City of Phoenix Planning & Development Department
Hillside, Revegetation Plan Checklist – Page 3 of 4
TRT/DOC/00204
PLANTING SHEET REQUIREMENTS
DES RVW
Provide a planting plan that shows the locations of plants in the Revegetation areas.
Provide a plant materials list that includes the following:
Symbol
Plant name (botanical and common)
Caliper size
Size (mature height and width (H x W) and box size or gallon size)
Quantity
Show all existing trees, cacti, and shrubs on the plan. If a Hillside, Inventory/Salvage Plan was completed,
identify all salvaged landscape materials and remain in place materials on the Revegetation Plan. Please use
the corresponding tag numbers from the Hillside, Inventory/Salvage Plan. Salvaged plant material is to be
utilized on the site. Show the salvaged plants in their new/proposed locations. If there are no existing plant
materials on site, please note on the plans, "There are no existing plant materials on the site." Provide
pictures if necessary with the plan submittal.
Plant species used in Revegetation areas must be from the Sonoran Desert Plant List, available online at
http://phoenix.gov/development/siteandcivil/landscape/index.html
Use of turf and plants that are not on the Sonoran Desert Plant List are limited to permanently disturbed
areas.
Fifty percent (50%) live coverage at maturity in all Revegetation areas. Includes trees, shrubs, and ground
cover.
Applied dust control products (i.e. decomposed granite) are to be installed a minimum of two inches (2") thick
in all landscape areas. Decomposed granite size should be ¼" to ¾" per Zoning Ordinance section 202 and
city of Phoenix Supplement to MAG Standards section 430. Decomposed Granite materials should be of
matching size and color to the existing surrounding areas.
Boulders are not allowed in the public Right-Of-Way (Streets Department).
Comply with applicable stipulations.
Provide a tree and shrub planting detail per city of Phoenix Supplement to MAG Standards 430.10.1.
SURFACE IRRIGATION PLAN SHEET REQUIREMENTS
DES RVW
Provide a materials list which includes the following:
symbol
equipment type
equipment size
Show the water source or tap location on plan. Obtain the station points from the engineer and place on the
plans for new construction or dimension existing meters or mainline point of connection.
Provide the controller location, type, number of stations, etc.
Provide the location(s) of valve(s), type, and size.
Provide the location(s) of the backflow preventer(s), type, size, etc.
Show main, laterals (PVC), and pipe size.
Provide a sleeve pipe (schedule 40) under driveways and walks, and call out the size.