TYPE OF NOTIFICATION:
original
demolition
renovation
cancellation
revision
ordered demolition
annual
Check Type of Project Below:
(Check all that apply.)
Friable School Project
Non-Friable School Floor Tile Project
Commercial Public Building (Friable & Non-Friable)
Revised by:
Contractor
Owner
Project Designer #of times revised: List Section #’s being revised:
1. FACILITY INFORMATION:
Facility name: School Bldg ID:
Location of Asbestos Containing Material (ACM) in Structure:
Bldg Size: Sq.Ft.: #Flrs: Age: Present Use:
Prior Use: Future Use (demo):
Address: City: County: Zip:
Contact: Phone:
2. FACILITY OWNER OR SCHOOL DISTRICT: (Tip: Complete for all projects Commercial/Public or Schools)
Facility Owner Name:
Address: City: State: Zip:
Contact: Email: Phone:
Copies of abatement permission and written verification certification to all building occupants and users from the building owner or school board shall be
submitted for IDPH public and private school facilities as required by Section 855.350 of the IDPH Asbestos Code.
3. ASBESTOS CONTRACTOR NAME: ID#:
Address: City: State: Zip:
Contact: Email: Phone:
4. DEMOLITION CONTRACTOR NAME:
Address: City: State: Zip:
Contact: Email: Phone:
5. ABATEMENT INFORMATION: Is Asbestos Present?
Yes
No
Description of Planned Demolition or Renovation Work and Methods to be Employed Including Demolition or Renovation Techniques:
Description of Work Practice(s) and Engineering Controls used to Prevent Emissions at the Demolition or Renovation Site:
6. QUANTITIES:
Pipes (Ln. Ft.):
Surface Area (Sq. Ft.):
Volume (Cu. Ft.):
Tip: CAT I non-friable ACM are asbestos-containing resilient floor coverings (vinyl asbestos tile (VAT), asphalt roofing products, packing and gaskets. All other non-friable
ACM are considered CAT II non-friable ACM. (RACM) is (a) friable asbestos material, (b) Category I non-friable ACM that has become friable, (c) Category I non-friable
ACM that will be or has been subjected to sanding, grinding, cutting or abrading, or (d) Category II non-friable ACM that has a high probability of becoming or has become
crumbled, pulverized or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations.
7.
ABATEMENTSTART DATE:
Finish Date: Work hours: AM
PM
AM
PM
AND/OR DEMOLITION START DATE:
Finish Date: Work hours: AM
PM
AM
PM
Working Weekends?
Yes
No Working Evenings?
Yes
No
Tip: Ten day notification requires at minimum, ten (10) working days (Monday-Friday including holidays) prior to the commencement date. Ten days begin with the US
postmark date or date received in office by commercial services or hand delivery. IEPA and City of Chicago cannot accept faxed copies, however, IDPH will accept
faxed submissions. Phased projects will not be accepted.
STATE OF ILLINOIS DEMOLITION/RENOVATION/ASBESTOS PROJECT NOTIFICATION FORM
Regulated Asbestos Non-friable asbestos not to Non-friable asbestos
Containing Material to be removed (demolition) to be removed TOTAL ASBESTOS
be removed (RACM) CAT I CAT II CAT I CAT II TO BE REMOVED
IL532-1296 APC 430 Rev. 8/2018
Date:
Illinois E-Pay Authorization Code:
Environmental Protection Agency (IEPA): Projects of at least 160 sq./ft or
260 linear ft., or 1 cubic meter and all demolition projects shall be submitted
to IEPA.This form shall be submitted for all original notifications and
revisions to IEPA ($150) Attach Illinois E-Pay receipt if paid electronically.
Illinois Department of Public Health (IDPH): Abatement projects greater
than 3 sq./ft and or 3 linear ft. up to 160 sq.ft or 260 linear feet and all
school projects shall be submitted to IDPH. This form shall be submitted for
all original notifications and revisions to IDPH (no fee).
Cook County (excluding the City of Chicago):
The Department of Environment and Sustainability no longer accepts paper
notifications. Visit: www.cookcountyil.gov/agency/environmental-control
for
electronic submission of notifications.
City of Chicago: All projects in the City of Chicago, except residential
renovations in buildings with fewer than two dwelling units, must notify the
City & IEPA if applicable. This form and appropriate fee shall be submitted
for all notifications to the City of Chicago (see bottom pg 2 for fee amount).
