MCDOT APPROVAL REQUIRED
____ First Review? ____ Date Change? ____ Resubmittal? ____ Arterial Roadway Closure? ____ Annual Emergency Permit? ____ Annual Maintenance Permit?
Please Provide The Required Information
MCDOT Permit #: TC- _____________________Date: __________________ MCDOT Inspector Name/Area: ________________________ Page 1 of ________
Work Location (Address or Intersection): _______________________________________________ Main Cross Roads: _________________________________________________
Map Page (if known): _________ Section (if known): Township: Range:_______ Direction of Travel affected: ___ NB ___ SB ___ EB ___ WB ____ Road Closure
Contractor: __________________________________________________ Barricade Co.: _____________________________
Office Phone: ___________________ Fax: ___________________ Office Phone: ___________________ Fax: ____________________
On Site 24 Hour Contact Name: _________________________________ 24 Hour Name: ________________________________ Phone: _________________
On Site Mobile Phone: ___________________ Barricade Co. Email: ___________________________________________________
On Site Contact Email: ________________________________________
Project Start Date: ___________ End Date: ___________ Permit Expiration Date: ___________ Extended On: ___________ Extended To: ___________
Other Notes:
MCDOT Permit, Construction, and Inspection Division
Permit TCP Submittal Form
Maricopa County Department of Transportation
2901 W. Durango St, Phoenix AZ 85009
TCP Office Phone: 602-506-4625
Email: DOTTCPS@maricopa.gov
FAX: 602-506-1021
MCDOT General Notes:
1. Two (2) working days’ notice is required for all Traffic Control Plan Reviews.
2. Steel Plate (W8-24) signs Shall be installed for all steel plates in the roadway. Steel plates Shall be flush with the surface.
3. The contractor Shall maintain shoulder Diversions / Detours for dust control and a safe drivable surface at all times.
4. Any shoulder detour longer than 5 days Shall be paved 3" asphalt on native. All construction signs and barricades Shall be lighted for overnight use
5. Open trench signs Shall be installed for any open trench or pit excavation.
6. Traffic control flaggers Shall be certified, properly equipped and use slow/stop paddles not flags.
7. The contractor Shall assist in the passage of any legal over-width vehicle through their construction zone.
8. Advance warning signs for Collector and Arterial roads Shall be 48” x 48” and mounted on spring stands.
Maricopa County Full Closure Requirements: “ON SITE PRE-CONSTRUCTION MEETING REQUIRED”
1. Traffic control inspector must survey the location to determine if a full closure is necessary (This must be done prior to placing signage to show closure).
2. Letter from registered civil engineer stating why road must be closed (No other physical way to perform work).
3. Documentation of the names and numbers of the departments notified (Fire, Police, Municipal Bus Routes, Trash, School District & any Businesses in the area) Shall be provided to MCDOT.
4. Hotline number Shall be placed on signs sending 24-hour complaints to the contractor / permittee - NOT MCDOT.
5. Variable Message Sign or Static board showing the duration of the closure. (A minimum of Two (2) weeks advance notice of An approved
closure for arterial roads.)
Attach TCP Plans
Submit Form