Form B70-1029 Page 1 of 14 REV 4/15
FOR DETACHED SINGLE FAMILY DWELLINGS
Building Permit No. ____________________ Plans Examiner ____________________
Project Name: _______________________________
Job Address: ________________________________ Suite: __________________________________
Contractor: _________________________________ Phone: _________________________________
I, ___________________________________, Oregon Construction Contractors Board No. ______certify
THE PROPOSED INSTALLATION COMPLIES WITH Section 3111 of the Oregon Structural Installation
Specialty Code (OSSC) and the following is true and defines the scope of work for this project:
a) All work complies with the current state adopted Oregon Structural Installation Specialty Code and the
authority having jurisdiction.
b) All alterations to the roof have been sealed in an appropriate manner.
c) Inspections shall be requested and approvals obtained for all installations. Requests can be made at (503)
526-2400 or on line at www.beavertonoregon.gov/scheduleinspection.
Under the provisions of Section 105.2; construction documents shall not be required when an applicant
has demonstrated, on a form approved by the Building Official, that a proposed installation complies with
the requirements of Sections 3111.1 of the Structural Specialty Code.
Fire Fighter Access and Escape:
Section 3111.4.8 Fire Fighter Access and Escape. To provide access and
escape for Fire Fighters the location of roof-mounted PV modules shall comply
with the requirements of this section.
Section 3111.4.8.1 General Pathway Requirements. All PV installations shall
include a 36 inch wide (914mm) pathway maintained along three sides of the solar
roof. The bottom edge of a roof with a slope that exceeds 2:12 shall not be used as
a pathway. All pathways shall be located over a structurally supported area and
measured from edge of the roof and horizontal ridge to the solar array or any
portion thereof. To be provided.
Exception:
1. On structures with a PV array area of 1,000 square feet (92.9 m
2
) or less
installed on a roof with a slope that exceeds 2:12 and with an intersecting
adjacent roof and where no section is larger than 150 feet (45720 mm)
measured in length or width:
Meets exception
Does not apply
1.1. Where the PV array does not exceed 25% as measured in plan view of
total roof area of the structure, a minimum 12 inch (305 mm) unobstructed
pathway, shall be maintained along each side of any horizontal ridge.
Community Development Department
Building Division
12725 SW Millikan Way / PO Box 4755
Beaverton, OR 97076
Phone: (503) 526-2493 Fax: (503) 526-2550
General Information (503) 526-2222
BeavertonOregon.gov
PRESCRIPTIVE SOLAR PHOTOVOLTAIC SYSTEM INSTALLATION AFFIDAVIT