PLAN VIEW
Show existing shorelines.
Show ebb and flood in tidal waters and direction of flow in non-tidal rivers.
Show unusual current patters if applicable.
Show mean high and low waterlines if the proposed activity is in tidal areas.
Show ordinary high water line and ordinary low water line if proposed activity is
in a lake, river or stream.
Show an existing bridge, if any is to be replaced, and whether or not it is to be
removed.
If the bridge will have a draw, show the draw in the open and closed positions.
Show principal dimensions of structure from grade to grade. Show length, width,
etc. Show location and dimensions of sidewalks, railings, pipelines, etc.
Show location of dredging, excavation, fill or rip-rap. Give approximate number
of cubic yards and type of material.
Identify and show location of any fenders, dolphins, piles, cables, etc. existing or
to be constructed in the waterway. Identify type of material to be utilized.
Show limits of maintained navigational channel, if applicable.
Show axis of channel.
Show horizontal clearances, normal to the axis of the channel.
Show water depth at mean low or ordinary low water at various locations in the
channel, under, upstream and downstream of the bridge.
ELEVATION VIEW
Show mean high and mean low water elevations in tidal areas. Show ordinary
high and low water in non-tidal areas.
Show horizontal clearances normal to the axis of the channel(s).
Show vertical clearances above mean high or ordinary high water. Vertical
clearances should be shown at waterward face of each pier and at center of
navigational channel.
Show proposed and existing contour of waterway bottom.
Show 100 year flood height and flood of record.
SECTION VIEW
Include location of sidewalks, fishing platforms, railings pipelines, fenders, rip-
rap, etc.
FENDERS (if applicable)
Show fenders in plan and elevation views including detail of attachment to pier,
countersunk bolts, and relationship to mean high and low waterlines (on elevation
view).