TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
Rev-12.3.19-NEW-WATER PERMIT INST-Non-Res.docx
TOWN OF HUDSON WATER UTILITY
WATER SERVICE APPLICATION
(NON-RESIDENTIAL)
Below are step by step procedures for attaining service. Should you have any questions
concerning what is required, please call the Engineering Division at 886-6008.
The Town has contracted with WhiteWater to assist with the installation of meters and
inspections. Once an application and the permit fee have been submitted to the Town,
the application will be sent to WhiteWater for review. The meter fee is based on the
meter size and is defined on Exhibit A (page 3) of the permit.
There is also a one-time Water Access Fee that is required for all new connections to the
town water main. The Access Fee is set annually, as per the “New Customer Water
Access Fee” schedule attached, and must be paid prior to service turn-on and/or issuance
of a Certificate of Occupancy.
STEP BY STEP PROCEDURES FOR OBTAINING SERVICE
NOTE: A Drainlayer’s License is required for all work on water mains, service lines
and related work in public or private right-of-ways connecting to the Town of Hudson
Water Utility.
1. Please complete both the Water Connection Permit Application and Water
Demand Form. The linear footage of pipe to be installed will also have to be
determined/estimated and filled out on Exhibit A (page 3) of the application.
2. A plan must be submitted showing the existing water main, edge of pavement,
building foundation, location of the proposed service and all applicable
dimensions including building ties to the curb stop.
3. Submit the application, Water Demand Form, and plan with the $100.00
application fee made payable to: Town of Hudson, 12 School Street.
Note: The inspection fee and meter fee will be paid at time of permit
issuance, and the Water Access fee must be paid prior to service turn-on
and/or issuance of a Certificate of Occupancy. All fees are required to be paid
in full prior to service.
4. The Town and WhiteWater will then review the application. The meter size
will be determined by WhiteWater at this time. You will be contacted when
the review process is completed and approved. You may then pick up your
permit and pay the balance of the application fee, which will be based on the
TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
Rev-12.3.19-NEW-WATER PERMIT INST-Non-Res.docx
meter size, the LF of installed pipe, and any other additional features (ie:
hydrants, etc.).
5. It is the applicant’s responsibility to hire a contractor to do the installation of
the water service line in accordance with Town service specifications, and pay
for all water line installation costs. Copies of the appropriate service details
can be found online by viewing the Water Service Specifications link, or
obtained in the Engineering Department of Town Hall.
A street opening permit may be required. Please contact the Hudson Highway
Department for application and processing at 603-886-6018.
The water service must be inspected by one of the Town’s technicians or
agents prior to backfill. Inspections can be scheduled by calling the
Engineering Department at 603-886-6008. It is your responsibility to fence
any trenches that must be left open until inspection.
6. Your final step to receiving water service involves the installation of the water
meter, remote reader, and turning on the water service. Please contact
WhiteWater at 603-324-8318 to have your meter installed. Note that it is the
responsibility of the contractor to provide meter fittings for 5/8”, ¾” and 1”
meters in addition to the wire installation, as per the specifications shown on
Sheet 1. A list of suppliers for the meter fittings and wire is shown on
Appendix X. Fittings and wire for 1.5” and 2” meters will still be provided by
Town of Hudson through WhiteWater. A remote wire will be installed from
the inside meter location to the outside of your building before the 1.5” and 2”
meter can be set. If any part of this wire needs to be installed behind sheet
rock or in an area that will not be accessible to WhiteWater at the time the
meter is set, it will be required by your contractor to install the wire from the
meter location to the outside, as shown on Sheet 1. A 48-hour notice is
required (business hours) is required.
The Water Department may require a Compound Meter on services that are 2”
or larger, that can accurately read both high and low flow rates.
Your meter can not be set until your plumber has installed the internal
plumbing to your building in accordance with the service details.
Once the meter is set, then a service turn-on can be scheduled through
WhiteWater at 603-324-8318. The meter can be set and the water turned on
during the same appointment. Again, please be advised that the Water Access
fee must be paid prior to service turn-on and/or issuance of a Certificate of
Occupancy.
TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
Rev-12.3.19-NEW-WATER PERMIT INST-Non-Res.docx
High & Low Pressure Conditions
The applicant should be aware that the Town of Hudson has adopted the IRC
(International Residential Code). This code addresses high and low pressure conditions
for water supply. The applicant must address this issue with their plumber.
PRV Requirements
If a Pressure Reducing Valve (PRV) is required, the plumber will be required to perform
the installation based on WhiteWater’s recommendation. It is the responsibility of the
property owner to install a suitable expansion tank and a pressure release valve on water
heaters on the premises to prevent damage resulting from lack of pressure relief through
the water line. WhiteWater may also require the property owner to install increased
levels of backflow prevention protection.
