TO
BE
COMPLETED
BY
DCD
TO
BE
COMPLETED
BY APPLICANT
The
Applicant
is
required
to
select
all
deferred
submittals
/
shop
drawings
for
submittal
to
the
City
for
review
and
approval
prior
to
item
fabrication
/
construction.
TO
BE
COMPLETED
BY
DCD
TO
BE
COMPLETED
BY
DCD
TO BE COMPLETED BY APPLICANT
Construction
of
the
project
shall
be
from
approved
plans
only. No
deviation
from
the
approved
project
plans
is
allowed
without
prior
approval
from
the
City
of
Sammamish. Approved
plans
must
be
kept
on
site
and
maintained
in
good
condition.
TO
BE
COMPLETED
BY APPLICANT
Typical
plan
review
comments
are
indicated
below:
TO
BE
COMPLETED
BY APPLICANT
City
review
stamps
and
additional
correction
comments
(if
applicable).
STAMPS AND ADDITIONAL COMMENTS:
DEFERRED
SUBMITTALS:
ENERGY
CODE
AND
VENTILATION
COMPLIANCE INFORMATION:
DRAINAGE
REQUIREMENTS:
PROJECT
ALERTS:
Note
the
minimum
energy
code
and
ventilation
compliance
requirements
below:
STANDARD COMMENTS:
REQUIRED
BUILDING
INSPECTIONS:
No
construction
or noise is
allowed
on Sunday or outside of 7:00
am
to
8:00
pm
Monday
through
Friday and 9:00 am to 6:00 pm Saturdays.
No
construction
is
allowed
on
the
following
holidays:
New Year's
Day,
Memorial
Day,
Independence
Day,
Labor Day,
Thanksgiving
Day and
Christmas
Day.
THE
WORK
TO
BE
INSPECTED
IS
INCOMPLETE
OR
NOT
READY.
THE
PERMIT,
PLANS
OR
INSPECTION
CARD ARE
NOT
ON
SITE
AND
AVAILABLE
OR
THE
INSPECTOR
IS
UNABLE
TO
GAIN
ENTRY
TO
THE
AREA
REQUIRING
INSPECTION.
EXCESS
INSPECTIONS
OR
REINSPECTIONS
(Double
Reinspection
Fee)
REINSPECTION
FEES
A
REINSPECTION
FEE
OF
$120
MAY
BE
CHARGED
FOR
EACH
CITY
INSPECTION
THAT
IS
REQUESTED
AS
FOLLOWS:
1.
2.
3.
6
6
8
10
9
8
7
4
5
WHEN
A
REINSPECTION
FEE
IS
REQUIRED
(AS
NOTED
ON
THE
CORRECTION
NOTICE),
THE
FEE
MUST
BE
PAID
PRIOR
TO
FURTHER
CITY
INSPECTIONS
ON
THIS
PROJECT.
In areas of
flood
hazard and
City
designated land use critical
areas including but
not
limited to steep
slopes,
wetland
buffers
and
shoreline
designated
areas.
Where the
wall
or rockery
supports
a
surcharge.
Where the
wall
or rockery
exceeds
4 feet
in
height.
4
online:
voicemail: (425)
295-0625
www.MyBuildingPermit.com
7
Fire sprinkler /
hydrostatic
and flow test.
Performed
by
Eastside
Fire and Rescue.
Department
of
Community Development
Inspection Requests:
online:
NOTE: ALL RECORDS AND DRAWINGS ARE SUBJECT
TO
PUBLIC
DISCLOSURE
AS REQUIRED BY RCW 42.56
Inspector
shall
initial
and date
appropriate
inspection
only
if
approved.
SFR
Fire
Sprinkler
NFPA
13
NFPA
13R
NFPA
13D
Applicant
Contact
information
prior
to
permit
issuance:
INSPECTIONS:
Listed
in
order
of typical
sequencing
Footings
(including
piling and
shoring)
and
setbacks.
