1OF16UPDATED1/3/2018
VillageofBrooklyn
ErosionControlandStormwaterManagement
PermitApplication
210CommercialStreet,P.O.Box189
Brooklyn,WI53521
6084554201/fax4551385
clerk@brooklynwi.gov&deputyclerk@brooklynwi.gov
Nolandownerorlandusermaycommencealanddisturbanceorlanddevelopmentactivity
subjecttothisordinancewithoutreceivingpriorapprovalofanerosioncontrolandstormwater
managementplanforthesiteandapermitfromtheVillageEngineer.Applicantshallsubmitthis
applicationalongwithacontrolplan
andpayanapplicationfeetothevillage.Within21daysof
receiptoftheapplication,controlplanstatement,andfeetheVillageEngineerwillreviewto
determineifallrequirementsoftheordinancearemet.(Ordinance107)
ALLNECESSARYINFORMATIONMUSTBEPROVIDEDONTHISFORM(Ordinance10736)
OwnerInformation
Name
ContactPerson
Workphone
HomeorCellPhone
Address
City,State,Zip
Email Fax
ContractorInformation
Name
ContactPerson
Workphone
Title
Address
City,State,Zip
Email Fax
ConstructionSiteInformation
SiteName:
LocationAddress:
MailingAddress:
ProjectStartDate: ProjectEndDate:
2OF16UPDATED1/3/2018
IfthesiteisnotwhollylocatedwithintheVillageofBrooklynorifthesiteisnotlocatedonaVillage
Street,completethefollowing:
QuarterQuarter_Quarter_____ Section_____Township______N.Range_______
Isthissitewhollycontainedontheabovequartersection?(YesorNo)______
*Usemore
spaceifneededtodescribesitelocation
TotalAreaofConstructionSite:_______AcresTotalEstimatedDisturbedArea:________Acres
SiteImperviousArea:(includingrooftops)BeforeConstruction:_________%
AfterConstruction:__________%
TypeofConstruction(checkallthatapply):
__Residential__Commercial__Industrial__Reconstruction__Demolition
__Utility
__Transportation(ifapplicable,listWDOTProjectNumber)
__Other(Describe)
__Stormdrainsysteminfiltratestogroundwater
__Stormdrainsystemdischargetosurfacewater
__Directlyorindirectlytowatersofthestateenternameofstream,river,lakewetland
__Infiltrationtogroundwater
occursonsite
Hasthestormwaterdischargeleavingthesitebeensampledandanalyzedforpollutants?(YesorNo)
Certification
“Icertifythatthisdocumentandattachmentswerepreparedundermydirectionorsupervisionin
accordancewithasystemdesignedtoassurethatqualifiedpersonnelproperlygatherandevaluate
theinformationsubmitted.Basedonmyinquiryoftheperson,orpersons,directlyresponsiblefor
gatheringtheinformation,theinformationsubmitted
is,tothebestofmyknowledgeandbelief,true,
accurate,andcomplete.Inaddition,Icertifythattheprovisionsofthepermit,includingdevelopment
andimplementationoftheConstructionSiteErosionControlandStormwaterManagementPlan,will
becompliedwith.IamawareoftheenforcementprovisioninOrdinance107
26ofthevillage
ordinance,andwherenoticeofnoncompliancehasbeengivenandinnotcorrectedwithinthetime
periodsspecifiedinOrdinance10726.Iauthorizethevillagetotakecorrectiveaction,asdescribedin
andconsenttoassessmentsbythevillageagainstmypropertyforthetotal
costsandexpensesofthis
action.”
OwnerPrintedName
Telephone#
OwnerSignature
DateSigned

3OF16UPDATED1/3/2018
Pleasecompleteifthispermitapplicationwaspreparedbyaconsultantorsomeoneotherthanand
employeeofthesiteOwner.
PreparePrintedName
Firm
MailingAddress
Title
City,State,ZipCode
Telephone#
SignatureofPrepare DateSigned
4OF16UPDATED1/3/2018
VillageofBrooklyn
ErosionControlApplicationChecklist
Ordinance107.28
Date:___________
Project_________________________________________Permit#_____________________
Pleasechecktheappropriatebox:I=Included;NA=NonApplicable(if“NA”ischecked,and
explanationmustbeentered)
Applicant Reviewer
PlanRequirement I NA Explanation/LocationinPlan I NA
Crosssectionsandprofilesofroadditches
Culvertsizes
Directionofrunoffflow(contoursorrunoff
arrows)

