Approved copy of the applicable manufacturer’s installation requirements shall be on the jobsite at time of
inspection.
I , as the contractor/owner/builder, attest the work to be
performed at will comply with the current Florida Building Code
as well as established standards for performance of products and materials set forth by the product approval
guidelines as required by Florida Statutes.
I understand that information and approval numbers of the building components will be required to be
available to the building inspector on the jobsite at time of inspection. Including but not limited to:
1. Sealed plans
2. The performance characteristics which the product was tested and certified to comply with
3. Copy of product approval information
4. Copy of the applicable manufacturer’s installation requirements
Further, I understand that any installed products may have to be removed if approval cannot be
demonstrated during inspection. The above information must be provided for the building components listed below:
1. Exterior Doors
2. Windows Note: FBC: Florida Building Code, Chapter 10, Section 1026.2 (If bedroom windows are to be
replaced the city will inspect for emergency egress)
a. Sill height shall not exceed 44 inches above the floor
b. Minimum net clear opening shall be 5.7 square feet; exception – grade level windows may have a
minimum clear opening of 5 square feet.
c. Minimum net clear opening height shall be 24 inches
d. Minimum net clear opening width shall be 20 inches
3. Roofing Products
4. Shutters
5. Skylights
6. Structure Components
7. New exterior Envelope product
8. H.V.A.C. Stand
STATE OF FLORIDA, COUNTY OF VOLUSIA
The foregoing instrument was acknowledged before me this day of , 20 ,
by _________________________________________________________ who is personally known to
me or who has produced ________________________________________ as identification.