List below the party responsible for permanent maintenance of drainage ditches, storm water storage areas, erosion &
sediment control measures etc.
Responsible Party is: ☐Property Owner ☐Homeowner’s Assoc. ☐Leasee of Property ☐Other
Specify:
**If any BMP requires long term maintenance, a Post Construction Management Plan shall be completed and submitted.
**All applicable best management practices for erosion & sediment control must be installed prior to the start of grading.
Contact Brad Holcomb at (779) 348-7611 or brad.holcomb@rockfordil.gov a minimum of 48 hours prior to the start of any
land disturbing activities to arrange for a Pre-Grading Inspection. A Pre-Grading Inspection shall be required for any
project that is adjacent to an environmentally sensitive area (i.e., floodplain, creek, natural habitat, etc.).
Is site in a Special Flood Hazard Area? ☐ No ☐ Yes
If Yes, has Floodplain Permit been submitted? ☐ No ☐ Yes
Does the Tentative Plat Apply? ☐ No ☐ Yes
If Yes, has it been submitted? ☐ No ☐ Yes
Does the Grading Plan Apply? ☐ No ☐ Yes
If Yes, has it been submitted? ☐ No ☐ Yes
Is Site Over 1 Acre of Disturbance? ☐ No ☐ Yes
If Yes, has SWPPP & ES&C Plan been submitted? ☐ No ☐ Yes
If Yes, has NOI been submitted to IEPA? ☐ No ☐ Yes
Does the Post Construction Management Plan Apply? ☐ No ☐ Yes
If Yes, has it been submitted? ☐ No ☐ Yes
Is site adjacent to an Environmentally Sensitive area? ☐ No ☐ Yes
If Yes, has pre-grading inspection been scheduled? ☐ No ☐ Yes
Has site been surveyed for Endangered Species?? ☐ No ☐ Yes
If Yes, has survey been submitted? ☐ No ☐ Yes