Watershedsizeforeachcontributing
drainagearea

Designdischargeforditchesandstructural
measures(flowcalculations)

Runoffvelocitiesinchannels(feet/second,
meters/second)

Fertilizerandseedingrates(seed,fertilizer,
andmulch)

Timescheduleforstabilizingexposedsoil
Preventgullyandbankerosionandapply
minimumstandardsforsheetandrill
erosion:7.5ton/acre/yr(soilloss
calculation)

Descriptionofhowthesiteistobe
developed(writtendescription)

Provisionsforsequentialstepsmitigating
theerosiveeffectoflanddisturbing
activities(listoferosioncontroldevices)

Provisionstopreventmudtrackingoffsite
ontopublicthoroughfaresduring
construction(stonetrackingpad)

Anyotherinformationnecessaryto
reasonablydeterminethelocation,nature,
andconditionofanyphysicalor
environmentalfeaturesofthesite

5OF16UPDATED1/3/2018
Anyproposedchangestotheerosion
controlplanmustbesubmittedand
approved

ApplicationRequirement
I
NA
Explanation/LocationinPlan
I
NA
CopyofPreliminaryReviewLetter,if
applicable

Copiesofpermitsorapprovalsbyother
agencies

Proposedscheduleforcompletionand
installationofallelementsoftheerosion
controlplan

Estimatedcostofcompletionand
installationofallelementsoftheerosion
controlplan.

Ifstormwatermanagementrequirementsareapplicable,thestormwaterchecklistmustbeattached.
6OF16UPDATED1/3/2018
VillageofBrooklyn
Stormwate r ManagementApplicationChecklist
Ordinance107.29,107.36
Date:___________
Project_________________________________________Permit#_____________________
Landowner:____________________________Applicant:______________________________
Address:_______________________________Address:_______________________________
___________________________________________________________________________
LandownerPhone#:______________________Applicant’sPhone#:______________________
FeeCalculation:
Notes:
1. Besuretoindicatethelimitsofdisturbedandimperviousareaonyourplan.
2. Allrequirementsonthischecklistcorrespondtotherequirementssetforthinchapter44
oftheVillageofBrooklynOrdinance.
3. Bysubmittingthisapplication,permitteeandlandownerpermittheLocalApproval
Authoritytoentertheprojectpropertyforpurposesofinspection.
LandownerorApplicant’sSignature:______________________________________
Date:___________________________
(Ifapplicantisnotthelandowner,attachanotarizedstatementauthorizingapplicantto
actaslandowner’sagent.)
Receivedby:_____________________________Date:________________________
Reviewedby:_____________________________Date:________________________
PermitIssuedby:__________________________Date:________________________
TotalNewImperviousArea(includesgravel)(squarefeet)_________X________$/sq.ft.‐$
TotalRedevelopmentImperviousArea(includesgravel)(squarefeet)_________X_______ _$/sq.ft.‐$
BaseFee=$________________
TotalPermitFee=$______________
click to sign
signature
click to edit
7OF16UPDATED1/3/2018
Stormwate r ManagementApplicationChecklistContinued
Pleasechecktheappropriatebox:I=Included;NA=NonApplicable(if“NA”ischecked,and
explanationmustbeentered)
Applicant Reviewer
PlanRequirement I NA Explanation/LocationinPlan I NA
Narrativedescribingtheproposedproject,
includingimplementationscheduleof
designedpractices

Identificationoftheentityresponsiblefor
longtermmaintenanceoftheproject

Mapshowingdrainageareasforeach
watershedarea

Noincreaseinpeakdischargefor2and10
year24hourstormeventsandsafelypass
the100year24hourstorm,including
summarytable.(runoffratesincubicfeet
persecond)*

