DEVELOPMENT GUIDE CASTROVILLE, TX
40
Commercial Permit Process Overview
Building permitting is the process through which the City ensures compliance with all codes and
ordinances, relative to the construction of buildings and building sites to safeguard the public
health, safety, and general welfare. The process includes submittal of building plans, issuance of
a building permit, inspections, and the issuance of a Certificate of Occupancy upon successful
completion of construction. This process is the same for all developments in the City of
Castroville.
New construction of, as well as additions and alterations to, structures used for nonresidential
purposes require a commercial building permit. Multi-family residential projects, including
duplexes, are also required to go through the commercial building permitting process.
Once a plat for a commercial or multi-family residential development project has been approved
by the City, a building permit may be sought. In some circumstances, the release of building
permits may require prior installation of public infrastructure (see preceding Chapter 4).
A complete building permit application must include two sets of printed building plans and one
electronic version, as well as a completed building permit application form and the required plan
review fee. Building permit applications can be made on any workday in the Community
Development Department office. Application forms are available on the Community
Development Department website at www.castrovilletx.gov/2367/Permits-and-Development. If
a property is located in a floodplain, a Floodplain Development Permit and Elevation Certificate
must also be submitted with the building permit application to ensure that the structure is built
at least one foot above the base flood elevation. See Chapter 4 for more information on
Floodplain Development Permits.
Commercial building plan review is ordinarily completed by the City’s third-party plan reviewer
within two to four weeks from the date of a submission, provided that plans are complete, and
no problems arise that might require a resubmission. Upon review and approval of the building
plans and payment of the required building permit fee and any associated utility fees, a building
permit is issued. Construction must begin within 180 days following the issuance of a building
permit. At least one building inspection must occur during each 180-day period following the
issuance of a building permit or the work will be considered abandoned. If the work is considered
abandoned, a new permit must be issued before work on a project can continue. Once all final
building inspections and approvals have been obtained from the City, the owner or tenant must
apply for and receive a Certificate of Occupancy before a new structure can be occupied.
The Community Development Department is your central point of contact during the building
permitting process. Contact Community Development at (830) 931-4090 to discuss building
permit requirements as they relate to your development project.
DEVELOPMENT GUIDE CASTROVILLE, TX
41
Commercial Permit Process Frequently Asked Questions
Under what conditions must I apply for a commercial building permit?
New construction of, as well as additions and alterations to, structures used for nonresidential
purposes require a commercial building permit. Any owner or authorized agent who intends to
construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or
structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas,
mechanical or plumbing system, the installation of which is regulated by the City of Castroville’s
codes, or to cause any such work to be done, shall first make application for a building permit.
Multi-family residential projects are also required to go through the commercial building
permitting process. Contact the Community Development Department at (830) 931-4090 to
discuss building permit requirements as they relate to your development project.
What building codes has the City of Castroville adopted?
The City of Castroville has adopted the following building codes:
2012 International Building Code
2012 International Plumbing Code
2012 International Property Maintenance Code
2014 National Electric Code
2012 International Existing Building Code
2012 Fuel and Gas Code
2012 Mechanical Code
2012 International Residential Code
2012 International Energy Conservation Code
2012 International Fire Code
Additional standards can be found in Chapter 22 of the City of Castroville Code of Ordinances
(Buildings and Building Regulation), available online at www.castrovilletx.gov.
What are the preliminary requirements for pursuing a commercial building permit?
Before applying for a commercial building permit, check to ensure that a development project
complies with all zoning and platting requirements discussed in Chapters 2 and 3 of this Guide.
What are building plan review submittal requirements?
Submit at least two hard copy complete sets of building plans, one electronic set of the building
plans, a permit application, and any applicable plan review fees. Contact Community
Development at (830) 931-4090 to discuss building permit requirements as they relate to your
development project.
Now that I have met all the zoning and platting requirements and I have submitted
the required paperwork for a building permit, what is my next step?
The Community Development Department will notify you whether your application has been
approved or denied, usually within two weeks following the submission of a complete
DEVELOPMENT GUIDE CASTROVILLE, TX
42
application. You may call Community Development at (830) 931-4090 for a status update at any
stage of the review process (during business hours).
When are fees required and how much are they?
Payment of the plan review fee is due at the time of building permit application submittal.
