FORM: TSR-1
Total acreage in site:
Total square footage in paved or covered surfaces:
Estimated amount of topsoil to be removed each calendar year for the next five years:
Year #1: Amount: Year #2: Amount:
Year #3: Amount: Year #4: Amount:
Year #5: Amount:
ALL APPLICANTS MUST SUBMIT THE FOLLOWING INFORMATION
NOTE: The site plan must be at a scale of not less than 20 feet to an inch and not more than
100
feet to an inch.
1. Twelve (12) copies of the site plan drawing and application shall be submitted which must
include ALL of the following:
a. The boundaries of the property proposed for top soil removal.
b. All means of vehicular ingress and egress to and from the site and the size and location of
access points.
c. An illustration of the areas of said property where top soil is proposed to be removed and the
soil berm, fence or landscape screening to be used to screen the soil removal operation from
adjoining properties or public facilities.
d. The location of all existing and proposed structures, including, but not limited to, buildings,
fences, culverts, bridges, roads and streets. Include setbacks from property lines.
2. An engineering study showing the grade of the top soil both prior to and after the proposed
removal, and engineering documentation and explanation of the effect of said top soil removal
upon the future installation of sewerage or septic tank facilities, the effect upon future drainage,
and the effect upon the water table located under said property.
3. Drawing and descriptive narrative showing the removal sequence and the means proposed to be
taken to ensure the continuity of natural site drainage flow without undue or uncontrolled
ponding in retention areas.
4. Proposed actions to control dust and noise during the removal operation.
5. A proposed plan, including time sequence, for restoration of the land area after the removal of
top soil.
6. A listing of the names and addresses of all adjoining landowners.