Completesiteplanandspecifications*
Engineereddesignsforallstructural
managementpractices

Fornewdevelopment,trap5micronsoil
particle980%reductioninTSS)forthe1
year,24hourstormevent

Forredevelopment,trap20micronsoil
particle(40%reductioninTSS)forthe1
year,24hourstormevent

Treatfirst0.5inchesofrunoffforcontrol
ofoilandgreasefromcommercialor
industrialareas.(seeordinance10729
(b)(2))

Proofofstableoutletcapableofcarrying
thedesignflowatanonerosivevelocity

Alldownspouts,driveways,andother
imperviousareasshallbedirectedto
previoussurfaces,wherefeasible

Provisionsandpracticestoreducethe
temperatureofrunoffforsitesthatdrain
toacoldwaterresourceasidentifiesinthe
ordinance(seeordinance10729(b)(3&
7))(seeThermalLocatorat

8OF16UPDATED1/3/2018
www.co.dane.wi.us/landconservation/hom
ebnd.htm)
Maintenanceplanandscheduleforall
permanentStormwatermanagement
practices

ApplicationRequirement
I
NA
Explanation/LocationinPlan
I
NA
CopyofPreliminaryReviewLetter,if
applicable

Proposedscheduleforcompletionand
installationofallelementsofthestorm
watermanagementplan

Estimatedcostofcompletionand
installationofallelementsofthe
stormwatermanagementplan

Evidenceoffinancialresponsibilityto
completeworkproposedinplan

Copyofaffidavitrequiredbys.14.49(3)(d)
forprivatelyownedstormwaterpractices

Seenotesonnextpage
9OF16UPDATED1/3/2018
VillageofBrooklyn
Stormwate r ManagementPlanNotes
Thesummarytableinplanrequirement4mustincludethefollowing:
Preexistingpeakflowrates
Postconstructionpeakflowrateswithnodetention
Postconstructionpeakflowrateswithdetention
Assumedrunoffcurvenumbers
Timeofconcentrationusedincalculations
Completesiteplanandspecificationsinplanrequirement5mustincludethefollowing:
Propertylinesandlotdimensions
Allbuildingsandoutdooruses,existingandproposed,includingalldimensions
andsetbacks,allpublicandprivateroads,interiorroads,drivewaysandparking
lots,showingtrafficpatterns
Andtypeofpavingandsurfacingmaterial
Allnaturalandartificialwaterfeatures
Depthtobedrock
Depthtoseasonalhighwatertable
TheextentandlocationofallsoiltypesasdescribedintheDaneCountySoil
Survey,slopesexceeding12%,andareasofnaturalwoodlandandprairie
Existingandproposedelevations,sections,profilesanddetailsasneededto
describeallnaturalandartificialfeaturesof
Theprojectsoilerosioncontrolandoverlandrunoffcontrolmeasures,including
runoffcalculationsasappropriate
Detailedconstructionschedule
Copiesofpermitsorpermitapplicationsrequiredbyanyothergovernmental
entitiesoragenciesanyotherinformationnecessarytoreasonablydeterminethe
location,natureandconditionofany
Physicalorenvironmentalfeatures
Allexistingandproposeddrainagefeatures
Thelocationandareaofallproposedimpervioussurfaces
Thelimitsandareaofthedisturbedarea
10OF16UPDATED1/3/2018
VillageofBrooklyn
ErosionControlSimplifiedPlanChecklist
THISFORMMAYBEUSEDONLYFORLANDDISTURBINGACTIVITIESADMINISTEREDUNDERTHE
VILLAGEOFBROOKLYN’SEROSIONCONTROLANDSTORMWATERMANAGEMENTORDINANCE
WHENEVERALLTHREEOFTHEFOLLOWINGCONDITIONSEXIST*(Ordinance107ArticleII):
Thelanddisturbanceisnotmorethan20,000squarefeetinarea
Thelanddisturbanceisnotadjacenttoanddoesnotdraindirectlyintoanysensitive
areasnearby,suchasstreams,lakesorwetlands
Theslopethroughthelanddisturbanceisnotmorethan6%(6ftverticalto100ft
horizontal)
(*Note:Aspecificerosioncontrolplanisrequirediftheaboveconditionsdonotexist.Referto
ordinance10727Brooklyn’sErosionControlOrdinance.)
Instructions:
Completethisplanbyfillingintherequestedinformationonthesitediagramonthenext
page
Submitthisplanatthetimeofpermitapplication
Incompletingthisform,giveconsiderationtominimizingthedisturbedarea,prompt
seeding,andproperplanningofwaterrunoffpatternsthroughallstagesofdevelopment

