Page 2 of 3 09/2021
Electrical Code being used: [ ] 2020 Indiana Residential Code [ ] 2009 Indiana Electrical Code
Plumbing Code being used: [ ] 2020 Indiana Residential Code [ ] 2012 Indiana Plumbing Code
Sewer Disposal: [ ] Public [ ] Other
Water Supply: [ ] Public [ ] Individual Water
2020 ENERGY COMPLIANCE METHOD
[ ]
Prescriptive (most restrictive)
[ ]
Total UA (allows building envelope trade offs)
[
]
Performance (most flexible, considers heating, cooling, and water heating costs only)
DRIVEWAY: [ ]
New [ ] Repair [ ] Reconstruction
SIDEWALK: [ ] New [ ] Repair [ ] ADA Curb Ramp
SANITARY SEWER, TAP CONNECTION: [ ] New [ ] Repair [ ] Conversion [ ] Septic
In accordance with Senate Enrolled Act No. 393 (SEA 393) regulations, all Class 2 structures must disclose
the types of advanced structural components used in the qualifying property.
Advanced Structural Components Used:
[ ]
Floor (specify below)
FINANCIALLY RESPONSIBLE PARTY
Person to be billed for all
expenses relating to permit :
CERTIFICATION & NOTICE OF INTENT TO COMPLY STATEMENT
I hereby certify that I have the authority to make the foregoing application, that the application is correct, and that
the construction will conform to the regulations in the Building Code, the Unified Development Ordinance, Noblesville
Construction Standards, the Stormwater Ordinances and Stormwater Standards Manual, the approved Plans and
Specifications, IDEM requirements, any and all Local, County, and State requirements including private restrictions,
if any, which may be imposed on the above described property.
I further certify the modifications to the site and erection of a structure to be completed with this project will not cause
any adverse drainage condition that would cause damage to adjoining public or private property as a result of this
I understand that I have six (6) months to request my first building inspection, and no more than two (2) years to