Wireless Communication Facility Application Page 5 of 5 March 2018
PART IV: SUPPORTING MATERIALS AND INFORMATION
Include the following materials and information as applicable. Applications that do not include all
required materials will not be accepted. Please see STC 18.60.040.C for the complete list of
required items and for further detail on each.
Completed Wireless Communication Facility Application form
Applicable review fees per STC 3.10, including but not limited to:
o Wireless Communication Tower review fee
o Conditional Use Permit fees (if applicable)
o Development Plan fees (if applicable)
o Fees for outside professional review of technical reports
Letter of Authorization from the Wireless Carrier for agent
Letter of Authorization from the Property Owner approving the facility on their property, or if
the facility is in the right-of-way, an attestation that the applicant has authorization to install,
maintain, and operate transmission equipment in the right-of-way. Further permitting through
the Public Works Department will be required.
Site plan or, for CUPs, a Preliminary Development Plan, including the elements described in
STC 18.91.030.F.
o Drainage and traffic statements, stamped by a registered civil engineer, are required
Photo simulations showing before and after renderings of the site and any structures,
vegetation, or topography that will screen the proposed facility, from multiple viewpoints.
Include any potential eligible facilities modifications. Selected viewpoints should be located
approximately a half-mile, 1 mile, and 2 miles from the site with an accompanying map
showing where each photo was taken. Alternative viewpoints may be approved by staff.
Elevation drawings
If not a collocation on an existing vertical element, the following materials are also required:
o List of existing vertical elements within a 1-mile radius*
o Narrative explaining why the applicant cannot collocate*
o Provider’s policy statement on collocation and mitigation of tower proliferation
o Signal coverage gap maps*
o Engineer’s report describing tower capacity, including number and types of antennas.
o FAA and FCC compliance statement from engineer
Applications requiring a Conditional Use Permit procedure shall also include the following:
o Completed CUP application and fees
o Any other items required by STC 18.97
o Map showing WCFs within a 2-mile radius
o Narrative description of camouflage possibilities explored
o Alternative site comparison including photo simulations*
If noise will be audible beyond the property lines, a noise report is also required
Applications for facilities in the right-of-way are subject to additional submittal requirements
as described in STC 18.60.070.E.
Any other documentation as may be required by STC 18.60.040.C
Three copies hard copies of all documents and a CD or USB drive containing pdf images
*Not required for facilities located in the public right-of-way.