8/12 - 6 - IPP Permit Application
PLEASE ATTACH ANY ADDITIONAL INFORMATION WHICH MAY CLARIFY
THE PROCESS OR PRETREATMENT SYSTEM (MANUFACTURER’S PRODUCT
LITERATURE, CHEMICAL MSDS SHEETS, TOXICITY DATA, TREATABILITY
PLEASE ATTACH COPIES OF WASTER USAGE DATA (Meter Log Sheet or Water
Bills) FOR THE PAST YEAR (If available).
PLEASE ATTACH A DETAILED MAP OF THE SITE (AND BUILDING) SHOWING
THE PIPE SIZES AND APP
ROXIMATE LOCATION OF ALL SEWER
CONNECTIONS, DRAINS, OR OUTFALLS LEAVING THE BUILDING AND ALL
SAMPLING LOCATIONS. (If any process wastewater is discharged or proposed to be
discharged, this map should include location of water meters, flow meters, general layout
of internal plumbing, sampling stations or control manholes, monitoring equipment and
pretreatment facilities.) Include plan scale, north arrow, street names, river, pond, and
well locations and an outline of on-lot storage-disposal systems (septic
tank and
leachfield), municipal sewer, chemical storage areas, bulk chemical storage areas and
containment devices, flow arrows, and any other pertinent data.
PLEASE PROVIDE THE FOLLOWING DISCHARGE FLOW METER DATA:
Manufacturer Model
Manufacturer Model
PLEASE ATTACH A GENERAL SITE LOCATION MAP (LOCUS).
PLEASE DESCRIBE ANY MEASURES TAKEN OR PLANNED TO REDUCE WATER USAGE
AND IMPLEMENT POLLUTION PREVENTION TECHNIQUES, IF ANY, SUCH AS; FLOW
RESTRICTERS, COUNTERCURRENT RINSES, RECYCLING OF NON-CONTACT COOLING
WATER, CHEMICAL SUBSTITUTIONS, AND POLLUTANT SOURCE REDUCTION.
IS A SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN PREPARED FOR
THE FACILITY? (PETROLEUM RELATED)
IF YES, LIST DATE LAST REVISED:
IS A GENERAL CHEMICAL SPILL PLAN PREPARED FOR THE FACILITY?
IF YES, LIST DATE LAST REVISED: