200
500 West Walker St. League City, TX 77573 Phone: 281-554-1429 Fax: 281-554-1460
$
Describe work to be done:
Subtract Plan Review:
Recording Instrument#:
(When permit is approved) Final Amount Due:
Legal Description:
Lot: Block: Subdivision: Section:
Type of permit:
BUILDING
MECHANICAL
ELECTRICAL
PLUMBING
GAS
OTHER
Owner: General Contractor:
Street: Street:
City, State, Zip: City, State, Zip:
Phone No.: Phone No.:
E-Mail: E-Mail:
Subcontractors:
Company Name
Electrical:
Plumbing:
Mechanical:
Building Information:
Total Area:
Flood Zone:
Base Flood Elevation:
Stories: Finished Floor:
Type of Construction (IBC Ch 5): Lowest Adjacent Grade:
Occupant Load: Elevation Cert. (if in SFHA)
No Rise Cert.
Provided Documents: Submit one (1) copy of each (that applies) on a digital CD.
Survey
Plot Plan
Energy Cert.
Plumbing / Gas Riser
Mechanical Layout
Elec. Load Analysis
Construction Plans
Asbestos Survey
TDLR #
Private Sewage Permit
Well Permit
Other
Fire Marshal
Historic District
County Health District
Printed Name:
Phone No.:
E-Mail:
Additional Comments: Initial Review
By: Date:
Approved
By: Date:
BUILDING DEPARTMENT
$
(Check all that apply.)
If not using city service, attach a copy of the approved County Health District permit for this address.
$
$
NOTICE: I HEREBY CERTIFY THAT I HAVE READ
AND EXAMINED THIS APPLICATION AND KNOW
THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS AND ORDINANCES
GOVERNING THE TYPE OF WORK WILL BE
COMPLIED WITH, WHETHER SPECIFIED OR NOT.
THE GRANTING OF A PERMIT DOES NOT
PRESUME TO GIVE AUTHORITY TO VIOLATE OR
CANCEL THE PROVISIONS OF ANY OTHER STATE
OR LOCAL LAW REGULATING CONSTRUCTION OR
THE PERFORMANCE OF CONSTRUCTION. I
UNDERSTAND THE LEAGUE CITY CONSTRUCTION
TIMES ARE FROM 7:00AM TO 7:00PM AND
CITATIONS WILL BE ISSUED IF NOT COMPLIANT.
Estimated Cost of Construction:
CRF's Due: $
Total Permit Fee Cost:
Master's Name
City of League City
Commercial Permit Application
Project
Address:
Permit No.:
Date:
Fee Due: $
NOTE:Constructionormodificationsofstructuresover250sq.ft.require engineered plans meetting federal, state,
and local codes and ordinances.Proof of TDI Windstorm Certification must be provided to the Building Department
for Final. Structures in SFHA require Elevation Certificates.
Storm Water Pollution Prevention Plan (SWPPP) should be in place at all times during construction.
I HEREBY IRREVOCABLY AUTHORIZE THE CITY OF LEAGUE CITY, ACTING THROUGH ITS EMPLOYEES, AGENTS, AND
REPRESENTATIVES, TO ENTER UPON THE SUBJECT PREMISES AND INTO ANY STRUCTURES THEREON, FOR THE
PURPOSES OF INSPECTING AND EVALUATING COMPLIANCE WITH ANY PERMIT ISSUED AS A RESULT OF THIS
APPLICATION.