Provide
survey
letter (building
height and
setbacks)
if
required.
Provide
Geotechnical
Engineer /
Special
Inspection
reports
(soil bearing
capacity,
compaction,
earthwork,
pile installation, etc.).
Underground
mechanical
installation and testing.
In-slab
heating
system
installation
and testing.
Erosion control and tree
protection.
Rough hydronic
system installation.
Floor joist and cripple walls prior
to
sheathing install.
Exterior
wall and shearwall nailing prior
to
cover.
Rough
plumbing installation
(DWV,
water)
Shower pan (or tub).
Roof
sheathing
nailing prior to
cover.
Masonry
construction
(fireplace
/ walls /
veneer)
Applicant
is
to
complete
the
following
information.
SOILS
/
GEOTECHNICAL:
REINFORCED CONCRETE:
STRUCTURAL STEEL:
Shoring
installation
and
monitoring
Observe
and
monitor
excavation
Verification
of soil
bearing
Subsurface drainage
placement
Verify
fill
material
and
compaction
Rockery
installation
Pile
placement
(auger
cast/driven
pile)
Other:
Phone:
Phone:
It
is
the
Engineer
of
Record's
responsibility
to
specify
all
required
Special Inspections
(check
items
below).
The
owner
is
responsible
for
hiring
an
approved
private
Special
Inspector
for
the
checked
inspections
noted
below.
All
Special
Inspectors
(except
Geotechnical)
must
be
WABO
certified.
When
Special
Inspection
is
required,
the
report
shall
be
submitted
to
the City
Building
Inspector
prior
to
the City
Inspection.
Note:
Inspection by the
City
Inspector
is
required
IN
ADDITION
TO
the Special
Inspection
or
Structural Observation
indicated
below.
Do
not cover
or
conceal
any
work
prior
to
the
City inspection.
Erosion control
measures
Reinforcing
steel
and
concrete
placement
Retaining
wall
construction
Concrete
strength
Structural steel
erection, field
welds
and
bolting
(WABO
Certification
accepted
in
lieu
of Special
Inspection)
Fabrication
and
shop
welds
OTHER
SPECIAL
INSPECTIONS:
Phone:
Alternative
construction
materials:
Epoxy
grout
installations
Metal
joist
/
metal
trusses
Premanufactured
structures
(stairs,
etc.)
Preconstruction
Meeting to
Review
Conditions of Permit
Issuance.
Erosion control
measures
must
be
as
shown on approved project
drawings.
All
erosion
control shall be in place and
inspected prior to
the
start of
any
site work.
Temporary
site
address
with
minimum
4"
high
numbers
visible
from the
street
must be
installed.
Verify
all
required
City of
Sammamish
permits have
been
issued
prior
to start of the
respective
work.
Possible
permits
include,
but
are
not
limited
to:
Building
Storm
Water
Right-of-way
Use
Rockeries /
Retaining
walls
Other
PERMIT NUMBER
Applicant
Contact
information
after
permit
issuance:
Name:
Address:
Phone:
e-mail:
Site
Considerations
Hours
of work
Construction
vehicle parking
restrictions
Access
road
requirements
ROW
restrictions
Drainage
requirements
Sewer
requirements
Water
service
requirements
On site detention
system
required
Foundation
insulation and
damproofing.
Miscellaneous
Tax Parcel Number
(Lot/plat):
PROJECT
ADDRESS:
APPROVED
DRAWINGS MUST
BE
KEPT
ON THE BUILDING SITE AT ALL TIMES. THIS PERMIT EXPIRES TWO YEARS FROM THE DATE ISSUED. CONTACT THE PERMIT CENTER TO REQUEST A RENEWAL OR EXTENSION.
Refer to
"Conditions
of
Permit
Issuance"
provided
at
permit
issuance for
required
construction
rules
and
regulations,
including
(but not
limited
to):
Refer to
"Preconstruction
Meeting Checklist"
provided at
the
preconstruction
meeting
for other
development
related
rules
and
regulations.
