As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
AS-BUILT PLAN OF DEVELOPMENT (POD)
SUBMITTAL FORMS INDEX
INSTRUCTIONS & CHECKLIST
APPLICATION PROCESS & TIMEFRAME
INFORMATION REQUIRED FOR SUBMITTAL
PROCESS FLOWCHART & PROJECTED TIMELINE
AS-BUILT POD LAND USE APPLICATION
AFFIDAVIT SAMPLE
TYPICAL RESIDENTIAL SITE PLAN (SAMPLE)
TYPICAL COMMERCIAL SITE PLAN (SAMPLE)
WHAT TO EXPECT AT THE ONE STOP SHOP
Note: As of December 31, 2012, all Land Use applications are subject to ARS § 1605.
- As of September 13, 2013 all Residential uses are excluded per ARS §11-1605 M.2
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
APPLICATION PROCESS AND TIMEFRAME
An As-Built POD will be allowed for commercial or residential developments existing prior to
September 22, 2008. Industrial developments have a similar allowance, but subject to the
existing effective date of October 15, 1984.
Applications submitted to the Maricopa County Planning and Development Department shall
include all of the exhibits, items and information listed in this checklist. An application will only
be accepted by the Department when all of the items listed below are submitted, unless
otherwise deemed unnecessary by staff. Applications determined to be incomplete shall not
be processed by staff. Additional information, detail, and/or copies may be required after
review by the assigned planner.
After it has been determined that the initial submittal is complete, the filing fee per Zoning
Ordinance requirement is to be paid by the owner or owner’s authorized a gent (checks
should be made payable to Maricopa County Planning and Development”). A receipt will
then be issued and a case number assigned.
As of September 13, 2013, the Land Use application process shall be subject ARS § 1605, a
State statute that mandates establishment of timeframes to either approve or deny a
“license” as defined by the statute. The full statute may be viewed at:
http://www.azleg.gov/arstitle/
The statute sets up two types of review timeframes: Administrative and Substantive. The
Board of Supervisors (BOS) through the P-30 Licensing Timeframes Ordinance has adopted a
25 day administrative timeframe and a 75 substantive timeframe for Land Use applications.
An application related to a residential use is not subject to the statute. An application that
is part of design build project may establish negotiated time process during the pre-
application meeting.
Administrative Review Period
The statutes allow for multiple reviews during the administrative review period.
Substantive Review Period
Only one review is allowed for the substantive review period. The County can amend the
substantive review comments to address legal requirements not identified on the original
substantive review comments.
The applicant can authorizes a 50% time increase. This authorization can be given at time of
application or at any time during the process.
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
APPLICATION PROCESS AND TIMEFRAME (Continued)
After receipt of an application, the administrative review period begins and staff will review
for administrative completeness. The applicant will receive a formal response from their assigned
planner and may be required to submit additional information. Once administrative comments
have been given to the applicant, the timeframe clock will stop and will resume upon
resubmittal of the application materials. Once the application is deemed administratively
complete, the planner will formally notify the applicant that the project has entered the
substantive review period and technical comments will be given to the applicant within a
reasonable timeframe. The substantive timeframe clock stops from receipt of comments until
the applicant makes a formal resubmittal.
At any time during the process, an applicant can check the status of their application by
viewing the Citizens Access Portal on the Planning and Developments website:
https://accela.maricopa.gov/CitizenAccessMCOSS/
The applicant’s assigned planner can also be utilized as a resource for checking application
status. If at any time comments are given to the applicant, a notation will be made as to the
administrative or substantive timeframe frame remaining which will not resume until a
resubmittal is made. Note: It is very important to return the planner’s comment memo
upon resubmittal so that the appropriate statutory timeframe can resume.
Depending on the comments received, the application materials may need revisions. The
owner or authorized agent must submit revised materials to the OSS. The applicant’s
resubmittal must meet the County’s technical requirement or it will be denied. Additionally,
an administrative decision of denial can be made if the Director finds that it is not possible to
grant the application within the timeframe or the applicant has not provided additional or
supplemental information within 180 days (not working days) of a written or electronic request
for said information.
Once staff is satisfied that technical requirements have been met, staff may approve or
deny the request. At this time, the substantive timeframe clock will stop. After a decision has
been made, a decision letter will be issued.
The conditions of approval of this application may be appealed to the Hearing Officer
pursuant to ARS § 11-832. Provide request for appeal to the Hearing Officer Liaison at this
address within 30 calendar days of the administrative/ministerial approval date to schedule
an administrative hearing.
Note: If an applicant has not made a resubmittal of application materials in either
administrative or substantive review periods after six (6) months, the application will be
closed due to inactivity.
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
INFORMATION REQUIRED FOR SUBMITTAL
1. Application: completed and signed – 2 copies
2. Proof of ownership (recorded deed or unofficial copy) 1 copy.
If applicable, lease agreement. If the subject property is part of a land lease,
the Lease Agreement should include the terms of the lease, and the
proposed use of the leased land. Additional information may be required after
reviewing the Lease Agreement.
