D18/20330September2018
CHECKLIST FOR WOODFIRE
BUILDING CONSENT APPLICATIONS
How to use this Checklist
Use this checklist when finalising your plans and specifications to
assist you to lodge a complete
application and to avoid delays in processing. Your application will be accepted based on this
check list to ensure that it has sufficient information to commence processing.
All items on this checklist must be marked (
) to show that they are either provided or are not
applicable to your project.
Later additional information may be requested during the process
of
your building consent to
confirm compliance with the Building Code. Processing time will be suspended until all the
information is received.
Note: if application is electronic sent there will be a small for s
undries fee for printing application
out.
Please sign and date below once this form has been completed. This form must accompany
your application form.
Applicant Signature: D Date: ate:
Council BCO Signature:
ant Signature:
D Date: ate:
N/A 1 Check Items SDC
Check
a Have the Consent application fees been paid in full?
b Does it show what type of Consent has been applied for?
c Does it show what type of work is to be taken out?
d Does it list the address of where the building work will take place?
e Does it list who owns the building and land?
f Is the land over 2 hectares.
g Does it list who’s involved in the build?
N/A 2 Does the application have the following information below?
a Does the Floor Plan indicate where appliance will be installed, All
escape routes, windows for ventilation, smoke alarms within 3.0m of all
bedrooms?
b Specifications for fire place - please ensure that make and Model,
hearth and flue is highlighted if the specifications show more than one
model.
c Hearth requirements or plan of existing hearth showing size.
d Seismic restraints shown. (this information will be in the insulation
manual)
e Flue kit specifications provided.
f Flue height in relation to roof provided plan.
g Roof Flashing type and details.
h Is there Two copies.
N/A 3 If fire is to be fitted with a wetback
a Pipe layout plan from fire place to hot water cylinder shown.
b Valves and vents shown.
c Plumbers name and registration number provided.
D18/20330September2018
QUALITY FIRE VETTING CHECKLIST
Office Use Only
(circle appropriate)
Building category:
BC___________
Assigned Tech Check Officer by John Richmond is: ______________________________
Checking Officer Signature: ________________________ Date: _____________________
ITEM COMMENT
Is there a Conflict of interest? Y/N
Conflict of interest – any special measures required?
Give management reason in special notes section below.
Process in-house or outsource.
Give reason in special notes for out sourced below.
Other
Certificate of title: any red flags?
If yes give detail in notes section below
SPECIAL NOTES/ADDITIONAL COMMENTS:
Res 1 Com 1
Accepted / Rejected
Y / N
In-house / Outsource
Y / N
Y / N
Y / N
Tech lead / Nominated BCO
click to sign
signature
click to edit