FINAL REPORT OF SPECIAL INSPECTIONS
Project: ________________________________________________ Application No.: __________________
Project location: _________________________________________________________________________
Project Owner: __________________________________________________________________________
Address: _________________________________________________________________________
SC Registered Design
Professional in Responsible Charge: _________________________________________________________
Firm (optional): __________________________________________________________________________
License No.: SC_________________ Phone: _______________________ Fax: ______________________
Address: ________________________________________________________________________________
To the best of my information, knowledge, and belief, the Special Inspections and/or Testing required for this
project, and designated for this Agent in the Statement of Special Inspections submitted for permit, have
been completed in accordance with the contract documents.
F
ield reports submitted prior to this Final Report of Inspections form a basis for, and are to be considered an
integral part of this Final Report. All discrepancies that were outstanding in all of the Field reports have been
corrected.
P
repared by:
________________________________________
Type or print name
________________________________________
Firm (optional)
________________________________________
Signature Date
Individuals Seal
Firm Seal
City of Greenville
Page 1
SCDLLR QUALIFICATION REQUIREMENTS FOR SPECIAL INSPECTORS
Any individual offering to perform special inspections or testing shall submit a registration or license issued
by the South Carolina Building Codes Council, the South Carolina Board of Architectural Examiners or the
South Carolina Board of Professional Engineers and Land Surveyors, for approval by the building official.
E
xcept for professional engineers and architects registered in the State of South Carolina, special inspectors
shall meet the following criteria. Work experience shall be related to the field for which the inspector is being
qualified and may be obtained by for an engineering firm specializing in the field in which registration is being
sought.
A
n individual shall meet a minimum of one of the requirements identified bellow, for each category in which
approval is sought.
R
einforced Concrete (RC)
(A) Current International Code Council (ICC) Reinforced Concrete Special Inspector, or,
(B
) E
ngineer in Training (EIT) with one year related experience under supervision of a Licensed PE
P
restressed Concrete (PC)
Pretension Tendons (PC1)
(A) Current ICC Prestressed Concrete Special Inspector Certificati
on
(B) E
IT with one year related experience including plan reading under supervision of a Licensed PE
Post-Tension Tendons (PC2)
(A) Current Post-Tensioning Institute (PTI) Certification Level
1
P
ost-Tension Slabs-on-Ground (PTS)
(A) Current PTI Certification Level
1
W
elding (SW)
(A) Current American Welding Society (AWS) Certified Welding Inspector
(B
) C
urrent Canadian Welding Bureau Certified Welding Inspector
N
ondestructive Testing of Welds (SN)
(A) Current Nondestructive Testing Level II and/or Level III (MT, PT & UT)
(1) The applicant must be Level II certified by the American Society of Nondestructive Testing (ASNT) to
perform Magnetic Particle Testing (MT) Liquid Penetrant Testing (PT) and Ultrasonic Testing (UT), or
(2) The applicant must be Level II certified by an ASNT Level III examiner to perform MT, PT and UT.
The Level III examiner shall be certified by ASNT and must submit a copy of his certification with the Level II
certification.
Hi
gh-Strength Bolting/ Steel Frame (SS)
(A) Current ICC Structural Steel and Bolting Special Inspector
S
tructural Masonry (SM)
(A) EIT with one year related experience including plan reading under supervision of a Licensed PE
(B) Current ICC Structural Masonry Special Inspection
S
prayed Fire-Resistant Materials (FP)
(A) Current ICC Spray-Applied Fireproofing Special Inspector
City of Greenville
Page 2
Deep Foundations (PDP)
(A) Current National Institute for Certification in Engineering Technologies (NICET) Level II certification in
geotechnical engineering technology/construction
(B) EIT with one year related experience under supervision of a Licensed PE
(C) Current SCDOT Foundation Inspector Certification
Excavation and Filling (EF)/Verification of Soils (VS)
(A) Current NICET Level II certification in geotechnical engineering technology/construction
(B) Current NICET Level II in Soils
(C) EIT with one year related experience under supervision of a Licensed PE
(D) Soils Special Inspector
(E) Current SCDOT Earthwork, Drainage and Base Certification
Modular Retaining Walls (MRW)
(A) EIT with one year related experience under supervision of a Licensed PE
Precast Concrete Erection (PCE) (Not a separate registration)
The special inspector shall be registered for Reinforced Concrete (RC) or Welding (SW) as required based
on the type of inspection being performed.
Exterior Insulation and Finish System (EIFS)
(A)EIT with one year related experience
Smoke Control (SC)
(A) Current NICET N-II-FPAS
(B) Current NICET N-II-FPFA
(C) Current National Environmental Balancing Bureau
(D) Current Associated Air Balance Council
Inspection of Fabricators Precast
(A) Current ICC Reinforced Concrete Certification
(B) Precast/Prestressed Concrete Institute Level II
Bar Joist
See welding/bolting requirements
Metal Building
See welding/bolting requirements
Structural Steel
See welding/bolting requirements
Lateral Force Resistance (SR)
(A) EIT with two years related experience under supervision of a Licensed PE
Detention Basin (DB)
(A) Professional land surveyor
(B) EIT with two years related experience under supervision of a Licensed PE
Special Cases (XX)
BCC registration is limited to categories listed above. Special inspectors for special cases shall be approved
by the jurisdictional building official.
City of Greenville
Page 3