FILTERINGPRACTICES:O&MCHECKLIST–VirginiaStormwaterManagementHandbook,Chapter9‐C.13.0.
InspectionDate
Project SitePlan/PermitNumber
Location DateBMPPlacedinService
DateofLastInspectionInspector
Owner/Owner’sRepresentative
As‐BuiltPlansavailable: Y/N
FacilityType:Level1____________________________Level2
FacilityLo
cation:
Surface
Underground
FiltrationMedia:
Nofiltration(e.g.,drywell,
permeablepavement,infiltration
facility,etc.
Sand
BioretentionSoil
Peat
Other:__________________
HydraulicConfiguration:
On‐linefacility
Off‐linefacility
TypeofPre‐TreatmentFacility:
Sedimentforebay(aboveground)
Sedimenta
tionchamber
Plungepool
Stonediaphragm
Grassfilterstrip
Grasschannel
Other:___________________
An inspection and clean‐up should be scheduledannuallytoremovetrashand floatablesthataccumulateinthe
pre‐treatment cells and filter bed. Frequent sediment cleanouts in the dry and wet s
edimentation chambers are
recommendedevery2‐3yearstomaintainthefunctionandperformanceofthefilter.Ifthefiltertreatsrunofffrom
ahotspot,crewsmayneedtotestthefilterbedmediabeforedisposingofthemediaandtrappedpollutants.Ifthe
filter does not treat runoff from a hotsp
ot, the media can be safely disposed by either land application or land
filling,withoutpriortesting.
Warning: If the filtering facility has a watertight cover; be careful regarding the possibility of flammable gases
withinthefacility.Careshouldbetakenlightingamatchorsmokingwhileinspectingfacilitiesthatarenotvented.
If the filtering facility is in a completely enclosed vault
, the OSHA Confined Space Entry procedures must be
followed.