guidelines | form 2sf: solid fuel heating appliance | version: 22 | issued: 1 july 2019 | page i of i
Guidelines
Applicant copy
Please detach this page and keep for your reference.
1. Plans – one copy
All plans shall be drawn in black ink. All plans should have text
thatisclearandreadable.Plansmustshowthecompleteoor
layout of the house. This shall include the location of the solid
fuel appliance, windows, doors, and smoke alarms.
2. Installation instructions – one copy
The installation instructions are to be provided for the make
and model of solid fuel heater appliance that is being installed.
This will show the clearances required by the manufacturer for
that appliance.
3. Other documents
Attach any Producer Statement applications. Original copies
only will be accepted and they must be completed in full.
4. Fees and charges
The cost of this application will be due for payment at the time
of lodgement. This will be the only fee charged unless the
application and/or development differs from that originally
represented or assessed in which case additional fees will be
charged.
5. Claim and confidentiality
PleasediscusswithaCouncilOfcerifthereisanyclaim
forcondentialityofaplanorspecicationtosafeguardits
copyright or because of any requirements of the owner relating
tothesecurityofthebuilding.Inpractice,condentialityrarely
applies to private residences.
6. Wetbacks
If this application includes a wetback installation, to ensure that
theplumbingttingsandxturesareinaccordancewiththe
NewZealandBuildingCode,thebuildingofcialswillprocess
the application.
7. Documentation required on completion of
installation
When the appliance has been installed, documentation
required by Tararua District Council is as follows:
a. ApplicationforCodeComplianceCerticate
b. Either a Producer Statement/Construction from the
Installation Technician (ps3), or proof that Council
undertook inspection(s)
c. If a wetback was installed, a Producer Statement –
Construction from the Plumber (ps3), or proof that
Council undertook inspection(s)
8. Smoke detector(s)
Smoke detector(s) are to be installed in accordance with
f7 Clause 3.1 of the NZ Building Code before the Code
ComplianceCerticateisissued.
9. Installation
Thereappliance(s)shallbeinstalledtomanufacturers
specications.
Please Note: Some information from this application form is deemed public information and may be used by third parties.