Fees: 10% of permit fee with a minimum of $250 plus permit fee, plan review and state surcharge, if
separate permits are required. This fee is in addition to the project fees based on the total project value.
Deferred submittal definition: For the purpose of this section, deferred submittals are defined as those
portions of the design that are not submitted at the time of the application and that are to be submitted
to the building official within a specified period. Deferral of any submittal items shall have the prior
approval of the building official. The registered design professional in responsible charge shall list the
deferred submittals on the construction documents for review by the building official. 2014 OSSC
107.3.4.2
Plans and documentation submittal:
• Three (3) copies of plans and documentation are required
• Payment of the minimum fee ($250) due at time of application
• Documents for deferred submittal items shall be submitted to the registered design professional
who shall review them and forward them to the building official with a notation indicating that
the deferred submittal documents have been reviewed and found to be in general conformance
to the design of the building. The deferred submittal items shall not be installed until the design
and submittal documents have been approved by the building official.