Building permit fees as well as any other associated utility fees are normally collected upon
issuance of the building permit. The fee amount is contingent on the valuation (cost of
construction) of the project that is being proposed. Contact the Community Development
Department at (830) 931-4090 to inquire about building permit fees.
When can I start building construction?
Building construction must begin within 180 days following of the issuance of a building permit.
The approved (signed) building permit, or a copy thereof, must be prominently displayed on the
job site throughout the building process until all final inspections have been approved. At least
one building inspection must occur during each 180-day period following the issuance of a
building permit or the work will be considered abandoned. If the work is considered abandoned,
a new permit must be issued (with new review and fees paid) before work on a project can
continue.
How do I request an inspection?
The City utilizes a third-party contracted inspection company, Bureau Veritas, to inspect
construction projects. Inspections related to building construction (building, plumbing,
mechanical, fire protection, and/or electrical) can be requested by contacting Bureau Veritas
directly at any of the following:
Phone: (817) 335-8111 or (Toll-Free) (877) 837-8775
Fax: (817) 335-8110 or (Toll-Free) (877) 837-8859
Email: inspectionstx@us.bureauveritas.com
The request must include the following information:
Project address
Inspection type requested
Permit number
Contractor’s name and contact information
Date inspection is to be performed
Any special instructions or requests for the inspector
Inspections received by Bureau Veritas by 5:00pm Monday-Friday (excluding Holidays) will be
scheduled for the next business day following the request. Fire protection inspections usually
take longer to schedule, so you should allow for three business days for those inspection
requests to be coordinated.
DEVELOPMENT GUIDE CASTROVILLE, TX
43
What inspections are required of my construction project and when are these
inspections being done?
The inspections required for your construction project varies with the complexity of a job.
Ordinarily, the City of Castroville performs its construction inspections in the following order:
Electrical Temporary Pole
Water Service
Yard Sewer
Gas Underground
Plumbing Rough in
Form Board Survey
Building Foundation Pre-Pour
Inspection
Electrical Rough in
Mechanical Rough in
Plumbing Top Out
Gas Rough in
Building Frame Inspection
Insulation Inspection
Electric Meter Inspection
Plumbing Final
Gas Final/Release
Electrical Final
Energy Final
Mechanical Final
Building Final/Certificate of
Occupancy Inspection
If Fire Alarms or Fire Sprinklers are
required, those inspections must be
completed prior to the issuance of a
Certificate of Occupancy.
Contact Community Development at (830) 931-4090 to discuss building permit requirements as
they relate to your development project.
When can I use and occupy my building?
Once all final inspections and approvals have been obtained from the City, the City will issue a
Certificate of Occupancy. Only after a Certificate of Occupancy has been issued can a building be
occupied.
If I am not at the site at the time the inspections are made, how will I know if the
work has been approved?
An inspection report will be left onsite of the work inspected. If you receive a partial pass or
failing inspection, contact the issuing inspector for information on what work needs to be done
to receive a passing inspection. After the work has been corrected, you must schedule a
reinspection.
Where can I find more information?
For more information on building permits, please refer to Community Development
Department’s webpage on the City’s website at www.castrovilletx.gov. Please contact the
Community Development Department at (830) 931-4090 if you have any questions concerning
the subjects discussed in this chapter.
DEVELOPMENT GUIDE CASTROVILLE, TX
44
Commercial Permit Process Checklist
Procedural
Have you met all the zoning and platting requirements?
Have you met with the Community Development Department about general requirements
for the building permit(s) you are seeking?
Submittal
Submit two hard copy sets and one electronic set of building plans for review by the
Community Development Department. Be sure your plans include the following:
1. Site Plan (property lines must be based on an accurate boundary survey)
a. The site plan must indicate the size and location of new construction and
existing structures on the site with distances from the construction to
property lines, easements, existing and proposed grades, and existing
and proposed utilities to include water, wastewater, electric and gas.
