Taps, Services, and Meters
Meters (size in inches)
Existing meter size: _____ New meter size: _____ Fire meter size: _____
Sub-meter size: _____ Hydrant meter on private property: _____
(Must be related to construction activity. A meter deposit is required.)
Taps (size in inches)
Existing tap size: Water: _____ Sewer: _____ Fire: _____
New tap size: Water: _____ Sewer: _____ Fire: _____
Services (size in inches)
Replacement water service: _____ Length: _____
Replacement sewer line: _____ Length: _____
New water service: _____ Length: _____
New sewer line: _____ Length: _____
New connection, repair, or replacement material
Water connection material: _______________________________________ Length: _________ ft.
Sewer connection material: _______________________________________ Length: _________ ft.
I hereby certify that I have the authority to make the foregoing application, that the application is correct, and that the construction
shall conform to the Rockville City Code, and all other codes and regulations or private building restrictions, if any, which may be
imposed on the above property by deed. The granting of a permit does not presume to give authority to violate or cancel the
provisions of any other state or local law regulating construction or the performance of construction. I have read and understand the
Permit Conditions available from the Inspection Services Division.
FEES ARE NON-REFUNDABLE
• All persons who perform taps on City property must hold a WSSC tap license: A separate permit must be obtained from the City
of Rockville Public Works Department for all work within the City of Rockville right-of-way.
• A water and sewer location card must be completed and provided to the plumbing inspector at the time of inspection for all new
and replacement water services and sewer lines.
• Homeowners are prohibited from installing water or sewer laterals, and meter settings.
• The Master Plumber listed on the permit application, or authorized representative of the Master Plumber, must install all meters.
• Permit will expire 6 months after issuance if no inspections have been made and the work covered by the issued permit has not
started. Request for permit extensions must be made prior to the permit expiration date indicated on your permit. Expired
permits cannot be re activated.
• No work is to be covered or otherwise concealed without inspection.
Revised 07/08/11