11OF16UPDATED1/3/2018
SITEDIAGRAM
(UseErosionControlPlanLegen d frompreviouspage)
12OF16UPDATED1/3/2018
Representativesoiltypeofthedisturbedareaonthesite:_______________________________
ProjectLocation(address,city):____________________________________________________
Builder:___________________________________PhoneNumber:______________________
Owner:____________________________________PhoneNumber:______________________
WorksheetCompletedby:_____________________Date:_________________
ErosionControlSimplifiedChecklist
Completethesitediagramwiththefollowinginformation:
SITECHARACTERISTICS
Northarrowandsiteboundary.Indicateandnameadjacentstreetsorroadways.
Locationofexistingdrainagewayswithinandnearbythesite.
Locationofexistingandplannedstormsewerinletsandculvertscrossingnearsite.
Locationofexistingandproposedbuildingsandpavedareas.
Locationandapproximate
dimensionsofthedisturbedareaonthesite.
Approximategradientanddirectionof:1)existingandplannedslopes;and2)existingand
planneddrainagewaysonthesite.
Locationandapproximatewatershedareasofoverlandrunoff(sheetflow)anddrainageway
runoff(concentratedflow)comingontothesitefromadjacentareas.
Representativesoiltypeofthedisturbedareaonthesire(i.e.sandy,loam,siltloam,clay)
13OF16UPDATED1/3/2018
ErosionControlPractices
Locationoftemporarysoilstoragepiles.
Soilstoragepileswillbecontainedbyadownslopesedimentfenceorbecoveredwitha
tarp.Itisrecommendedthattheybelocatedmorethan25feetfromanydownslope
roadordrainageway.
Itisrecommendedthattheybetemporaryseededandmulched.
Locationoftemporarygravelaccessdrive(s).
Graveldrivewillhavetwotothreeinchaggregatestonelaidatleastsevenfeetwideand
sixinchesthick.
Driveswillextendfromtheroadway50feetortothebuilding(whicheverisless).
Locationofsedimentcontrols(filterfabricfence,strawbalefence,rocksedimenttrap,orother
plannedpractices)thatminimizetheamountoferodedsoilleavingthesite.
Sedimentcontrolswillbeinstalledalongthedownslopesidesofthedisturbedareas
unlessitisplannedthatpermanentseedingandmulchingwillbecompletedwithin30
daysofthestartofgrading.
Sedimentcontrolswillbeinstalledaroundsoilstoragepiles,inlets,atoutletsofdrainage
ways,andalongadjacentwayswhichreceiverunofffromthesite.
Locationofsedimentbarriersaroundstormsewerinlets.
Locationofdiversions.
Itisrecommendedthatareasofconcentratedflowbeproperlydivertedaround
disturbedareas.Overlandrunoff(sheetflow)fromadjacentareasgreaterthan10,000sq.
ft.isalsorecommendedtobedivertedarounddisturbedareasinamannerthatwillnot
adverselyimpactadjacentlandowners.
Diversionswillbestabilizedwithseedingandmulchingwithin24hoursofdiversion
completion.
Locationofpracticesthatwillcontrolerosioninareasofconcentratedflow.
Drainagewayswillbestabilizedwithseeding,mulching,andotherappropriatemeasures
within24hoursofdrainagewayscompletion.
Sedimentcontrolswillbeinstalledattheoutletendsofdrainageways.
14OF16UPDATED1/3/2018
ManagementofErosionControl
Temporarystabilizationofdisturbedareas.
Itisrecommendedthatroughgradeddisturbedareas(plannedtobeleftinactivefor
morethan30days)andtemporarysoilstockpiles(plannedtobeleftinactiveformore
thansevendays)bestabilizedbytemporaryseeding(betweenApril1andOctober15)or
byothercover,suchascoveringwithatarpormulching.
TemporaryseedingofoatsorsudangrassarenormallysownbetweenMay15andJuly
15.RyegrassorwinterwheatarenormallysownbetweenJuly15andSeptember15.
Permanentstabilizationofsitebyrevegetationorothermeans.
PermanentseedingwillbecompletedbySeptember15 orsoddingplacedbyNovember
15
Straworgrassyhaymulchingisrecommendedonalldisturbedareasthatareplannedto
beseeded.
PERMANENT SEE DINGTY PE RATEOFAPPLICATION