3. Site Plan – 2 copies (11”x17” or 8 1/2” x 14”) of the property, indicating the
following:
The site plan must be drawn to a recognizable scale, i.e. 1” = 20’.
North arrow and scale (written and graphic scale) shown on plan.
All property lines must be clearly shown and dimensions indicated.
Location and dimensions of all existing and proposed structures (including
fences, signs and pools) from property lines and distance between
structures.
Location and width of dedicated streets, recorded easements, (provide
recording number) and patent easements on or adjacent to property
(include names of streets if applicable).
All existing and proposed structures must be shown and dimensioned on the
site plan.
4. Narrative2 copies, describing the proposed use in detail, including:
Description of proposal, including use(s), business operations, hours/day of
operation, and number of employees.
Description and location of existing buildings, also discuss if any additional
construction is proposed.
Address the utility providers for water, sewer, police and fire services.
5. Photographs
Submit photographs of the site, taken on all four corners of the property and
looking inward to the property (minimum of four photographs).
Please label each photograph with the view, direction and date.
A site plan or key map may also be used in conjunction with the photographs
with notations showing what direction the photograph faces and where it is
taken.
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
6. Electronic copies of application materials saved in Adobe PDF files 1 CD or jump
drive. Example Narrative Report should be saved as NARR-RPTS-1.pdf
Application Document
Required Naming Convention for the Adobe
PDF documents
Completed Application
APPL-FORM-1
Official recorded or unofficial deed
DEED-DETL-1
Site Plan
SITE-PLAN-1
Narrative Report
NARR-RPTS-1
Photographs
PHOT-DETL-1
Patent Easement (if applicable)
PEAS-DETL-1
7. Copy of the Patent Easement Deed (if applicable) which may be acquired at the
Bureau of Land Management, 1 N. Central, Phoenix, (602) 417- 92001 copy
8. Evidence of As-Built existence 1 copy
For commercial properties prior to September 22, 2008; and evidence of Industrial
developments are subject to the effective date of October 15, 1984. The burden
of proof is on the owner/owner’s authorized agent to provide adequate
verifiable documentation of the claim involving an As-Built POD. One or more of
the following are acceptable examples:
An original copy indicating flight data of an aerial photograph showing
the use/activity prior to May 29, 1969, the structure prior to January 1,
2000, or other effective date of the zoning ordinance that applies.
Previous permit(s) with all necessary information.
Documentation from the Assessor’s Office, Recorder’s Office, utility
company, or other official entity, and two notarized Affidavits of Non-
Conforming Use (sample attached).
9. Fees:
Zoning Clearance (Residential$100 or Commercial/Industrial$250)
Addressing Review Fee of $10 to verify an existing address or $50 to assign an
address (This fee is a separate fee but can be combined with the zoning
clearance fee).
Change to an application for a license in progress $50
For an application to be added to an application for a license in progress $50
To re-initiate application for a license administratively denied due to time (within
180 days)$50
Appeal of administrative denial of a license due to time (within 30 days) $150
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 12/29/2016
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
PROCESS FLOW CHART & PROJECTED TIMEFRAME
Approximate timeframe of 1 month
Submittal of application at front counter
(One Stop Shop)
Application to primary reviewing agencies including
Planning and Addressing
Review Comments or Sign-Off
(approximately 2 weeks following resubmittal)
Application
resubmittal
1 review cycle
Sign-Off received, staff
will issue a decision
letter
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 2/9/2018
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
AS BUILT POD LAND USE APPLICATION
REQUEST
Title of Project:
Description of Request:
Existing Use of Property:
Existing Zoning District:
Related Case Number:
PROPERTY INFORMATION
Address (if known):
General Location
(Include nearest city/town):
Size in Acres: Square Feet:
Legal Description Section: Township: Range:
Assessor’s Parcel Number:
OWNER’S AUTHORIZED AGENT INFORMATION
Name: Contact:
Address:
City: State: Zip:
Phone #: Fax #:
E-mail Address:
PROPERTY OWNER INFORMATION
Name: Contact:
Address:
City: State: Zip:
Phone #: Fax #:
E-mail Address:
PROPERTY OWNER AND OWNER’S AGENT AUTHORIZATION
I (property owner) authorize (owner’s agent) ____________________________________
to
file this application on all matters relating to this request with Maricopa County. By signing this form as the property owner I
hereby agree to abide by any and all conditions that may be assigned by the Maricopa County Board of Supervisors,
Maricopa County Planning and Zoning Commission, or Maricopa County Planning and Development Department staff as
applicable, as part of any approval of this request, including conditions, development agreements, and/or any other
requirement that may encumber or otherwise affect the use of my property.
INSPECTIONS
By submitting this application, I am inviting County staff to conduct all site inspections they deem necessary.