2. Parking lot Layout indicating size and number of parking spaces, ADA designated
spaces, aisle width(s), fire lanes, lighting, trees, and landscaping
3. Floor plans indicating means of egress, room sizes, intended use and design
occupant load calculations
4. Exterior elevations (must show exterior materials, proposed height above
adjacent grade, windows and doors, roof slopes, chimneys, and overhangs)
5. Door schedules, window schedules, hardware schedules
6. Construction details; interior elevations and interior finish schedules
7. Structural plans must include: foundation plans, roof and floor framing plans,
wall sections and details
8. Plumbing plans (including site plan, schedules, details)
9. Mechanical plans (including site plan, schedules, details)
10. Electrical plans (including site plan, schedules, details)
11. Certified Energy Compliance Report (IC3, ComCheck, etc.)
a. U.S. Department of Energy, www.energycodes.org
12. Asbestos Survey (for projects involving renovation, addition, demolition)
a. Texas Department of Health, Asbestos Program Branch [1-512-834-6600,
www.dshs.state.tx.us/asbestos]
13. Texas Department of Licensing and Regulation architectural barriers project
registration information
a. Texas Department of Licensing and Regulation [1-800-803-9202,
www.license.state.tx.us]
14. When fire rated assemblies are required, provide construction details,
specifications, or other pertinent information as applicable.
15. Signs and Fire Protection Systems require a separate permit.
DEVELOPMENT GUIDE CASTROVILLE, TX
45
Upon review and approval of the building plans, obtain building permit and begin
construction within 180 days.
Call in all inspections at (830) 931-4090; obtain passing inspection report prior to proceeding
to each phase of work.
Upon successful completion of construction (approval of all final inspections), obtain
Certificate of Occupancy from the City.
DEVELOPMENT GUIDE CASTROVILLE, TX
46
Commercial Permit Process - Flowchart
1. Pre-development
Meeting
2. Submit building plans
and building permit
application and pay plan
review fee.
No
Project requires permit
review and approval?
Yes
Project may proceed
without permit.
3. Plan review (usually
two to four weeks)
4. Building plan approval
No
Submit revisions
Yes
5. Building permit fee and
applicable utility fees
paid and permit issued
6. Construciton
inspections
7. Final inspections
8. Certificate of
Occupancy issued
DEVELOPMENT GUIDE CASTROVILLE, TX
47
Commercial Permit Process Forms
Continued on next pages
CITYOFCASTROVILLE
Little Alsace of Texas
Commercial Construction Permit Application
Building Permit # _________________ Valuation: $__________________
Project Address: _________________________________________________ Zoning: ______________________
IBC Construction Type: __________ IBC Use Group: __________ Design Occ. Load: ______________________
Project Description: New Construction | Remodel/Addition | Demolition | Signs/Signage
Plumbing | Mechanical | Electrical | Lawn Irrigation
Swimming Pool/Spa | Accessory Building | Other: ____________________________
Description of Work: ______________________________________________________________________________
Utilities Needed:
Water | Sewer | Electric | Gas | None
Project in Floodplain: No | Yes
If Yes, a Floodplain Development Permit is required.
Asbestos Detected:
No |
Yes If Yes, removal of asbestos material requires a licensed abatement contractor.
TDLR-AB Registration: No |
Yes If Yes, provide Registration Number: ________________________________
A
PPLICANT
Name:
________________________________________
Contact Person: ______________________________
Address: __________________________________________________________________________________________________
Phone Number:
___________________
Fax Number:
___________________
Email:
____________________________
P
ROPERTY
O
WNER
Name:
________________________________________
Contact Person: ______________________________
Address: __________________________________________________________________________________________________
Phone Number:
___________________
Fax Number:
___________________
Email:
____________________________
B
USINESS
O
WNER
Name:
________________________________________
Contact Person: ______________________________
Address: __________________________________________________________________________________________________
Phone Number:
___________________
Fax Number:
___________________
Email:
____________________________
Architect / Designer
Contact Person
Phone Number
Registration Number
Engineer
- CIV | STR | MEC | ELE | Other
Contact Person Phone Number
Engineer License Number
General Contractor
Contact Person Phone Number
Mechanical Contractor
Contact Person Phone Number Contractor License Number
Electrical Contractor
Contact Person Phone Number Contractor License Number
Plumber/Irrigator
Contact Person Phone Number Contractor License Number
City of Castroville Highway 90 Design Criteria may apply. A permit becomes null and void if work or construction authorized is not commenced within
180 days of the date of permit issuance, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is
commenced. All permits require one or more inspections.
A certificate of occupancy must be issued before any building is occupied.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances
governing this type of work will be complied with whether specified or not. No work may begin until proper permits are approved and all associated fees
have been paid.
