Revised 11/2016
2
Site plan, elevations, antenna details, and equipment layout (2 copies)
Set of plans and conditions of approval from the original permit and any
entitlements (including Conditional Use Permit or other zoning approval) applicable
to the property or support structure
OR
N/A
If the modification will result in a height increase: Dimensioned plans or
drawings showing the height of the support structure as originally approved and
constructed, or as of the most recently approved modification prior to February 22,
2012, whichever height is greater
OR
N/A
If the modification is on a concealed or camouflaged facility: A statement
describing the existing concealment or camouflage elements and demonstrating
that the proposed modification will not defeat the concealment or camouflage
OR
N/A
If the modification will alter exterior dimensions or appearance of the support
structure: Color photo simulations with a minimum size of 8.5”x11”. The photo
simulations shall include “before” and “after” renderings of the site, its
surroundings, and the proposed facility and antennas at maximum height, and any
structures, vegetation, or topography that will screen the proposed facility from
multiple public viewpoints. Public viewpoints selected for the simulations should be
located approximately a half-mile, 1 mile, and 2 miles from the proposed facility,
with an accompanying map showing where each photo was taken. If the
modification is on a building, all elements of the proposed project must additionally
be shown in one or more close-in photo simulations.
OR
N/A
If the modification will protrude from the edge of a non-tower structure:
Dimensioned plans or drawings showing the edge of the eligible support structure.
OR
N/A
If the modification will include excavation or deployment beyond the current
site or would result in a protrusion beyond existing equipment or a non-tower
support structure: A legal description and a scaled drawing showing the site
boundaries, the existing tower or base station, and the proposed location,
elevation, and dimensions or the new or replacement equipment.
OR
N/A
If structural hardening is proposed: A technical report by an Arizona registered
engineer demonstrating that the hardening conforms to code requirements.
OR
N/A
If the modification is to a tower: A stamped report by an Arizona registered
engineer demonstrating that the tower with the modifications will comply with
applicable structural, electrical, and safety codes, including wind speed, and
describing the general structural capacity of the tower with the modifications.
If the modification is to a base station: A stamped report by an Arizona
registered engineer demonstrating that the base station with the modifications will