Cross Connection
It is illegal to have a connection between the distribution system and any pipes, pumps,
hydrants, fire protection, sprinkler system or tanks whereby non-potable water or other
contaminating materials may be discharged or drawn into the water distribution system.
Separation of Water and Sewer
Water mains shall be installed at least 10-feet horizontally from any existing or proposed
sanitary sewer. In cases where it is not practical to maintain a 10-foot separation, a
deviation may be allowed on a case-by-case basis. No water pipe shall pass through or
come in contact with any part of a sanitary sewer manhole. The water service or main
must be at least 18 inches above the sewer main or service when crossed.
1. ALL MATERIALS AND INSTALLATION PROCEDURES WILL CONFORM TO HUDSON
SPECIFICATIONS.
2. INSTALLATION UNDER FOOTING OR THROUGH FOUNDATION WALL AT OWNER'S OPTION.
3. OWNER MUST PROVIDE A CLEAN, DRY ACCESSIBLE AND WARM (CONTINUALLY ABOVE 45F)
LOCATION FOR THE WATER METER.
4. OUTSIDE READER MUST BE LOCATED ADJACENT TO DRIVEWAY.
5. SERVICE LINE FROM STREET TO METER AND SIZE TO BE PROVIDED BY HUDSON.
6. PROVIDE A MINIMUM OF J6, OF STRAIGHT COPPER RUBBING AT SERVICE ENTRANCE INSIDE
OF BUILDING TO ALLOW FOR INSTALLATION OF HUDSON METER.
7. PIPE DOPE AND/OR TEFLON THREAD TAPE TO BE USED ON ALL FIP OR MIP FITTINGS.
NOT TO BE USED ON COMPRESSION FITTING THREADS
NOTES:
Appendix X
Meter Fittings and Connection Wire Suppliers list:
For Meter Fittings:
E J Prescott Inc
Address: 210 Sheep Davis Rd, Concord, NH 03301
Phone: (603) 224-9545
Ferguson Waterworks
Address: 1 Chester Rd, Raymond, NH 03077
Phone: (603) 895-2282
Concord Winwater Works Co
Address: 12 Sandquist St, Concord, NH 03301
Phone: (603) 223-6910
Water Works Supply Corporation
Address: 71 Rockingham Rd, Londonderry, NH 03053
Phone: (603) 432-6393
For Connection Wire:
Ti-SALES
Address: 36 Hudson Rd, Sudbury, MA 01776
Phone: (800) 225-4616
TYPICAL METER FITTINGS REQUIRED
METER
DESCRIPTION
QUANTITY
PART
5/8" 1
3/4 IN. COPPER KORNERHORN BALL VALVE
1
3/4 IN. COPPER # 2 KORNERHORN 3/4" X 5/8"
1
3/4" CHECK VALVE
1
3/4" PACK JOINT ASSEMBLY PJ A4-13
1
1 IN. PACK JOINT ASSEMBLY PJ A4-14
METER
DESCRIPTION
QUANTITY
PART
3/4" 1
1 IN. CURB STOP (CELLAR VALVE) 1" CTPJ X 1" FIP
1
1 IN. COPPERHORN
1
1 IN. CHECK VALVE
1
1 IN. MALE ADAPTERS 1" MIP X 1" CTPJ
2
BRASS METER ADAPTER 3/4" TO 1"
METER
DESCRIPTION
QUANTITY
PART
1" 1
1 IN. CURB STOP (CELLAR VALVE) 1" CTPJ X 1" FIP
1
1 IN. COPPERHORN
1
1 IN. CHECK VALVE
1
1 IN. MALE ADAPTERS 1" MIP X 1" CTPJ
TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
1
WATER CONNECTION PERMIT APPLICATION
(NON-RESIDENTIAL)
PLEASE NOTE THE FOLLOWING CHANGES EFFECTIVE IMMEDIATELY:
It will be the responsibility of the costumer to provide meter fittings for 5/8”, ¾” and 1”
meters, see Sheet 1 for additional information. Fittings for 1.5” and 2” meters will still be
provided by Town of Hudson through WhiteWater. The costumer shall also be
responsible for installing the wire as shown on the attachments.
1. APPLICANT INFORMATION: Owner Contractor
NAME: _______________________________________________________
ADDRESS: _____________________________________________________
TELEPHONE: ________________________ EMAIL: _______________
BUILDING LOCATION: _________________________________________________
TAX MAP: ________________________ LOT: ______________________
DRAINLAYER’S LICENSE #: CONTRACTOR:
A Drainlayer’s License is required for all water mains, service lines and related work
in public or private right-of-ways connecting to the Town of Hudson Water Utility.