General
Conformance
to
Construction
Documents:
Special
Inspector:
Special
Inspector:
Special
Inspector:
Company:
Company:
Company:
Other:
Phone:
Moment
Frame
construction
Other:
Other:
ENGINEER
OF
RECORD (EOR):
Engineer
of
Record: Company:
Other:
Other:
Building components:
Code Year
Fire code
requirements
Planning
requirements
Shoreline
/ FEMA
Flood
Zone
Fire
Alarm
City
of
Sammamish
Business
License required
for all
subcontractors.
Call the
Washington State
Business
Licensing
Service
at
(800)
647-7706
or
go
online
at
http://dor.wa.gov
for more
information.
On
site
infiltration
system
required
Direct discharge
into
the lake
Declaration
of
Covenant
and
Grant
Easement
INSP
DATE
APPD
It
is
the
applicant's
responsibility
to
schedule
the
appropriate
inspections.
Request
inspections
online
at
www2.
sammamish.us or
www.MyBuildingPermit.com.
Allow
at
least
24
hours
in
advance
of
desired
inspection.
Be
specific
as
to
the
type
of
inspection.
WSEC R406 Energy credit option # and description:
Expansion
anchor
installations
Other:
Other:
Framing and glazing
installation.
Wall and ceiling
insulation
installation.
801 228th Avenue S.E. Sammamish, WA 98075
(425) 295-0500
FAX:
(425) 295-0600
www.sammamish.us
Name:
Address:
Phone:
e-mail:
Attachment and water
resistant
backing board.
103
104
105
102
Eastside
Fire
and
Rescue
Final
101
106
Site and utility: includes
landscape,
utilities
and
ROW.
Restoration
complete and as-built
drawings
ready for
submittal.
Building,
including
mechanical
/ plumbing.
Provide
air
leakage
test,
duct
leak
test,
insulation
certification
as
required.
If
applicable,
provide
closeout
(summary)
letters from
Engineer,
Special
Inspectors, and
Geotechnical
Engineer.
FOUND
FOOTING
FOUND
WALL
PERIMETER
DRAINS
TESC
PRECON
MEETING
STORM
CONNECTION
Foundation
walls and concrete
columns.
Roof and footing
drainage.
Leaders
and footing
drains shall be tightlined and
inspected
prior to
cover.
107
108
109
EXT FOUND
WALL
INSUL
WATERLINE
PLUMBING UNDERGROUND
110
111
112
MECH
UNDERGROUND
IN-SLAB HEATING
SLAB
INSULATION
113
114
115
HYDRONIC
HEATING
UNDERFLOOR
FRAMING
EXT
SHEATH
NAIL
116
117
118
ROOF
SHEATH
NAIL
EXT LATH
ROUGH
PLUMBING
119
120
121
ROUGH
MECHANICAL
AC/HEAT
PUMP TEST
GAS
PIPING
TEST
122
123
124
FRAMING
INSULATION
GYPSUM
NAILING
125
MUD
SET
SHOWER
PAN
FINAL
Gas piping
inspection
and
test.
Storm water
connections.
Water
supply piping (meter to home).
Underground
piping installation and testing.
Under slab
insulation,
vapor
barrier,
reinforcing.
Rough
mechanical,
vents and
connectors,
appliances,
exhaust venting,
whole
house
ventilation,
etc.
Exterior
lath, attachments and stucco detailing.
Refrigerant line
inspection
and test.
Demolition.
Driveway
and access road.
Final
Inspections
that include
the
following:
Masonry
Any
additional
required
inspections.
Rough Fire
COMMENTS
126
Water
and
Sewer
District Final
Flow
Control
BMP
Easement
and
Covenant
Recorded
L&I
Electrical
Electrical
rough-in.
Performed
by Labor and
Industries.
