CITY OF CIBOLO
200 S. MAIN STREET / P.O. BOX 826
CIBOLO, TX 78108
PROJECT ADDRESS:
CONTRACTOR NAME:
CONTACT NAME: PHONE:
PROPERTY OWNER NAME: PHONE:
DESCRIBE WORK:
ITEM Quantity
CCMA - Sewer - North (Cibolo Creek Municipal Authority)
$1,800.00
CCMA - Sewer - South (Cibolo Creek Municipal Authority)
$1,411.00
CCMA Administration Fee - (Sewer)
$15.00
Core Drilling Fee TBD / Billed Amt
Sewer Impact Fee $747.19
Sewer Impact Fee (2013) $1,770.00
Tap Fee - Wastewater - 5 ft deep or less $1,373.00
Tap Fee - Wastewater - Modified - 6 ft deep or more
$1,373.00/$375.00
($1,373.00 + $375.00 per # of feet of depth - modified Tap Fee)
Tap Fee - Water - Long Service $1,585.00
(Long Service = main not on same side of street as meter)
Tap Fee - Water - Short Service $520.00
(Short Service = main on same side of street as meter)
Water Deposit $60.00
Water Impact Fee $2,276.94
Water Impact Fee (2013) $3,595.00
Water Meter Size:
5/8" meter $291.50
3/4" meter $308.00
1" meter $325.00
1 ½" meter $580.00
2" + meter (Cost + 10%)
Water Meter Installation Fee:
5/8" to 1½" meter $60.00
2" meter to less than 4" meter $75.00
4" meter and larger $120.00
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTOR OF A PERMIT DOES
NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY CITY GUIDELINES, ORDINANCES, CODES, STATE OR LOCAL LAWS
REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
THE FEES CALCULATED HERE ARE ESTIMATES ONLY. THE FINAL FEES WILL BE DETERMINED WHEN THE
APPLICATION AND REQUIRED DOCUMENTS ARE RECEIVED AND REVIEWED.
SIGNATURE OF AUTHORIZED AGENT PRINTED NAME DATE
**Note: Inspection of permitted work may reveal code violations not discovered during plan review. CDS 030
Updated 04/06/17
Phone: (210) 658 - 4175 Fax: (210) 658 - 8065
WATER & SEWER TAP FEE / WATER METER PERMIT APPLICATION
WORK IS COMMENCED.
MONTHS, OR IF CONSTRUCTON OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 6 MONTHS AT ANYTIME AFTER
NOTICE - THE PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITH 6
Cost
Enter ft of depth
click to sign
signature
click to edit