Eligibility Checklist for Expedited Electric Vehicle Charging Station Permit:
Non-Residential Buildings and Facilities
Type of Charging Station(s) Power Levels (proposed circuit rating) Check one
Level 1
110/120 volt alternating current (VAC) at 15 or 20 Amps
Level 2 - 3.3 kilowatt (kW) (low)
208/240 VAC at 20 or 30 Amps
Level 2 6.6kW (medium)
208/240 VAC at 40 Amps
Level 2 9.6kW (high)
208/240 VAC at 50 Amps
Level 2 19.2kW (highest)
208/240 VAC at 100 Amps
Other (provide
detail):___________________
Provide rating:__________________________________
Permit Application Requirements:
A. Does the application include EVCS manufacturer's specs and installation guidelines?
Y
N
Electrical Load Calculation Worksheet:
A. Is an electrical load calculation worksheet included? (CEC 220)
Y
N
B. Based on the load calculation worksheet, is a new electrical service panel upgrade
required?
Y
N
1) If yes, do plans include the electrical service panel upgrade?
Y
N
C. Is the charging circuit appropriately sized for a continuous load of 125%?
Y
N
D. If charging equipment proposed is a Level 2 9.6 kW station with a circuit rating of 50
Amps or higher, is a completed circuit card with electrical calculations included with
the single line diagram?
Y
N
Site Plan and Single Line Drawing:
A. Is a site plan and separate electrical plan with a single-line diagram included
with the permit application?
Y
N
1) If mechanical ventilation requirements are triggered for indoor venting
requirements (CEC 625.29 (D)), is a mechanical plan included with the
permit application?
Y
N
B. Is the site plan fully dimensioned and drawn to scale?
Y
N
1) Showing location, size, and use of all structures
Y
N
2) Showing location of electrical panel to charging system
Y
N
3) Showing type of charging system and mounting
Y
N
Economic & Community Development Department
Building Division
213 E. Foothill Blvd. Azusa, CA 91702
626-812-5234 fax 626-334-5464
http://www.ci.azusa.ca.us
Compliance with the 2016 California Electrical Code
:
A. Does the plan include EVCS manufacturer's specs and installation guidelines?
Y
N
B. Does the electrical plan identify the amperage and location of existing electrical
service panel?
Y
N
1) If yes, does the existing panel schedule show room for additional breakers?
Y
N
C. Is the charging unit rated more than 60 amps or more than 150V to ground?
Y
N
1) If yes, are disconnecting means provided in a readily accessible location in line of
site and within 50’ of EVCS. (CEC 625.23)
Y
N
D. Does the charging equipment have a Nationally Recognized Testing Laboratory
(NRTL) approved listing mark? (UL 2202/UL 2200)
Y
N
E. If trenching is required, is the trenching detail called out?
Y
N
1) Is the trenching in compliance with electrical feeder requirements from structure
to structure? (CEC 225)
Y
N
2) Is the trenching in compliance with minimum cover requirements for wiring
methods or circuits? (18” for direct burial per CEC 300)
Y
N
Compliance with the 2016 California Green Building Standards Code (CGBSC):
A. Do the CAL Green EV Readiness installation requirements apply to this project?
Y
N
1) Do the plans demonstrate conformance with CGBSC Table 5.106.5.3.3 for the
minimum required number of charging spaces?
Y
N
2) Do the construction plans comply with the design requirements set forth in CGBSC
5.106.5.3.1 for single charging spaces or CGBSC 5.106.5.3.2 for multiple charging
spaces?
Y
N
Compliance with 2016 California Building Code, Chapter 11-B for Accessibility Features:
B. Do the plans clearly depict all required accessible EVCS features for the disabled?
Y
N
1) Do the plans identify the correct number and type of accessible EVCS stalls
required in accordance with Table 11B-228.3.2.1?
Y
N
2) Do the plans detail compliance with the accessible EVCS features required by 11B-
812 and Figure 11B-812.9?
Y
N
Notes: This criteria is intended for an expedited EVCS permitting process. If any items are
checked NO, please revise plans to fit within the eligibility checklist; otherwise the
permit application may go through the standard plan review and approval process.
Plan review commences the day after submittal with up to 3 business days for
qualifying expedited projects and up to 10 business days for all other EVCS projects.
Electrical plans shall be completed, stamped and signed by a California Licensed
Electrical Engineer or a C-10 electrical contractor.
Project Address: ______________________________________________________________________
Applicant Signature: __________________________________________________________________
Applicants Printed Name: _____________________________________________________________
Contractor’s License Number and type: _____________________ - _____________________
click to sign
signature
click to edit