Other:
Connection
to
public storm drainage conveyance
systems
required
Other:
Provide
recorded
agreement
documenting
consent of the
abutting property
owner
prior
to
installation
of
sprinkler
systems, heat pumps,
and
air
conditioning
units
that
project
into
or
are
located
within
an
interior
setback
area
per
SMC
21A.25.190(9).
IVR#
INSPECTION
TYPE
INSPECTION DESCRIPTION
3
2
FOOTNOTES:
Window
and glass
door
guards
are required on operable
windows
when
the exterior sill height
exceeds
72 inches above
grade and
the
interior sill height is less
than
24
inches
above
the
finished
floor
(IRC
R312.2.1).
Glazing
identification
labels are to
remain
on
all
glazing
until
the
insulation
inspection
(IRC
R308.1).
Smoke alarms shall be installed in each
sleeping
room, outside
each separate
sleeping
area
in
the
immediate
vicinity of the
bedrooms
and
on
each
additional
story of
the
dwelling,
including
basements
and habitable
attics
(IRC
R314.3).
Alarms
shall
receive
their primary
power
from the building
wiring
with
battery
back-up. Wiring shall be
permanent
and
without
disconnecting
switch
other than
required
for
overcurrent
protection
(IRC
R314.4)
. Smoke alarms shall be
interconnected
and comply with
the
household
fire
warning
equipment
provisions
of NFPA 72
(IRC
R314.5).
Carbon monoxide
alarms
are
required
on
each
floor and
outside
of each separate
sleeping
area in the
immediate
vicinity
of the bedrooms
(IRC
R315.1)
Gable-end
trusses shall be sheathed with 7/16" OSB or 1/2" CDX full
height
sheathing.
Provide
an
approved
method of
attachment
for shear
flow
from
bottom
chords of
trusses
to double top
plates.
Truss
engineering
documents
stamped
by a
Washington
State licensed
engineer
must be
provided
at framing
inspection.
Provide two seismic braces
/
straps at water
heater
to
structural
framing
and an
approved
thermal expansion tank
(IRC
P2801.7).
All
built-up
studs
shall
be stitched nail with
16d
nails
per edge nailing
spacing
of shear
wall
schedule unless
otherwise specified
by the
engineer
of record.
Provide minimum foundation
vertical reinforcing
at 48"oc
hooked
and
tied into
place
unless
otherwise
noted on the drawings
(IRC
R403.1.3).
Site
retaining
walls
and
rockeries
must be permitted under a separate
permit
per
SMC
16.20.200
paragraphs
(1)
and
(2),
(d)
and
(e)
Preconstruction
meeting
required.
See
footnote
under
Required
Inspections
section
for additional
information.
WSEC Table 402.1.1
Whole
House
Ventilation
System
(IRC
Section
M1507
WA Amendments)
:
Duct Size (M1507.3.6.2)
:
Supply
Fan
(M1507.3.6)
Continuous
(M1507.3.3.1)
Minimum
Calculated
Airflow
(M1507.3.3)
cfm
Exhaust
Fan
(M1507.3.4)
Integrated w/Forced Air (M1507.3.5)
Intermittent Fan (M1507.3.3)
hr
/
4
hr
cycle
Fan Run
Time
(M1507.3.3)
in. diameter (smooth/flex)
Air
Leakage
Testing
(IRC
Section
R402.4.1.2
WA Amendments)
:
Provide
air
leakage test
report
verifying
air
leakage
rate
does
not
exceed
5
air
changes
per
hour.
CONTACT
INFORMATION:
REQUIRED
SPECIAL
INSPECTIONS:
Duct
Leakage Testing
(WSEC
R403.2.2)
:
Labor and
Industries
(L&I)
Final
Heat
Recovery
Ventilation
(M1507.3.7)
Phone:
Special
Inspector: Company:
All
Construction
or
work
for
which
a
permit
is
required
is
subject
to
inspection
by
the
city
of
Sammamish
Building
Division
inspection
staff,
and
all
such
work
is
to
remain
accessible
and
exposed
for
inspection
purposes
until
approved
by
the
City
Building
Inspector.