Signature of Applicant: ___________________________________________ Date: ____________________
Phone:(830)9314090 703PARISSTREE
T
Fax:(830)9319186
CASTROVILLE,TEXAS78009
ForMultiFamily,Commercial,&IndustrialBuildings
click to sign
signature
click to edit
Castroville Community Phone: 830-931-4090
Development Department Fax: 830-931-9186
703 Paris St. www. castrovilletx.gov
Castroville, TX 78009 Page 1 of 2 Revised 10-09-2016
Castroville Community Development Department Commercial
Construction Permit Submittal Requirements
“Commercial Construction” means any construction for which a permit is required by City Ordinance that takes
place on a property that is not used for a One- or Two-Family residence. This includes, but is not limited to
properties used for multi-family residential (3 or more dwelling units), places of religious worship, educational,
retail, commercial, and industrial uses.
CONSTRUCTION DOCUMENT SUBMITTALS: THREE (3) hard-copies of the Required Drawings and Documents,
as indicated below, are required for plan review. An Electronic Copy (in .pdf format) may be substituted for one of the
required hard copies. Construction documents must be submitted along with a completed Commercial Construction
Permit Application. At the time of permit issuance, one set of construction documents will be returned to the applicant as
part of the permit packet (which must remain on the jobsite until all final inspections are approved).
Note: Drawings containing a label such as "not for construction", "for pricing only", or otherwise indicating that the plans
are not an official final set, will not be accepted for permit application.
PROFESSIONAL LICENSE: Each drawing and document shall be sealed, signed, dated and designed by a State of
Texas Registered Architect, Registered Engineer, Registered Interior Designer, where applicable as required by the State
of Texas Engineering and Architect Practice Act.
REQUIRED DRAWINGS AND DOCUMENTS: (The Castroville Community Development Department may require
additional information if necessary.)
Drawings must be drawn to scale, dimensioned and of sufficient clarity containing the following (as applicable):
1. Site Plan (property lines must be based on an accurate boundary survey)
[a]
2. Parking lot Layout indicating size and number of parking spaces, ADA designated spaces, Aisle width(s), Fire
Lanes, any lighting, trees, and landscaping
3. Floor plans indicating means of egress, room sizes and intended use and design occupant load calculations
4. Exterior elevations (must show exterior materials, proposed height above adjacent grade, windows and doors, roof
slopes, chimneys, and overhangs).
5. Door schedules, window schedules, hardware schedules
6. Construction details; interior elevations and interior finish schedules
7. Structural plans must include: foundation plans, roof and floor framing plans, wall sections and details
8. Plumbing plans (including site plan, schedules, details).
9. Mechanical plans (including site plan, schedules, details)
10. Electrical plans (including site plan, schedules, details)
11. Certified Energy Compliance Report (IC3, ComCheck, etc.)
[b]
12. Asbestos Survey (for projects involving renovation, addition, demolition)
[c]
13. Texas Department of Licensing and Regulation architectural barriers project registration information
[d]
14. When fire rated assemblies are required, provide construction details, specifications, or other pertinent
information as applicable.
15. Signs and Fire Protection Systems require a separate permit. See Sign Permit Submittal Requirements and Fire
Detection/Suppression System Permit Submittal Requirements information sheet.
NOTES:
a. The property must be platted in accordance with City Ordinance before a permit will be issued. The site plan
must indicate the size and location of new construction and existing structures on the site with distances from the
construction from lot lines and existing structures, easements, existing and proposed grades, and existing and
Castroville Community Phone: 830-931-4090
Development Department Fax: 830-931-9186
703 Paris St. www. castrovilletx.gov
Castroville, TX 78009 Page 2 of 2 Revised 10-09-2016
proposed utilities to include water, wastewater, electric and gas as applicable. Parking lot layout indicating
number and size of parking spaces, ADA parking designation, aisle width(s), approaches, and fire lanes must be
included as applicable to ensure compliance with off-street parking requirements & access.
