The above applicant requests permission to excavate and/or occupy the public right-of-way in the City of Rockford and agrees to indemnify,
hold harmless, and defend the City of Rockford, its officers, agents, and employees, from any and all claims resulting from injuries, including
death, damages or losses, including, but not limited to the general public, which may arise or which may be alleged to have arisen out of, or in
connection with such excavation and occupancy. I hereby agree to perform the work in accordance with the provisions, specifications and
requirements of all of the following:
Chapter 26, as revised, of the City of Rockford, Code of Ordinance and the current version of the City of Rockford Zoning Ordinance.
Traffic control shall always be provided by the applicant or contractor and will be in accordance with the Illinois Manual on Uniform Traffic
Control Devices for Streets and Highways, as revised. A traffic control plan and standard details may be required based on the Engineer’s or
designee’s discretion. 48 hour notice required for
closure.
Accessibility requirements shall be in accordance with the Illinois Accessibility Code and a current IDOT Standard shall be submitted with the
application when applicable.
Erosion & sediment control shall be in accordance with all requirements set forth in the current revision of the General NPDES Permit No.
ILR10. Stabilization measures must be initiated within seven (7) days after construction activities have temporarily or permanently ceased.
All other federal, state, and local requirements as they may apply.
Rev.