Neither
the
City
Building
Staff
nor
the
City
of
Sammamish
shall
be
liable
for
expense
entailed
in
the
removal
or
replacement
of
any
material
required
to
allow
inspection.
In
addition
to
required
inspection
listed,
the
City
Building
Official
may make
or
require
other
inspection
of
any
construction
work
to
ascertain
compliance
with
the
provision
of
the
adopted
codes
and
other
laws
which
are
enforced
by
the
code
enforcement
agency.
Special
inspection
(3rd
party
inspections)
may
be
required
per
Chapter
17
of
the
International
Building
Code
and
will
generally
be
listed
within
the
approved
permit
documents
as
provided
by
the
designer
or
specified
by
the
City
in
the
"Conditions
of
Permit
Issuance".
1
1
2
3
For
your
convenience,
the
daily
inspection
schedule
is
posted
by
9AM
on
the
City
of
Sammamish
website
at
www2.sammamish.us
or
www.mybuildingpermit.com
All
above
listed
Inspection
requests
may
not
apply
to
all
(especially minor)
projects.
Additional
visual
inspections
may be
required
by
the
City
of
Sammamish
depending
upon
the
scope
of
your
particular
project.
Do
not
cover
any
item
without
first
obtaining
approval
of
the
City
of
Sammamish
Building
Inspector.
All
inspections
requested
must
be
ready
bv
8:30
am
the
day
of
the
inspection
requested
.
ANY REQUIRED
SPECIAL
INSPECTION
REPORTS
SHALL
BE
PROVIDED
TO
THE
INSPECTOR PRIOR
TO
THE
NEXT
SCHEDULED
INSPECTION
AND
A
COPY
MADE
AVAILABLE
ON
SITE.
Pre-construction
meetings
are
required
on
all
major
projects
that
are
located
along
shoreline
designated
areas,
steep
slopes
or
in wetlands.
These
meetings
may be
optional
in
other
cases,
please
refer
to
your
"Conditions
of
Permit
Issuance".
Temporary
erosion
control
inspections
are
required
as
a
first
inspection
prior
to
any
work onsite.
Email
the
Eastside
Fire
and
Rescue
at
inspections@esf-r.org
48
hours
in
advance
to
schedule
an
inspection.
Please
include
the
permit
number
with
your
request.
Contact
Department
of
Labor
&
Industries,
Electrical
Division,
for
the
Electrical
Inspection
required
prior
to
Framing
Inspection.
Call
(425)
990-1400
to
schedule
inspections.
Contact
the
appropriate
water
and
sewer
district
prior
to
the
Project
Final
to determine
on-site
utility
final
inspection requirements
for
this
project.
Final
sign-offs
on
this
form
are
required
prior
to
the
City
Building
Project
Final
by
the
Utility
Inspector.
All
required
inspections
must be
approved
prior
to
the
FINAL
Inspection.
The
inspector's
signature
of
FINAL
INSPECTION
signifies
all
work
covered
under
this
permit
has
been
completed,
occupancy
or
use
is
approved,
and
the
permit
is
closed.
Declaration
of
Covenant
and
Grant
Easement.
A
declaration
of
covenant
and
grant
of
easement
must be
recorded
for
each
site/lot
that
contains
flow
control
BMPs.
All
required
covenants
and
easements
must be
approved
by
the
city
and
recorded
with
King
County
prior
to
final
sign-off
for
construction
approval
for
this site.
4
5
6
7
8
9
10
THE
OWNER
IS
RESPONSIBLE
FOR
ALL
ERRORS
AND
OMISSIONS.