b. U.S. Department of Energy, www.energycodes.org
c. Texas Department of Health, Asbestos Program Branch [1-512-834-6600, www.dshs.state.tx.us/asbestos]
d. Texas Department of Licensing and Regulation [1-800-803-9202, www.license.state.tx.us]
Typical Commercial Inspections
___ Temporary Power Pole
___ Yard Sewer
___ Water Service
___ Plumbing Rough
___ Gas Wrap
___ Customer Svc. Insp. Form
___ Foundation
___ Pier/Footing
___ Retaining Wall
___ Sprinkler/Double Check
___ Backflow
___ Framing
___ Plumbing Top-Out
___ Gas Rough Pressure Test
___ Mechanical Rough
___ Electrical Rough
___ Insulation (energy)
___ Drywall
___ Electrical Underground
___ Gas in Slab
___ Gas Underground
___ Grease Duct
___ Mechanical Underground
___ Tilt Panel
___ Grade Beam
___ Veneer
___ Slab Add On
___ Construction Electric
___ Gas Temporary
___ Gas Final
___ Mechanical Final
___ Plumbing Final
___ Electrical Final
___ Energy Final
___ Building Final
CITYOFCASTROVILLE
Little Alsace of Texas
Sign Permit Application
Building Permit # __________________ Valuation: $___________________
Project Address: _________________________________________________ Zoning: ______________________
Sign Location: On-Premise | Off-Premise: Business Site Address: __________________________________
Sign Illumination: Internal | External | Not Illuminated
Sign Type: ________________________________________________________________________________
Height & Area: Overall Height: _______________________ Total Sign Face Area: _______________________
Materials & Installation Description: _________________________________________________________________
_________________________________________________________________________________________________
Project in Floodplain
(Flood Zone A, AE, AE-FW)
? Yes | No
If "Yes", a Floodplain Development Permit is required.
Applicant Information
Name:
________________________________________
Contact Person: _____________________________
Address: _________________________________________________________________________________________________
Phone Number:
___________________
Fax Number:
___________________
Email:
__________________________
Building/Property Owner
Name:
________________________________________
Contact Person: _____________________________
Address: _________________________________________________________________________________________________
Phone Number:
_________________
Fax Number:
_________________
Email:
________________________
Business Owner Information
Name:
________________________________________
Contact Person: _____________________________
Address: _________________________________________________________________________________________________
Phone Number:
_________________
Fax Number:
_________________
Email:
________________________
Designer / Manufacturer
Contact Person
Phone Number
Engineer
- CIV | STR | MEC | ELE | Other
Contact Person Phone Number
Engineer License Number
General Contractor
Contact Person Phone Number
Electrical Contractor
Contact Person Phone Number
Contractor License Number
A permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or
abandoned for a period of 180 days at any time after work is commenced. All permits require final inspection.
A certificate of occupancy must be issued before any building is occupied.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances
governing this type of work will be complied with whether specified or not. The granting of a permit does not presume to give authority to violate or
cancel the provisions of any other state or local law regulating construction or the performance of construction. No work may begin until proper permits
are approved and all associated fees have been paid.
Signature of Applicant: ___________________________________________ Date: ____________________
Phone:(830)9314090 703PARISSTREE
T
Fax:(830)9319186
CASTROVILLE,TEXAS78009
City of Castroville
Utilities System
1209 Fiorella St
Castroville, TX 78009
P: (830) 931-4070
F: (830) 931-6373
Page 1 of 3
Commercial Utilities Application
Certificate of Occupancy Required
Date of Application
Service Start Date:
Account#:
Business Name:
Service Address:
City:
State:
Zip:
Mailing Address:
City:
State:
Zip:
Business Telephone#
Business Fax#:
Fed ID#
Business Owner’s Name:
Date of Birth:
Driver’s License#
State Issued:
Address:
City:
State:
Zip:
Telephone#:
Email Address:
New Connections Requested?
None all utilities existing
Water
Sewer
Gas
Electric Overhead
Electric Underground
Type of Trash Service:
Commercial
Commercial:
Garbage Type:
2CY Container
3CY Container
4CY Container
6 CY Container
8 CY Container
10 CY Container
Pickups:
1 / week
2 / week
For Office Use Only
Utility Fees
All new accounts require a deposit plus any associated fees. The deposit will be applied to your outstanding balance when
you close-out your account.
Deposit - Commercial
$500.00
New Connection Fees
Water
$
Electric
$
Impact Fee - Water
$
Gas
$
Sewer
$
Impact Fee - Sewer
$
TOTAL
$
I certify that the above information is accurate, and I agree to comply with the City of Castroville rules and regulations
stated in the City of Castroville Code of Ordinances.