Useofdownspoutand/orsumppumpoutletextensiontostabilizedareas.
Trappingsedimentduringsitedewateringoperations.
Sedimentladendischargeshouldbetemporarilypondedbehindasediment
barrieruntilmostofthesedimentsettlesout
Properdisposalofbuildingmaterialwastesothatpollutantsanddebrisarenotcarried
offsitebywindorwater.
Maintenanceoferosioncontrolpractices.
Allerosioncontrolpracticeswillbeinspecteddailyandmaintainedinworking
condition.
Accumulatedsedimentwillberemovedfrombehindsedimentfencesand
barriersbeforeitreachesadepththatisequaltohalfthebarrierheights.
Allsedimentthatmovesoffsiteduetoconstructionactivitieswillbecleanedup
bytheendoftheworkday.
Allsedimentthatmovesoffsiteduetostormeventswillbecleanedupassoonas
possible,butatleastbytheendofthenextday.
Temporarygravelacrossdriveswillbemaintainedthroughoutconstructionin
workingcondition.
Allerosioncontrolpracticeswillbemaintaineduntilthedisturbedareasthey
protectarepermanentlystabilizedandestablished,thetemporarycontrol
practiceswillberemoved.
15OF16UPDATED1/3/2018
Scheduleoferosioncontrolpracticesinstallationandsitegrading
Necessaryerosioncontrolpracticeswillbeinstalledpriortothebeginningof
grading.
ACTIVITY DATE
InstallErosionControlPractices
StartGrading
ApplyTemporaryStabilization
ApplyPermanentStavilization
Permanentseedingresponsibilityof:
Name___________________________
Phone#:_________________________
Installationandmaintenanceoferosioncontrolpracticesresponsibilityof:
Name___________________________
Phone#:_________________________
FORADDITIONALASSISTANCEWITHPLANPREPARTION,refertotheVillage’sErosionControl
andStormwaterManagementOrdinance107,WDNRWisconsinConstructionSiteBest
ManagementHandbook,theDaneCountyErosionControlandStormwaterManagement
Manual,andtheUWExtensionpublication,ErosionControlforHomeBuilders.
TheWisconsinConstructionSiteBestManagementHandbookisavailablethroughStateof
WisconsinDocumentSalesat(608)2663558.
TheDaneCountyErosionControlandStormwaterManagementManualisavailablethrough
theDaneCountyLandConservationDepartmentat(608)2243730
ErosionControlforHomeBuilders(GWQ001)canbeorderedthroughCooperativeExtension
Publications,(608)2623346
ContactDaneCountyPlanningandDevelopmentZoningDivisionat(608)2664266orthe
DaneCountyLandConservationDepartmentat(608)2243730forfurtherassistance.
Village
ofBrooklynOrdinance10736
16OF16UPDATED1/3/2018
OFFICE USE ONLY
Date Received: By: Parcel #:
Referred To: Fee: $ Check#
Paid
OFFICE USE ONLY – MATERIALS SENT TO:
Date Sent: Return By:
Response:
Zoning Administrator
Building Inspector
Public Works
Police Department
Fire Inspector
EMS
Village Engineer
Village Attorney (as needed)
APPROVALS
Plan Commission Meeting Date:
Your Request has been:
Approved Not Approved Approved with conditions
Village Board Meeting Date:
Your Request has been:
Approved Not Approved Approved with conditions