THE
CITY
OF
SAMMAMISH
ASSUMES
NO
LIABILITY
FOR
ERRORS
AND
OMISSIONS
(16.20
SMC)
APPROVED
TO
CONSTRUCT
PER
19.27
RCW, 16.05 SMC AND 16.20 SMC
SUBJECT TO
FIELD
INSPECTION AND CORRECTION
Approved
Date
Postconstruction
test
(WSEC
R403.2.2.1)
Rough-in
test
(WSEC
R403.2.2.3)
www2.sammamish.us
Check all that apply:
Check all that apply:
Check all that apply:
0.30
Skylight U-Factor
Ceiling R-Value
Wood Fr. Wall R-Value
Mass Wall R-Value
Floor R-Value
Below Grade Wall R-Value
Slab R-Value & Depth
Fenestration U-Factor
0.50
49
21/21
30
10/15/21 int +TB
10, 2 ft.
BTU/hr
Max. Furnace Size (WSEC R403.6)
Air
Duct Leakage
21 int *
CITY OF SAMMAMISH BUILDING DEPARTMENT
Land
clearing,
grading,
filling and
foundation
work
within
geologic
hazard
areas
is
NOT
PERMITTED
between October
1
and
April
30
without proper
installation
and
maintenance
of
erosion control
measures.
Surveyor shall provide or verify elevation points, as required for height survey or FEMA Elevation Certificate, as
noted below. The building setback survey or Impervious surface survey shall be provided as specified. See permit
conditions (attached to the building permit) for the details of required surveys.
GEOTECHNICAL INFORMATION:
SURVEY
REQUIREMENTS
(The
following
survey
information
must be submitted
when
checked):
TEMPORARY
EROSION
AND SEDIMENT CONTROL PLAN:
Surveyor:
Geotechnical
Engineer: Report ID:
Building
height
survey required if > 33' at ridge
No wet season work (October 1st
through
April 30th) involving
clearing
of
vegetation,
grubbing,
grading,
or ground
disturbance
in Erosion
Hazard
or
EHNSWB
Overlay
areas is
authorized
under this permit.
Wet
season
work
will
be approved
only
in limited
circumstances,
and
will
require
additional
review
by the city. To request wet season
work,
a permit revision must
be
submitted
by
appointment
with the Permit
Center
(425-295-0500)
and contain the information
required
in
21A.50.130,
.220
and .225
SMC,
and
other
sections of
the
Sammamish
Municipal
Code as
applicable.
Applications
for wet season work are due no later
than
August 1st
or
2
months
prior to
anticipated
start of
work.
A
completed
Site Plan that includes
the
Temporary Erosion and
Sediment
Control (TESC)
measures
must
be
provided
for
review
and
approval
using the
City
of
Sammamish
TESC
Template
sheet SITE PLAN for
all
projects
exceeding 500
square
feet of
additional
impervious
surface
area.
WET
SEASON
CONDITIONS:
Phone:
FEMA
Elevation
Certification if in floodplain
Average
existing
grade
(shoreline)
Building
setback
survey
Contractor
verified
setback
survey
(string
line)
Average finish grade (upland)
Construction
Documents
During
Construction
Finished
Construction
Impervious
surface
survey
Phone:
Check all that apply:
Geotechnical
Report provided. All
construction
must comply
with
the
recommendations
of the
Geotechnical
Report.
A
copy of
report
and other
geotechnical information must be kept
on
site at all times. Complete per project. Allowable Soil Bearing
psf
TO
BE
COMPLETED
BY
DCD
ISSUE 3.12.15
.7
Exception)
.3 WA Amendments):
)
7.6.2016 (2015 code cycle)
(WSEC Table R402.4.1.1-Air Barrier
and Insulation Installation)
3.3
3.4 (1))
3.4 (2))
Prescriptive
Compliance
Option 1a
Option 1b
Option 1c
Option 1d
0.28 0.25 0.22 0.24
38 38 38
49 Advanced
21 + R-4 21 int + R-12 ci
21 + R-5 ci 21 int + R-12 ci
10 perim., full slab 10 perim., full slab 10 perim., full slab