Applicant’s Signature:
Date
City of Castroville
Utilities System
1209 Fiorella St
Castroville, TX 78009
P: (830) 931-4070
F: (830) 931-6373
Page 2 of 3
City of Castroville Utilities Fee Schedule
Fee Type
Amount
Utility Fees
Deposit - Residential
$150.00
Deposit - Commercial
$500.00
Re-Connect Fee
$50.00
Re-Read Fee
$5.00
Temporary Utility Service Connection Fee
$50.00
Misc. Water
Edwards Aquifer Authority (EAA)
$5.17/mo./account
Pass thru (Asset by EAA)
Water Tap Fee
3/4" Meter
$1,200.00
1" Meter
$1,350.00
1 1/2" Meter
$2,100.00
2" Meter
$2500 + actual cost
3" or Larger
$3500 + actual cost
Sewer Tap Fee
4 " Sewer Tap Fee
5' and above
$1,200
Below 5'
$2,200
Below 8' priced per foot
$200
6" Sewer Tap Fee
Cost to be determined by
Public Works
Electric Service
Electric Overhead w/ existing Transformer & Pole
$650 with100 ft. included
Electric Overhead Install 30' Pole with existing Transformer
$2,100 with 100 ft. included
Electric Overhead Install 45' Pole with existing Transformer
$2,700 with 100 ft. included
Electric Overhear Install Transformer & 30' Pole & 45' Pole
$6,500 with 100 ft. included
Electric Overhead Install 15 KVA OH Transformer on existing
Pole
$2,100 with 100 ft. included
Electric Overhead Install 37.5 KVA OH Transformer on existing
Pole
$2,500 with 100 ft. included
Electric Underground (Single)
$3,000 with 100 ft. included
Electric Underground with pad mount
$6,500 with 100 ft. included
Street Light Installation
$300.00
Gas Service
$1000 + actual cost
City of Castroville
Utilities System
1209 Fiorella St
Castroville, TX 78009
P: (830) 931-4070
F: (830) 931-6373
Page 3 of 3
City of Castroville Utilities Fee Schedule
Solid Waste
Service Fee - Residential
$2.00/mo.
Service Fee - Commercial
$2.50/mo.
Household Hazardous Waste - Residential
$.82/mo.
90 Gallon Recycling Cart - Residential
$3.00/mo.
Residential Garbage Collection
1/week Garbage & 1/week Recycle Collection
$20.95
Commercial & Industrial Containerized Service
Shops $ Professional (Light) 1-90 Gal Can
$23.71
Shops $ Professional (Medium) 2-90 Gal Can
$24.97
2 Cubic Yard Container - 1/week
$68.04
2 Cubic Yard Container - 2/week
$107.28
3 Cubic Yard Container - 1/week
$75.58
3 Cubic Yard Container - 2/week
$119.08
4 Cubic Yard Container - 1/week
$93.32
4 Cubic Yard Container - 2/week
$177.53
6 Cubic Yard Container - 1/week
$134.08
6 Cubic Yard Container - 2/week
$263.79
8 Cubic Yard Container - 1/week
$177.53
8 Cubic Yard Container - 2/week
$355.05
10 Cubic Yard Container - 1/week
$208.68
10 Cubic Yard Container - 2/week
$437.24
Extra Pickups
Available on regular service days only - all containers
$93.18
Lock Fee/Casters
$25.00
Rates for Roll Off Containers:
Delivery Fee
$153.00
Rental Fee (per day)
$6.12
20 Cubic Yard Container
$392.82
30 Cubic Yard Container
$428.15
40 Cubic Yard Container
$469.20
Please email the
completed application
to ce@cpsenergy.com
or call 210-353-4050
for mailing or delivery
instructions.
Gas Service Checklist
Instructions: Commercial Checklist for the City of Castroville TX
Checklist:
Load Sheet (Appliance Schedule)
Scaled Site Plan (PDF)
Location of Gas Meter to be clearly shown on design
Sealed Plans / Drawing (CAD or DGN)
Note: CPSEnergy Gas engineering to provide cost estimate to the City facilitator.
Customer Signature
CUSTOMER LOAD INFORMATION
GAS EQUIPMENT
Pressure Required BTU
FURNACE
BOILER
COOKING
WATER HEATER
POOL\SPA HEATER
GAS LIGHTING
OTHER EQUIPMENT
TOTAL
0
click to sign
signature
click to edit