OWNER (If different from above):
OWNER PHONE #:
By applying for this connection, I agree to abide by all applicable Town, State and
Federal requirements.
SIGNATURE: __________________________________________________________
For office use:
2a. APPLICATION PROCESSING FEE: Amount: $100.00
Date: ___________ Receipt #: Received by:_______
2b. PERMIT FEE: (Meter/Inspections – per Exhibit A) Amount:
Date: ___________ Receipt #: Received by:______
2c. ACCESS FEE: Amount:
Date: ___________ Receipt #: Received by:________
SERVICE TYPE: NEW RENEWED METER ONLY
click to sign
signature
click to edit
TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
2
4. DEPARTMENT OF PUBLIC WORKS/ HIGHWAY REVIEW
Street opening permit required: YES NO
SPECIAL CONDITIONS: _______________________________________________
5. TOWN ENGINEER REVIEW (if applicable)
SPECIAL CONDITIONS: _______________________________________________
_____________________________________________________________________
6. OTHER REQUIREMENTS
BACK FLOW PREVENTER REQUIRED: Yes No
PRESSURE REDUCING VALVE REQUIRED: Yes No
PRV Requirements:
If a Pressure Reducing Valve (PRV) is required, the plumber will be required to perform
the installation based on WhiteWater’s recommendation. It is the responsibility of the
property owner to install a suitable expansion tank and a pressure release valve on water
heaters on the premises to prevent damage resulting from lack of pressure relief through
the water line. WhiteWater may also require the property owner to install increased
levels of backflow prevention protection.
Meter Fitting Requirements:
It will be the responsibility of the costumer to provide meter fittings for 5/8”, ¾” and 1”
meters, see Sheet 1 for additional information. Fittings for 1.5” and 2” meters will still be
provided by Town of Hudson through WhiteWater. The costumer shall also be
responsible for installing the wire as shown on Sheet 1.
Building Location: ______________________________ ____
Tax Map: ________________ Lot: __________________
TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
3
EXHIBIT ‘A’
1. Application Processing Fee: $100.00
2. Meter installation:
(without fittings) 5/8” size @ $250.00
¾” size @ $350.00
1” size @ $400.00
Meter installation: 1 ½” size @ $800.00
(with fittings) 2” size @ $1,050.00
3” size @ $1,050.00
(plus parts)
>3” *Cost to be determined at time of application.
The Water Department may require a Compound Water Meter on water services
that are 2” and larger that can accurately read both high and low flow rates.
Meter Size: $
4. Hydrant: Cost per hydrant # of hydrants
$85.00 x
=
$___________
5. Fire Service:
Inspection Fee @ $4.00 per L.F. of installed pipe:
____________L.F. x $4.00 = $___________
Total: $___________
6. New customer Water System Access Fee: $
* Set annually - per attached chart.
* Must be paid prior to service turn-on.
TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
4
WATER DEMAND FORM
PLUMBING FIXTURES PIPE SIZE
CONNECTION
QUANTITY
Bathtub
Bedpan Washers
Combination Sink & Tray
Dental Unit
Dental Lavatory
Drinking Foundation
Kitchen Sink – ½” Connection
¾” Connection
Lavatory – 3/8” Connection
¾” Connection
Lavatory Tray – ½” Connection
¾” Connection
Shower Head (Shower On)
Service Sink – ½” Connection
¾” Connection
Urinal – Pedestal Flush Valve
Wall Flush Valve
Trough (2 Ft. Unit)
Wash Sink (Each Set of Faucets)
Water Closet – Flush Valve
Tank Type
Dishwasher – ½” Connection
¾” Connection
Washing Machine – ½” Connection
¾” Connection
1” Connection
Hose Connection (Wash Down)
Hose (50 Ft. Wash Down” ½”
¾”
5/8”
Irrigation: No. of Heads:
Area – Sq.Ft.:
TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
5
FIRE SERVICE
* You must complete this section if your facility will have a Fire Service/sprinkler
system.
SUBDIVISION NAME: _______________________________________________
LOCATION: _______________________________________________
BUILDING # _______________________________________________
SERVICE NO. _______________________________________________
DATE: _______________________________________________
FIRE SERVICE SIZE: _______________________________________________
TOWN OF HUDSON – Engineering Department
12 School Street · Hudson, New Hampshire 03051 · Tel: 603-886-6000 · Fax: 603-816-1291
6
Water Service Sketch
Street Address:
Map: Lot:
R.O.W.
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ __
___ Edge of ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
Pavement
R.O.W.
Sketch shall show the approximate location of the existing water main, and the location
and distance of the proposed water and sewer service.
Building Foundation