Land Development Applications and Required Documentation
Application Type: Subdivision
Pre-application Conference
Required documents: Application, Authorization to Act (optional), Plans (2 copies), Concurrency**, Zoning
Form LDD 99, Fees
Engineering & Pre-Plat
Required documents: Application, Cover (Response) letter*, Plans (2 copies), Topo & Boundary Survey (2
copies), Drainage Calculations (2 copies), Traffic Impact Analysis (2 copies - if required), Tree Survey or aerials
(2 copies), Title Opinion/Encumbrance Report, Fees
Pre-Plat – Site Plan Only
Required documents: Application, Cover letter, Plans (2 copies), Topo & Boundary Survey (2 copies), Title
Opinion/Encumbrance Report, Fees
Construction Permit
Final approval request for Site Plans, or Pre-Construction Permits for Subdivisions and Unpaved Roads must
also be accompanied by all Federal, State, and Local permits, such as SJRWMD, and FDEP. If the project is
phased, please submit a key map reflecting which phase you are constructing.
Required documents: Cover letter***, Plans (8 copies), Engineering cost estimate & LDD 108, NPDES Forms
(over 1 acre), Fees
Replats/Minor Subdivisions
Required documents: Application, Cover letter, Authorization to Act (optional), Plans (2 copies), Topo &
Boundary Survey (2 copies), Concurrency**, Zoning Form LDD 99, Title Opinion/Encumbrance Report, Fees
Final Plat
Required documents: Application, Cover (Response) letter*, Plans (2 copies), Topo & Boundary Survey (2
copies), Title Opinion/Encumbrance Report, Fees
Plat Recording Documents
Required documents: Title Opinion/Encumbrance Report, Mylars, bonds, joinders, etc., Fees
* Cover letter providing a written response to staff comments, listing and addressing each of the items shown
as a deficiency on the previous review.
** If the project increases in density or intensity from the initial proposal during any stage in the development
approval process, a new concurrency evaluation will be required. A new form will be required if concurrency
approval expires.
*** Cover letter requesting pre-construction conference and a copy of the notice of intent (NOI) submitted to
FDEP and the corresponding executed SWPPP must be submitted.
APPLICATION FEES: A schedule of fees and charges is established and adopted by the Board of County
Commissioners of Brevard County, Florida, and may, from time to time, be amended.