PROPOSITION 207 WAIVER
The property owner acknowledges that the approval being sought by this application may cause a reduction in the existing
rights to use, divide, sell or possess the private property that is the subject of this application. The property owner further
acknowledges that it is the property owner who has requested the action sought by the filing of this application. Therefore,
pursuant to A.R.S.§12-1132 through 1138, the property owner does hereby waive any and all claims for diminution in value of
the property with regard to any action taken by Maricopa County as result of the filing of this application.
Property Owner Signature: Date: ____________________________________
VERIFICATION OF APPLICATION INFORMATION
I certify that the statements in this application and support material are true. Any approvals or permits granted by Maricopa
County in reliance upon the truthfulness of these statements may be revoked or rescinded.
Owner or Authorized Agent Signature: Date: _________________________________
ARS § 1605 TIMEFRAME EXTENSION
I authorize a 50% timeframe extension for the review of my application as adopted by the Board of Supervisors per ARS § 1605
and as amended.
Property Owner Signature: Date: _________________________________
ALL FEES ARE DUE AT TIME OF APPLICATION AND ARE NON-REFUNDABLE
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
AFFIDAVIT SAMPLE
Maricopa County
Planning & Development
501 North 44
th
St., Suite 200
Phoenix, AZ 85008
Reference: 123 Sample Road, Sample City, AZ 85000
Assessor’s Parcel Number: 123-45-678
To Whom It May Concern:
I hereby certify the referenced property’s existing use as a LANDSCAPING BUSINESS was
established prior to May 29, 1969, the effective date of the Maricopa County Zoning
Ordinance. The use has been continued without an interruption that exceeded 12
consecutive months. I have personal knowledge of this property because; I HAVE
LIVED IN THE AREA SINCE 1959 AND PASS BY IT FOUR OR FIVE TIMES A WEEK.
Name: Joe Smith
Signature: Joe Smith
Address: 40 Example Road, Sample City, AZ
Date: May 22, 2003
SUBSCRIBED AND SWORN before me this
of
, .
________________________________
Notary
Public
My Commission Expires:
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
EXAMPLE OF A TYPICAL RESIDENTIAL SITE PLAN
SAMPLE ONLY (DRAWING SHOWN IS NOT TO SCALE)
ADDITIONAL DETAILED PLANS MAY BE REQUIRED
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
EXAMPLE OF A TYPICAL COMMERCIAL SITE PLAN
VERIFY ALL REQUIREMENTS FROM THE FOLLOWING MARICOPA COUNTY AGENCIES PRIOR TO
DRAWING SITE PLAN:
PLANNING AND DEVELOPMENT
ENVIRONMENTAL SERVICES
DRAINAGE REVIEW
DEPARTMENT OF TRANSPORTATION
SAMPLE ONLY (DRAWING SHOWN IS NOT TO SCALE)
ADDITIONAL DETAILED PLANS MAY BE REQUIRED
501 North 44
th
Street, Suite 200 Phoenix, AZ 85008 (602) 506-3301
www.maricopa.gov/planning
As-Built POD 10/30/19
MARICOPA COUNTY
PLANNING & DEVELOPMENT
DEPARTMENT
WHAT TO EXPECT AT THE ONE STOP SHOP
Purpose:
Provide customers with information about what to expect when submitting an As
Built POD application. This information sheet includes the application material
checklist, fee schedule,
and a three step process for application submittal.
Location:
Maricopa County Planning & Development Department
501 N. 44
th
Street, Suite 200 Phoenix, AZ 85008
Business Hours: 8:00 a.m.5:00 p.m. Monday through Friday, except holidays (to ensure adequate
time for
application submittal, projects should be submitted no later than 4:30 p.m.)
STEP 1 - Reception: Proceed to the One Stop Shop Reception desk to obtain a call ticket for the application
submittal. Provide the receptionist your name and specify the type of planning
application.
STEP 2 - Intake Counter: One Stop Shop customer service will call your ticket number and evaluate
the
application materials for completeness. Once the application materials are accepted a tracking number
will be
provided and staff will advise you to proceed to the cashier to process application payment. The
following is a list of
required application materials:
2 copies Land Use Application – completed & signed
1 copyRecorded deed or unofficial copy
2 copiesSite Plan 11” x 17” or 8 1/2” x 14”
2 copies Narrative
1 copyPhotographs
1 copyEvidence of As-Built POD
1 copyPatent Easement Deed (if applicable)
1 CD or jump drive with electronic copies of application materials
NOTE: If any documentation is missing your application may not be
accepted during
the intake process, please be sure to follow this checklist
STEP 3 - Cashier - Processing Payment: The cashier will call your ticket number, request your
application
tracking number, advise you of the total application fees and request your method of payment.
Maricopa County
accepts cash, check, or credit card. Please make checks payable to: MARICOPA
COUNTY.
Please note that proper payment in full, based upon the following fee schedule, is required at
the time of application:
As-Built POD Application
Fee Schedule
Zoning Clearance
Residential $100
Commercial/Industrial $250
Addressing
$10 verify existing address or
$50 assign address