Form1204(4.3.20)
PermitNo.
_________
CITYOFBRIDGEPORT,BUILDINGDEPARMENT
APPLICATIONFORSIGNPERMIT
Date_____________
Toerecta sign On Street
Sizeofsign OwnerofLand
OwnerofSign Owner’sestimateofvalue
SignErector Address
SignErectorPhone Email
CommoncouncilApproval
ApprovedBy R. No SignFee:
Theundersignedherebymakesapplicationforapermitfortheerectionofasignassetforthintheaccompanying
drawingsandspecificationshowingconstructionandmethodoferectionasrequiredbytheBuildingDepartment.
Ifhungonwallsofbuildinggivethicknessandmaterialofsame
Ifonaroof,giveconstructionofroof
Constructionofsign
Locationofsign(Streetandnumber)
(Owner's)(Agent's)Signature
Address
Signcontractor
Address
TYPEOFSIGN
GroundSignRoofSignWallSignMetalBoxElectricMarqueeChannelLetters
Lengthofsign Height Weight
Maximumheightofsignfromtheground
Isilluminatedsignlisted builtwithlistedcomponents
CONSTRUCTION
Metal Wood PlasticwithMetalFrame
METHODOFERECTION,BRACES,ETC.
Sizeofangleorflatirons chains,cablesorsignhooks
Lagbolts,etc. size,length&spacing
Remarks
HOLDHARMLESS/RELEASE
CityofBridgeportandBridgeportBuildingDepartmentrequirethatpermitteeshallindemnifyandholdharmless"City/Department",itsemployees
andagentsandreleasebothfromanyandallclaimsonactionsbroughtbythirdpartiesforinjuriesordamagesofpropertyinconnectionwith
grantingofthispermitandworktobeperformedthereunder.Permitteemayberequiredtoinsureagainstsuchclaimsinamountsappropriateto
meetsuchobligation.City/Departmentshallhavetherighttoreviewandspecifysuchamountandscopeofcoverageasitmaydeemappropriate
foractivitiesconductedunderthispermit.
SignatureofOwner/Lessee
SignatureofContractor