2020-01-SDT Page 3 of 4
STATE ENVIRONMENTAL POLICY ACT
(SEPA) REVIEW APPLICATION
SUBMITTAL CHECKLIST
A PDF of each document is required at time of submittal. Please label files as numbered and listed below:
(For example: 02 Project Narrative)
☐
01. Signed Application Form
☐
02. Project Narrative
☐
03. Preapplication Conference Letter (if applicable)
☐
04. Acceptance of Financial Responsibility - Affidavit of Applicant Status
☐
05. Title Report (<30 days old)
− Must be less than 30 days old
− Must be for the parcel(s) related to this application
☐
06. Legal Description
− Must be for parcel(s) related to this application
− Must be a title verified description by a Washington State licensed surveyor
☐
07. Mailing List, Map, and Labels
− Include all property owners within 1,000 feet of the site (2,000 feet for properties within the
Erosion Hazard Near Sensitive Water Bodies overlay)
− Utilize the Excel template provided and upload a PDF version, with the map, under “Mailing List,
Map, and Labels” in MyBuildingPermit.com
− Af
ter submittal, the City will request the Excel version of the template via email
☐
08. SEPA Checklist
☐
09. Critical Area Affidavit
☐
10. Critical Area Study (if applicable)
☐
11. Geotechnical Report (if applicable)
☐
12. Storm Drainage Analysis (Technical Information Report)
☐
13. PW Standards Deviation (if proposed)
☐
14. Plan Set
CERTIFICATIONS & SIGNATURES
I have read this application in its entirety and certify that all information submitted, including any
supplemental information, is true and complete to the best of my knowledge. I acknowledge that willful
misrepresentation of information will terminate this permit application. I understand that my submittal will be
reviewed for completeness and, if found to be complete, will be processed pursuant to Chapter 20.05 SMC.
Applicant/Representative Signature (if applicable)
click to sign
signature
click to edit
click to sign
signature
click to edit