AdditionalDepartment/AgencyApprovals:
Operations Permit
Revised: Sept 2018
Site Development Plan
LeagueCityBuildingCodes
□ 1-Hour □ 2-Hour □ 3-Hour □ 4-Hour
□ 1-Hour □ 2-Hour □ 3-Hour
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
□□
Roof overhang dimensions on all
elevations
Indirect drain connections for 3
compartment sink & ice machine
IfRetailFoodEstablishment
Kitchen Layout
Location of 3 compartment & mop sink
Location of storage area
All areas and rooms denoted and listed
All door & window sizes shown/scheduled
Location of Grease Trap
Kitchen Vent Hood Type
Elevations shall be labeled as north,
south, east and west
All pertinent dimensions shown
FloorPlanandElevations
Special Occupancies
Signage
Weather Protection
Fire Classification
Materials
Exist Signs
Ramps/Handrails
Travel Distance
Direction of Travel
Number of Exists
Anchorage to Concrete - Strength Design
Details of Reinforcement
Imaginary Line between buildings
Dead & Live Loads
Soil Lateral Loads
Flood Loads
Structural Integrity
Soil & Foundation - Chapter 18
Wall/Roof-Projections
Exist Access
Corridors
FireProtection‐Chapter9
Fire Alarm
Smoke Control Systems
Emergency Alarm Systems
MeansofEgress‐Chapter10
General Means of Egress
Egress Width
Anchorage to Concrete - Allowable Stress Design
Fire Suppression System Type
Accessible Means of Egress
Embedded Pipes & Construction Joints
Structural Plain Concrete
Minimum Slab Provisions
Excavation, Grading & Fill
Foundation & Retaining Walls
Embedded Posts & Poles
Dampproofing & Waterproofing
Smoke Detectors
Occupant Load
Means of Egress Illumination
Foundations
Concrete - Chapter 19
Durability Requirements
Quality, Mixing & Placing
Formwork
Smoke and Heat Vents
Rated Assemblies
Opening-Penetrations
Concealed Spaced
Property Line
FireResistiveConstruction‐Chapter7
FireSeparationDistance‐Chapter7
Center of Street/alley/public way
Exterior Walls - Chapter 6
Fire-Walls, Barriers, Partitions
Draft/Fire Stops
Separation Rating - Chapter 5
LeagueCityBuildingDepartmentChecklist
Design must comply with all applicable adopted 2015 ICC Codes and NEC 2014
All MEP's design sheets are to be reviewed and sealed by a professional engineer licensed in the state of Texas.
Check if applicable to your project construction
Construction Documents
Roof Insulation
Roof Assembles and Rooftop Structures - Chapter 15
Rooftop Structures
Accessibility- Chapter 11
Accessible Route
Accessible Entrances
Load Combinations
Structure Design - Chapter 16
General Design Requirements
200
500 W. Walker St. League City, TX 77573 Phone: 281-554-1429 Fax: 281-554-1460
Building Permit
Construction cost over:
Per Additional $1000:
Plus :
Scheduled Base Fee:
Plan Review Fee:
Total:
Electrical Permit
Cost Per: Quantity: Subtotal
Scheduled Base Fee: $50.00
Meter Loop: $10.00
For each Circuit: $10.00
Temporary Service Pole (T-Pole): $25.00
Temporary Cut In (TCI): $25.00
Transformer (per KVA): $5.00
Total:
Plumbing Permit
Cost Per: Quantity: Subtotal
Scheduled Base Fee: $50.00
Each fixture, floor drain, or trap: $5.00
Water and/or Sewer (new, replaced, or repaired) $10.00
Backflow Preventer $25.00
Total:
Gas Permit
Cost Per: Quantity: Subtotal
Scheduled Base Fee: $50.00
Each fixture outlet: $5.00
Total:
Mechanical Permit
Cost Per: Quantity: Subtotal
Scheduled Base Fee: $50.00
Units over 5 tons (per Ton): $10.00
Total:
Total of all permit fees:
BUILDING DEPARTMENT
Revised: Sept 2018
Fee Due:
$
$
$
$
City of League City
Estimated Cost of Construction:
Commercial Permit Application
Project
Address:
Permit No.:
$
CRF's Due: $
$
$
Date:
Site Development Plan
Cost Per: Quantity: Subtotal
Acreage:
Total:
$
Fee: