D D
D D
D D D
D D D
I
I
D
I
D
I
I
I
I
Mechanical Permit Application
Community Development Department, Building Division
12725 SW Millikan Way / PO Box 4755
Beaverton, OR 97076
Phone: (503) 526-2403; Fax: (503) 526-2550
www.BeavertonOregon.gov/bib
OFFICE USE ONLY
Date Received: Permit No.:
Date Issued: By:
Payment Type:
TYPE OF WORK
New construction Addition/alteration/replacement
Demolition Other, Specify:
CATEGORY OF CONSTRUCTION
1- and 2-family dwelling Commercial/industrial Accessory building
Multi-family Master builder Other, Specify:
JOB SITE INFORMATION AND LOCATION
Job site address:
City/State/ZIP:
Suite/bldg./apt. no.: Project name:
Cross street/directions to job site:
Subdivision: Lot no.:
Tax map/parcel no.:
DESCRIPTION OF WORK
PROPERTY OWNER TENANT
Name:
Address:
City/State/ZIP:
Phone: Fax:
E-mail:
APPLICANT
Business name:
Contact name:
Address:
City/State/ZIP:
Phone: Fax:
E-mail:
CONTRACTOR
Business name:
Address:
City/State/ZIP:
Phone: Fax:
E-mail:
CCB lic.: City or metro lic.:
COMMERCIAL FEES
Mechanical permit fees are based on the value of the work performed. Indicate the
value (rounded to the nearest dollar) of all mechanical material
overhead, and profit.
Value: $
RESIDENTIAL EQUIPMENT / SYSTEMS FEES
For special information use checklist.
Furnace, incl. ductwork, vent, and liner
Duct work, alterations and additions
Gas heaters/unit in-wall, in-duct,
suspended, etc. not incl. vent.
Gas fireplace/insert/stove
Pool or spa heater, kiln*
Chimney/liner/flue/vent w/o appliance
Oil tanks/gas/diesel generators
Environmental exhaust and ventilation
Range hood/other kitchen equipment
Single-duct exhaust (bathrooms, toilet
compartments, utility rooms)
Whole house ventilation or Radon
mitigation
$14.15 for first four; $4.03 for each additional
Wall/suspended/unit heater
Fireplace/log lighter/gas log
MECHANICAL PERMIT FEES
Minimum permit fee
Plan review ( 25% of permit fee)
State surcharge (12% of permit fee)
This permit application expires if a permit is not obtained within 180 days
after it has been accepted as complete.
Authorized
signature:
* Site plan required for an outdoor unit
** State Building Codes Division’s approval required
Print name: Date:
Form B70-1003 REV 11/19
>>CLICK HERE TO DETERMINE IF A PLAN REVIEW IS REQUIRED<<
Total # of
fuel piping
outlets:
Total cost for
fuel piping
outlets:
CALCULATE MECHANICAL PERMIT FEES
Check for Plan Review (25% of permit fee)
1 - Site plan required for an outdoor unit.
2 - Requires approval from Building Codes Division.