Copies of this form may be found at: www.ildceo.net/enviro
8. PROJECT DESIGNER ID#: 100- Name:
Complete Project Designer Name and License ID# if this project was designed by a Designer.
9. INSPECTOR ID#: 100- Name:
Tip: If procedure utilized is visual inspection, the inspector ID# must be provided.
10. PROCEDURE, INCLUDING ANALYTICAL METHOD, USED TO DETECT THE PRESENCE OF ASBESTOS
Name of Analytical Testing Laboratory:
11. ASBESTOS PROJECT MANAGER ID#: 100- Name:
12. AIR SAMPLING PROFESSIONAL ID#: 100- Name:
13. DISPOSAL SITE/LANDFILL NAME:
Address: Contact:
City: State: Zip: Phone:
14. WASTE TRANSPORTER/NAME:
Address: Contact:
City: State: Zip: Phone:
15. IS DEMOLITION ORDERED BY A GOVERNMENT AGENCY?
Yes
No
(If yes, a signed copy of Order must be attached.)
Government representative ordering the activity:
Title: Date of Order: Order Demolition Date:
16. FOR EMERGENCY RENOVATION:
Date and hour of emergency (mm/dd/yy): AM
PM
Describe sudden unplanned event. (example: boiler explosion) Explain how the event caused unsafe conditions or would cause equipment
failure or an unreasonable financial burden.
17. Description of procedures to be followed in the event that unexpected asbestos is found or previously non-friable asbestos
material becomes crumbled, pulverized or reduced to powder.
I certify that at least one representative trained in the provisions of 40 CFR Part 61, Subpart M, shall be on site during demolition or
renovation, having in his or her possession for inspection, evidence that the requisite training has been accomplished.
CERTIFICATE#
_____________________ NAMEOFTRAININGCOURSE __________________________________________
I certify the above information is correct.
____________________________________________________________________ _______________________
Signature of Demolition/Abatement Contractor or the Owner Date
Any person who knowingly makes a false, fictitious, or fraudulent material statement, orally or in writing, to the Illinois EPA commits a
Class 4 felony. A second or subsequent offense after conviction is a Class 3 felony. (415 ILCS 5/44(h)).
Tip: All notification forms must be hand signed and dated. Hand stamps are not acceptable. IEPA and Cook County require original signatures on their notification forms. IDPH will
accept photocopies. All notifications submitted to IEPA and City of Chicago must be accompanied by the appropriate fee. There is no fee for notification to IDPH.
For Cook County Departmental Use Only.
Date Received CCDES: Post Mark Date: Input Into Computer:
Inspection Fee Received: Inspection Priority: Top
High
Low
Must be Inspected:
Date(s) of Inspections:
Inspection Report Attached: Yes
No
Violation Copies Attached: Yes
No
Printed by the Authority of the State of Illinois W.O. #19-008 8/18 IOCI19-101
The Illinois EPA is authorized to require, and you shall disclose, the information requested on this Agency form utilizing this form pursuant to the Illinois Environmental Protection Act (Act), 415 ILCS 5.
Failure to disclose the requisite information on this Agency form may result in your notification being denied, and/or penalties being imposed as provided for in the Act, 415 ILCS 5/42-45.
IL Environmental Protection Agency
P.O. Box 19276 MC 41
1021 N. Grand Ave East
Springfield, IL 62794-9276
$150 fee (Attach payment or Illinois
E-Pay receipt if paid electronically.)
IL Department of Public Health
525 W. Jefferson St.
Springfield, IL 62761
(FAX: 217-785-5897)
Email: DPH.Asbestos@illinois.gov
Cook County Department of Environment & Sustainability
no longer accepts the combined form and all notifications
must be filed with the Department at the web address below.
www.cookcountyil.gov/agency/environmental-control
Submit this form
to the appropriate
agencies:
www.ildceo.net/enviro
Chicago Department of Public Health
Permitting and Inspections
333 S. State St., Room 200
Chicago, IL 60604
Fees apply as follows:
Residential Unit with less than 4 units . . . $300.00**
Residential Units with 4 units or more . . . $450.00
Commercial/Industrial facilities. . . . . . . . . $600.00
** except that asbestos abatement in residential buildings with fewer than
two dwelling units are not subject to the notice and fee requirements.