FORTH AND IN COMPLIANCE WITH
THE CITY OF ALPINE CODES REGULATING SIGN REQUIREMENTS
Date:
Through
Date:
click to sign
signature
click to edit