300
Incomplete applications cannot be processed
Legal Description:
Lot: Block: Section: Subdivision:
Type of Work:
Residential
□
Commercial
□ Other
New
□ Addition □
Alter / Repair
□
Describe work to be done:
Owner:
Street: Street:
City, State, Zip: City, State, Zip:
Phone No. : Phone No.:
E-Mail: E-Mail:
Electrical Fees
Cost Per:
Quantity:
Provided Documents:
Scheduled Base Fee: $35.00
Plans
□
$25.00
Equipment Specs.
□
1-Pole Circuit (Each): $5.00
□
2-Pole Circuit (Each): $10.00
□
3-Pole Circuit (Each): $15.00
□
T-Pole (Each): $25.00
Temporary Cut In (TCI): $25.00
Transformer (Per KVA): $2.50
See Second Page for Calculation, If Applicable
Total:
APPLICANT'S SIGNATURE
Printed Name:
Phone No.:
Additional Comments:
Fax No.:
E-Mail:
Initial Review
By: Date:
Approved
By: Date:
BUILDING DEPARTMENT Page 1 of 2 Revised: November. 1, 2019
Electrical
Permit Application
Phone: 281-291-5669 Fax: 281-291-8364
1100 Red Bluff Rd. Seabrook, TX 77586 E-Mail: Permits@seabrooktx.gov
Seabrook TX, 77586
Failure to obtain a permit prior to commencement of work may lead to the doubling of permit fees
Work may not commence prior to payment and pick up of this permit.
Fees Revised per Ordinance 2017-11
(Check Box )
Permit No.:
Estimated Project Value :
Project Address:
Date Issued:
:______________________
Commercial Inspection Fee:
Electrical Amendments Per Ordinance: 2017-26
(1) Minimum conductor size of all light and power circuits greater than 100 volts shall be no
less than 12 AWG.
(2) No Aluminum Conductor smaller than 2/0 shall be used in the city.
(3) Armor Cable (Type A/C without an individual grounding conductor is prohibited.
(4) An accessible means of service disconnect shall be provided at the exterior of all
buildings or facilities, directly next to the service meter or entry of the service
conductors.
Grey Boxes for Office Use Only
Electrical
Contractor:
Submit (1) Digital or (1) paper copy of each
along with this filled out permit application
NOTICE: I HEREBY CERTIFY THAT I HAVE READ AND
EXAMINED THIS APPLICATION AND KNOW THE SAME
TO BE TRUE AND CORRECT. ALL PROVISIONS OF
LAWS AND ORDINANCES GOVERNING THE TYPE OF
WORK WILL BE COMPLIED WITH, WHETHER
SPECIFIED OR NOT. THE GRANTING OF A PERMIT
DOES NOT PRESUME TO GIVE AUTHORITY TO
VIOLATE OR CANCEL THE PROVISIONS OF ANY
OTHER STATE OR LOCAL LAW REGULATING
CONSTRUCTION OR THE PERFORMANCE OF
CONSTRUCTION.
For Commercial Inspection Fee:
Meter Loop / Service (Each):
click to sign
signature
click to edit